STOCK TITAN

GoGold Announces Highest Grade Drill Intercept To Date at El Favor East in Los Ricos North

Rhea-AI Impact
(Neutral)
Rhea-AI Sentiment
(Neutral)
Tags
Rhea-AI Summary

GoGold Resources announced encouraging drill results from El Favor East in the Los Ricos North project, with hole LRGF-21-107 intersecting 1.0m of an astonishing 11,307 g/t AgEq within 21.2m of 1,079 g/t AgEq. The drill program aims to expand resources by targeting both up-dip and down-dip zones. The company plans to continue aggressive resource expansion throughout 2022, capitalizing on high-grade mineralization evident in recent drill results. All data will contribute to a future resource update.

Positive
  • Drill hole LRGF-21-107 revealed high-grade silver equivalent of 11,307 g/t over 1.0m.
  • Aggressive resource expansion planned at Los Ricos district for 2022.
  • Successful intersection of wide zones of high-grade mineralization at El Favor East.
Negative
  • None.

Shares Outstanding: 278,301,117
Trading Symbols: TSX: GGD
OTCQX: GLGDF

11,307 g/t AgEq over 1.0m within 21.2m of 1,079 g/t AgEq at El Favor East

HALIFAX, NS, Feb. 2, 2022 /PRNewswire/ - GoGold Resources Inc. (TSX: GGD) (OTCQX: GLGDF) ("GoGold", "the Company") is pleased to release the results of 6 drill holes at El Favor East within Los Ricos North.  Hole LRGF-21-107 intersected 1.0m of 11,307 g/t silver equivalent ("AgEq") contained within 21.2m of 1,079 g/t AgEq. See Table 1 for breakdown of silver and gold values and Figure 1 for a cross section of LRGF-21-107. These drill holes represent data that is post resource cut-off date and will form part of a future resource update. The drill program at El Favor East is primarily focused on expansion of the resources with up-dip and down-dip drilling in addition to strike expansion on the zone towards the east.

Last fall, the  drill program at El Favor East was focused on following the zone along strike to the east with drill pads built along the historical road to the Constancia mine workings. The first phase of drilling has cut wide zones of high-grade mineralization at vertical depths near 300 metres from surface (see Figure 1). Phase 2 of the drill program will progressively drill both the fill-in holes along strike and the up-dip holes required for the 2022 Mineral Resource estimation. Crews are currently building the roadways and drill pads required to drill the new holes to follow-up on the zones discovered in holes LRGF-21-107 and LRGF-21-109.

"The results from these new holes demonstrate the importance of the El Favor East zone," said Brad Langille, President and CEO. "With these high grades and widths at depth as shown in holes 107 and 109, we have the opportunity to quickly increase the mineral resource by simply drilling the zone up to surface. 2022 will be another year of aggressive resource expansion in the Los Ricos district."

Table 1:  Drill Hole Intersections

Hole ID

Area / Vein

From

To

Length1

Au

Ag

AuEq2

AgEq2



(m)

(m)

(m)

(g/t)

(g/t)

(g/t)

(g/t)

LRGF-21-102

El Favor East

36.1

36.7

0.6

0.51

179.8

2.91

218.1


and

262.5

264.3

1.8

0.08

105.1

1.49

111.4


and

305.2

315.6

10.5

0.05

72.3

1.01

76.0

LRGF-21-104

El Favor East

30.5

31.3

0.9

0.35

88.8

1.53

114.8


and

67.2

69.6

2.4

0.14

66.4

1.03

77.0


including

68.0

68.6

0.6

0.30

177.5

2.66

199.7


and

154.1

157.5

3.4

0.68

101.4

2.04

152.6


including

154.6

155.3

0.7

1.75

230.1

4.82

361.1

LRGF-21-106

El Favor East

243.3

269.5

26.3

0.43

106.6

1.85

138.8


including

256.1

268.5

12.4

0.79

184.2

3.24

243.3


including

259.7

260.5

0.8

2.52

593.0

10.43

782.3

LRGF-21-107

El Favor East

249.3

275.0

25.7

1.55

776.4

11.90

892.3


including

250.1

271.2

21.2

1.87

938.0

14.38

1,078.5


including

258.4

262.7

4.3

8.65

4,163.8

64.17

4,812.8


including

259.1

260.2

1.0

18.23

9,940.1

150.76

11,307.3

LRGF-21-108

El Favor East

223.2

228.3

5.1

0.17

69.2

1.09

81.8


including

223.2

224.8

1.6

0.43

155.0

2.49

187.0


and

357.9

366.0

8.1

0.46

90.2

1.66

124.5


including

358.5

359.6

1.1

2.52

353.5

7.24

542.6

LRGF-21-109

El Favor East

49.5

53.2

3.7

0.34

157.9

2.45

183.4


and

223.6

287.2

63.6

0.23

109.0

1.69

126.4


including

262.2

265.2

2.9

2.36

1,109.2

17.15

1,286.0


including

264.3

265.2

0.8

4.17

2,261.9

34.33

2,574.8

1.

