Integra Intersects 1.51 g/t AuEq Over 160.33 m, 1.50 g/t AuEq Over 115.52 m and 12.85 g/t AuEq Over 5.19 m at Sullivan Gulch
Integra Resources Corp. (ITRG) announced promising drill results from its ongoing metallurgical drill program at the DeLamar Project, specifically the Sullivan Gulch area. Key findings include:
- IDM-21-201: 0.66 g/t Au and 65.92 g/t Ag over 160.33 m
- IDM-21-202: 0.55 g/t Au and 34.51 g/t Ag over 124.06 m
- IDM-21-203: 12.04 g/t Au and 63.02 g/t Ag over 5.19 m
These results indicate extensive mineralization, with a potential strike length of 1,000 m and depth of 350 m, enhancing future studies. The Pre-feasibility Study is set to be completed in Q4 2021.
- Drilling results show significant mineralization with high-grade intercepts: IDM-21-203 yielded 12.04 g/t Au.
- Current drilling has delineated mineralization over a strike length of 1,000 m, indicating strong resource potential.
- None.
- Drill results from Sullivan Gulch located at the DeLamar Deposit include:
- IDM-21-201
- 0.66 grams per tonne (“g/t”) gold (“Au”) and 65.92 g/t silver (“Ag”) (1.51 g/t gold equivalent (“AuEq”)) over 160.33 meters (“m”)
- Including 1.32 g/t Au and 286.00 g/t Ag (5.00 g/t AuEq) over 1.52 m
- Including 2.20 g/t Au and 217.00 g/t Ag (4.99 g/t AuEq) over 3.04 m
- Including 0.55 g/t Au and 342.00 g/t Ag (4.95 g/t AuEq) over 1.98 m
- Including 5.11 g/t Au and 63.25 g/t Ag (5.92 g/t AuEq) over 1.53 m
- 0.66 grams per tonne (“g/t”) gold (“Au”) and 65.92 g/t silver (“Ag”) (1.51 g/t gold equivalent (“AuEq”)) over 160.33 meters (“m”)
- IDM-21-202
- 0.55 g/t Au and 34.51 Ag (1.00 g/t AuEq) over 124.06 m
- Including 1.59 g/t Au and 466.00 g/t Ag (7.59 g/t AuEq) over 1.53 m
- Including 0.29 g/t Au and 444.00 g/t Ag (6.01 g/t AuEq) over 1.52 m
- 0.55 g/t Au and 34.51 Ag (1.00 g/t AuEq) over 124.06 m
- IDM-21-203
- 12.04 g/t Au and 63.02 g/t Ag (12.85 g/t AuEq) over 5.19 m
- 0.66 g/t Au and 65.51 g/t Ag (1.50 g/t AuEq) over 115.52 m
- Including 0.27 g/t Au and 606.00 g/t Ag (8.07 g/t AuEq) over 1.52 m
- Including 1.74 g/t Au and 606.00 g/t Ag (9.54 g/t AuEq) over 1.53 m
- Including 4.55 g/t Au and 339.87 g/t Ag (8.93 g/t AuEq) over 4.57 m
- Including 6.65 g/t Au and 11.38 g/t Ag (6.80 g/t AuEq) over 1.52 m
- IDM-21-201
- These drill results were completed as part of a metallurgical drill program designed to further optimize unoxidized material from Sullivan Gulch for future studies.
- Drilling to date at Sullivan Gulch has delineated mineralization extending over a strike length of 1,000 m with a width of 200 m and a depth of 350 m.
- The PFS remains scheduled for completion in Q4 2021.
- To view a video of President and CEO George Salamis discussing the drill results, click on the following link: https://www.youtube.com/watch?v=6ptJtUQCSUY
VANCOUVER, British Columbia, Oct. 21, 2021 (GLOBE NEWSWIRE) -- Integra Resources Corp. (“Integra” or the “Company”) (TSX-V: ITR; NYSE American: ITRG) is pleased to announce drill results from an ongoing metallurgical drill program at the DeLamar Project (“DeLamar” or the “Project”). The drill results announced today are from Sullivan Gulch, a target east-southeast of the DeLamar Deposit. Metallurgical drilling at Sullivan Gulch has been designed to further optimize and potentially include additional mineralized material from Sullivan Gulch in future studies.
“Sullivan Gulch continues to be an exciting target for the Company, typically characterized by long widths of well-distributed mineralization. While a portion of mineralized material from Sullivan Gulch will be included in the upcoming Pre-feasibility Study, this drill program was designed to further understand the metallurgy at Sullivan Gulch and demonstrate the potential to add additional mineralized material from Sullivan Gulch to future studies on the DeLamar Project,” stated George Salamis, Integra’s President and CEO. “Sullivan Gulch remains open at depth and along strike to the south. The potential inclusion of additional mineralized material from Sullivan Gulch, subject to further optimization work, has the potential to increase future production profiles and mine life. Today’s drill results, along with drill results released in 2018 and 2019 from Sullivan Gulch, continue to showcase consistent runs of more than 100 m grading over 1 g/t AuEq.”
The following table highlights selected intercepts from the Sullivan Gulch drill results announced today:
Drill Hole | From (m) | To (m) | Interval (m) | g/t Au | g/t Ag | g/t AuEq |
IDM-21-200 | 171.30 | 197.05 | 25.75 | 0.13 | 86.72 | 1.25 |
including | 172.82 | 174.65 | 1.83 | 0.17 | 755.00 | 9.89 |
including | 195.68 | 197.05 | 1.37 | 0.22 | 231.00 | 3.20 |
IDM-21-200 | 246.89 | 251.92 | 5.03 | 0.12 | 116.89 | 1.62 |
IDM-21-201 | 170.38 | 330.71 | 160.33 | 0.66 | 65.92 | 1.51 |
including | 197.82 | 199.34 | 1.52 | 1.32 | 286.00 | 5.00 |
including | 220.68 | 223.72 | 3.04 | 2.20 | 217.00 | 4.99 |
including | 278.13 | 280.11 | 1.98 | 0.55 | 342.00 | 4.95 |
including | 318.21 | 319.74 | 1.53 | 5.11 | 63.25 | 5.92 |
IDM-21-202 | 103.02 | 227.08 | 124.06 | 0.55 | 34.51 | 1.00 |
including | 146.30 | 147.83 | 1.53 | 1.59 | 466.00 | 7.59 |
including | 224.03 | 225.55 | 1.52 | 0.29 | 444.00 | 6.01 |
IDM-21-203 | 0.00 | 5.19 | 5.19 | 12.04 | 63.02 | 12.85 |
IDM-21-203 | 208.79 | 324.31 | 115.52 | 0.66 | 65.51 | 1.50 |
including | 213.36 | 214.88 | 1.52 | 0.27 | 606.00 | 8.07 |
including | 233.17 | 234.70 | 1.53 | 1.74 | 606.00 | 9.54 |
including | 247.50 | 252.07 | 4.57 | 4.55 | 339.87 | 8.93 |
including | 272.80 | 274.32 | 1.52 | 6.65 | 11.38 | 6.80 |
(1) | Downhole thickness; true width varies depending on drill hole dip; most drill holes are aimed at intersecting the vein structures close to perpendicular therefore true widths are close to downhole widths (approximately | |
(2) | Gold equivalent = g Au/t + (g Ag/t ÷ 77.70) | |
(3) | Intervals reported are uncapped |
To view a cross section of Sullivan Gulch, click on the link below:
https://www.integraresources.com/site/assets/files/2572/sg_xn_investor_vfinal.pdf
To view a drill plan map of Sullivan Gulch, click on the link below:
https://www.integraresources.com/site/assets/files/2572/drill_collar_location_-_dm_-_full_extent_vfinal.pdf
The mineralization at Sullivan Gulch is largely hosted by porphyritic rhyolite and latite units, capped by a banded rhyolite formation, all of which are of mid-Miocene age. The gold-silver mineralization itself consists of a zone of moderately intense low-sulphidation epithermal veining, clay alteration and related disseminated sulphides (mostly pyrite). Drilling to date at Sullivan Gulch has delineated mineralization extending over a strike length of 1,000 m with a width of 200 m and a depth of 350 m. Induced polarization (“IP”) indicates the potential for mineralization to extend a further 900 m to the south.
Current Drill Status
The Company currently has 2 drill rigs in operation at the DeLamar Project. One drill rig continues to test the high-grade vein system below Florida Mountain. The second drill rig is located at War Eagle Mountain, drilling into the basement granite for the first time.