Not true width

2.

AqEq converted using a silver to gold ratio of 75:1 at recoveries of 100%

Figure 1: El Favor East Hole LRFG-21-107 Cross Section (CNW Group/GoGold Resources Inc.)

Figure 2: El Favor Drill Hole Locations (CNW Group/GoGold Resources Inc.)

The exploration team has been moving east of El Favor with drilling stepouts in the eastern end of El Favor, beginning with discovery hole 48, and continuing to intersect wide strong mineralization. This area is known as the El Favor East zone, and a mapping and drilling program has extended the presence of mineralization 900m to the east of hole 48 (El Favor East zone discovery hole), as shown in Figure 2. To date, approximately 800m of El Favor East has been drilled showing the strong mineralization. The drill holes in this release were not included in the initial Mineral Resource Estimate for Los Ricos North released on December 7, 2021, hole LRGF-21-094 was the final drill hole included in that resource.  

Table 2: Drill Hole Locations  

Hole ID

Easting

Northing

Elevation

Azimuth

Dip

Length

LRGF-21-102

586505

2336784

1320

180

-50

444

LRGF-21-103

586723

2336748

1291

180

-45

383

LRGF-21-104

586751

2336780

1269

180

-50

236

LRGF-21-105

586608

2336751

1344

180

-45

431

LRGF-21-106

586631

2336743

1341

180

-43

433

LRGF-21-107

586425

2336743

1321

180

-44

343

LRGF-21-108

586574

2336750

1344

180

-45

446

LRGF-21-109

586454

2336740

1325

180

-45

329

In September, the company commissioned TMC Exploracion to complete an IP survey using the Pole:Dipole array on the El Favor property. The grid consists of a network of 28 N/S profiles spaced every 100 m from L-2W to L-25E ranging in length from 0.85 to 2.0 km. The survey outlined several high chargeability anomalies representative of the sulphide mineralization along the El Favor – El Favor East zone.  A geophysical map showing anomalies and drilling targets is included as Figure 3 below.

Figure 3: Geophysical Map – El Favor (CNW Group/GoGold Resources Inc.)

El Favor is located approximately 800 meters along strike to the east of the El Orito deposit.  The longitudinal section in Figure 5 below shows that the combined systems cover approximately 2.9km in mineralized strike length over a 3.7km distance. At El Orito, wide zones of precious and base metal mineralization were cut by drill holes at El Orito at elevations between 600 to 900m.  The drill holes at El Favor have cut primarily silver-gold mineralization with trace to minor amounts of base metals at a higher elevation in the system, between 1,050m to 1,400m, compared to the semi-massive to massive base metal sulphide mineralization seen deeper in the El Orito deposit.

Figure 4: Favor Long Section (CNW Group/GoGold Resources Inc.)

Figure 5: Favor-Orito Long Section (CNW Group/GoGold Resources Inc.)

VRIFY Slide Deck and 3D Presentation
VRIFY is a platform being used by companies to communicate with investors using 360° virtual tours of remote mining assets, 3D models and interactive presentations. VRIFY can be accessed by website and with the VRIFY iOS and Android apps.

The VRIFY Slide Deck and 3D Presentation for GoGold can be viewed at: https://vrify.com/decks/10437 and on the Company's website at: www.gogoldresources.com.

Los Ricos District Exploration Projects
The Company's two exploration projects at its Los Ricos Property are in Jalisco state, Mexico. The Los Ricos South Project began in March 2019 and an initial Mineral Resource was announced on July 29, 2020 which disclosed a Measured & Indicated Mineral Resource of 63.7 million ounces AgEq grading 199 g/t AgEq contained in 10.0 million tonnes, and an Inferred Mineral Resource of 19.9 million ounces AgEq grading 190 g/t AgEq contained in 3.3 million tonnes. An initial PEA on the project was announced on January 20, 2021 indicating an NPV5% of US$295M.

The Los Ricos North Project was launched in March 2020 and an initial Mineral Resource was announced on December 7, 2021, which disclosed an Indicated Mineral Resource of 87.8 million ounces AgEq grading 122 g/t AgEq contained in 22.3 million tonnes, and an Inferred Mineral Resource of 73.2 million ounces AgEq grading 111 g/t AgEq contained in 20.5 million tonnes. The Company has a drill program for an additional 100,000 metres of drilling for 2022 in place.

Procedure, Quality Assurance / Quality Control and Data Verification 
The diamond drill core (HQ size) is geologically logged, photographed and marked for sampling. When the sample lengths are determined, the full core is sawn with a diamond blade core saw with one half of the core being bagged and tagged for assay. The remaining half portion is returned to the core trays for storage and/or for metallurgical test work. 