Sampling and QA/QC Procedure
Thorough QA/QC protocols are followed on the Project, including insertion of duplicate, blank and standard samples in the assay stream for all drill holes. The samples are submitted directly to American Assay Labs in Reno, Nevada for preparation and analysis. Analysis of gold is performed using fire assay method with atomic absorption (AA) finish on a 1 assay ton aliquot. Gold results over 5 g/t are re-run using a gravimetric finish. Silver analysis is performed using ICP for results up to 100 g/t on a 5 acid digestion, with a fire assay, gravimetric finish for results over 100 g/t silver.
Qualified Person
The scientific and technical information contained in this news release has been reviewed and approved by E. Max Baker Ph.D. (F.AusIMM), Integra’s Vice President Exploration, and Timothy D. Arnold (PE, SME), Integra’s Chief Operating Officer, both of Reno, Nevada. Each is a “Qualified Person” (“QP”) as defined in National Instrument 43- 101 – Standards of Disclosure for Mineral Projects.
About Integra Resources
Integra is a development-stage mining company focused on the exploration and de-risking of the past producing DeLamar Gold-Silver Project in Idaho, USA. Integra is led by the management team from Integra Gold Corp. which successfully grew, developed and sold the Lamaque Project, in Quebec, for C
ON BEHALF OF THE BOARD OF DIRECTORS
George Salamis
President, CEO and Director
CONTACT INFORMATION
Corporate Inquiries: ir@integraresources.com
Company website: www.integraresources.com
Office phone: 1 (604) 416-0576
Forward looking and other cautionary statements
This news release contains “forward-looking information” and “forward-looking statements” (collectively, “forward-looking statements”) within the meaning of the applicable Canadian securities legislation. All statements, other than statements of historical fact, are forward-looking statements and are based on expectations, estimates and projections as at the date of this news release. Any statement that involves discussion with respect to predictions, expectations, beliefs, plans, projections, objectives, assumptions, future events or performance (often, but not always using phrases such as “plans”, “expects”, “is expected”, “budget”, “scheduled”, “estimates”, “forecasts”, “intends”, “anticipates”, or “believes” or variations (including negative variations) of such words and phrases, or state that certain actions, events or results “may”, “could”, “would”, “might” or “will” be taken, occur or be achieved) are not statements of historical fact and may be forward-looking statements. In this news release, forward-looking statements relate, among other things, to: statements about the scope, timing and completion of the Pre-feasibility study; estimates of metallurgical recovery rates and the contribution of silver production to mining operations; anticipated advancement of DeLamar and future exploration prospects.These forward-looking statements, and any assumptions upon which they are based, are made in good faith and reflect our current judgment regarding the direction of our business. Management believes that these assumptions are reasonable. Forward-looking information involves known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of the Company to be materially different from any future results, performance or achievements expressed or implied by the forward-looking information. Such factors include, among others: risks related to the speculative nature of the Company’s business; the Company’s formative stage of development; the Company’s financial position; possible variations in mineralization, grade or recovery rates; actual results of current exploration activities; actual results of reclamation activities; conclusions of future economic evaluations; business integration risks; fluctuations in general macroeconomic conditions; fluctuations in securities markets; fluctuations in spot and forward prices of gold, silver, base metals or certain other commodities; fluctuations in currency markets (such as the Canadian dollar to United States dollar exchange rate); change in national and local government, legislation, taxation, controls regulations and political or economic developments; risks and hazards associated with the business of mineral exploration, development and mining (including environmental hazards, industrial accidents, unusual or unexpected formation pressures, cave-ins and flooding); inability to obtain adequate insurance to cover risks and hazards; the presence of laws and regulations that may impose restrictions on mining; employee relations; relationships with and claims by local communities and indigenous populations; availability of increasing costs associated with mining inputs and labour; the speculative nature of mineral exploration and development (including the risks of obtaining necessary licenses, permits and approvals from government authorities); and title to properties. Although the forward-looking statements contained in this news release are based upon what management of Integra believes, or believed at the time, to be reasonable assumptions, Integra cannot assure its shareholders that actual results will be consistent with such forward-looking statements, as there may be other factors that cause results not to be anticipated, estimated or intended.
Forward-looking statements contained herein are made as of the date of this news release and the Company disclaims any obligation to update any forward-looking statements, whether as a result of new information, future events or results, except as may be required by applicable securities laws. There can be no assurance that forward-looking information will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking information.
Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.
FAQ
What are the recent drill results for Integra Resources (ITRG) from Sullivan Gulch?
When is the Pre-feasibility Study for the DeLamar Project expected to be completed?