The sealed and tagged sample bags are transported to the ActLabs facility in Zacatecas, Mexico. ActLabs crushes the samples and prepares 200-300 gram pulp samples with ninety percent passing Tyler 150 mesh (106μm). The pulps are assayed for gold using a 50-gram charge by fire assay (Code 1A2-50) and over limits greater than 10 grams per tonne are re-assayed using a gravimetric finish (Code 1A3-50). Silver and multi-element analysis is completed using total digestion (Code 1F2 Total Digestion ICP). Over limits greater than 100 grams per tonne silver are re-assayed using a gravimetric finish (Code 8-Ag FA-GRAV Ag).

Quality assurance and quality control ("QA/QC") procedures monitor the chain-of-custody of the samples and includes the systematic insertion and monitoring of appropriate reference materials (certified standards, blanks and duplicates) into the sample strings. The results of the assaying of the QA/QC material included in each batch are tracked to ensure the integrity of the assay data. All results stated in this announcement have passed GoGold's QA/QC protocols.

Mr. David Duncan, P. Geo. is the qualified person as defined by National Instrument 43-101 and is responsible for the technical information of this release. 

About GoGold Resources
GoGold Resources (TSX: GGD) is a Canadian-based silver and gold producer focused on operating, developing, exploring and acquiring high quality projects in Mexico.  The Company operates the Parral Tailings mine in the state of Chihuahua and has the Los Ricos South and Los Ricos North exploration projects in the state of Jalisco. Headquartered in Halifax, NS, GoGold is building a portfolio of low cost, high margin projects. For more information visit gogoldresources.com.

CAUTIONARY STATEMENT:
The securities described herein have not been, and will not be, registered under the United States Securities Act of 1933, as amended (the "U.S. Securities Act"), or any state securities laws, and may not be offered or sold within the United States or to, or for the benefit of, U.S. persons (as defined in Regulation S under the U.S. Securities Act) except in compliance with the registration requirements of the U.S. Securities Act and applicable state securities laws or pursuant to exemptions therefrom. This release does not constitute an offer to sell or a solicitation of an offer to buy of any of GoGold's securities in the United States.

This news release may contain "forward-looking information" as defined in applicable Canadian securities legislation. All statements other than statements of historical fact, included in this release, including, without limitation, statements regarding the Los Ricos South and North projects, and future plans and objectives of GoGold, including the intention to undertake further exploration at Los Ricos North, and the prospect of further discoveries there, constitute forward looking information that involve various risks and uncertainties. Forward-looking information is based on a number of factors and assumptions which have been used to develop such information but which may prove to be incorrect, including, but not limited to, assumptions in connection with the continuance of GoGold and its subsidiaries as a going concern, general economic and market conditions, mineral prices, the accuracy of mineral resource estimates, and the performance of the Parral project. There can be no assurance that such information will prove to be accurate and actual results and future events could differ materially from those anticipated in such forward-looking information.

Important factors that could cause actual results to differ materially from GoGold's expectations include exploration and development risks associated with GoGold's projects, the failure to establish estimated mineral resources or mineral reserves, volatility of commodity prices, variations of recovery rates, and global economic conditions. For additional information with respect to risk factors applicable to GoGold, reference should be made to GoGold's continuous disclosure materials filed from time to time with securities regulators, including, but not limited to, GoGold's Annual Information Form. The forward-looking information contained in this release is made as of the date of this release.

Cision View original content to download multimedia:https://www.prnewswire.com/news-releases/gogold-announces-highest-grade-drill-intercept-to-date-at-el-favor-east-in-los-ricos-north-301473625.html

SOURCE GoGold Resources Inc.

FAQ

What are the latest drill results from GoGold Resources (GLGDF)?

GoGold Resources reported drill hole LRGF-21-107 intersecting 1.0m of 11,307 g/t AgEq at El Favor East within the Los Ricos North project.

What is GoGold's plan for resource expansion in 2022?

GoGold plans an aggressive resource expansion at its Los Ricos district, focusing on follow-up drilling at the El Favor East zone.

What is the significance of the drill hole LRGF-21-107 for investors in GoGold (GLGDF)?

The exceptional results from hole LRGF-21-107 could lead to increased mineral resource estimates, potentially benefiting investors through enhanced company valuation.

How will the new drill results affect GoGold's future resource update?

The new drill results, including high-grade intersections, will be included in a future resource update, likely improving resource estimates for the Los Ricos North project.

GOGOLD RESOURCES INC ORD

OTC:GLGDF

GLGDF Rankings

GLGDF Latest News

GLGDF Stock Data

280.58M
304.31M
6.41%
28.8%
Other Precious Metals & Mining
Basic Materials
Link
United States of America
Halifax