FuelCell Energy reported financial results for Q1 2023, showcasing revenues of $37.1 million, a 17% increase from $31.8 million in Q1 2022. The company generated a gross profit of $5.2 million, a significant recovery from a gross loss of $(2.9) million the previous year. Loss from operations improved to $(22.5) million, down from $(44.8) million. The net loss per share was $(0.05), compared to $(0.11) last year. FuelCell's cash and short-term investments stand at over $400 million. Key project updates include progress on the Toyota and Derby projects expected to reach commercial operation in 2023, and the ongoing partnership with ExxonMobil aimed at carbon capture solutions.
- Revenues increased by 17% to $37.1 million.
- Gross profit of $5.2 million, reversing a previous gross loss.
- Loss from operations improved by 50% compared to the prior year.
- Strong cash position of over $400 million supports growth initiatives.
- Recurring generation revenues increased by 27%.
- Net loss of $(21.1) million, though improved from the previous year's $(46.1) million.
- Product revenues declined from $18.0 million to $9.1 million.
- Total backlog decreased by 19% to $1.06 billion.
First Quarter Fiscal 2023 Financial Highlights
(All comparisons are year-over-year unless otherwise noted)
- Revenues of
$37.1 million compared to$31.8 million - Gross profit of
$5.2 million compared to a gross loss of$(2.9) million - Loss from operations of
$(22.5) million compared to$(44.8) million - Net loss per share was
$(0.05) compared to$(0.11)
DANBURY, Conn., March 09, 2023 (GLOBE NEWSWIRE) -- FuelCell Energy, Inc. (Nasdaq: FCEL) -- a global leader in decarbonizing power and producing hydrogen through its proprietary, state-of-the-art fuel cell platforms to enable a world empowered by clean energy -- today reported financial results for its first quarter ended January 31, 2023.
“For the first quarter of fiscal year 2023, we reported strong revenue growth, up
“We remain focused on executing our project backlog and growing our generation operating portfolio and expect the Toyota and Derby projects to achieve commercial operation during calendar year 2023,” continued Mr. Few. “Regarding our continued work with ExxonMobil Technology and Engineering Company, or EMTEC, we announced in December that we have extended the term of our Joint Development Agreement through August 31, 2023, and increased the maximum amount of contract consideration to be reimbursed by EMTEC by
Mr. Few added, “We continue to make progress towards scaling manufacturing with the goal of delivering our solid oxide fuel cell platform, which can create energy from a number of available energy sources – from renewables, hydrogen, biogas, or natural gas. We have amended our existing lease to more than double the square footage of our Calgary-based manufacturing facility and are continuing our capital investment in equipment needed to complete our first phase of scaling our production capacity. Subsequent to the quarter end, we announced a memorandum of understanding regarding our intent to collaborate with a subsidiary of Malaysia Marine and Heavy Engineering Holdings Berhad (KLSE: MHB) on the development of large-scale electrolyzer facilities based on our solid oxide technology for the Asian, New Zealand and Australian markets. Together, we expect to increase the efficiency and simultaneously reduce the cost of green hydrogen production, with the goal of making large-scale clean hydrogen production an easily accessible and viable energy option.”
Mr. Few concluded, “As mentioned previously, we expect the U.S. Inflation Reduction Act to be a key driver of growth in renewable technologies, and we continue to see broad support for the energy transition through legislation and economic incentives globally. For example, the European Union recently proposed an approximately
Consolidated Financial Metrics
In this press release, FuelCell Energy refers to various GAAP (U.S. generally accepted accounting principles) and non-GAAP financial measures. The non-GAAP financial measures may not be comparable to similarly titled measures being used and disclosed by other companies. FuelCell Energy believes that this non-GAAP information is useful to an understanding of its operating results and the ongoing performance of its business. A reconciliation of EBITDA, Adjusted EBITDA and any other non-GAAP measures is contained in the appendix to this press release.
Three Months Ended January 31, | ||||||||||||||
(Amounts in thousands) | 2023 | 2022 | Change | |||||||||||
Total revenues | $ | 37,073 | $ | 31,795 | 17 | % | ||||||||
Gross profit (loss) | 5,237 | (2,895 | ) | 281 | % | |||||||||
Loss from operations | (22,455 | ) | (44,844 | ) | 50 | % | ||||||||
Net loss | (21,086 | ) | (46,120 | ) | 54 | % | ||||||||
Net loss attributable to common stockholders | (19,422 | ) | (41,424 | ) | 53 | % | ||||||||
Net loss per basic and diluted share | $ | (0.05 | ) | $ | (0.11 | ) | 55 | % | ||||||
EBITDA | (17,050 | ) | (39,073 | ) | 56 | % | ||||||||
Adjusted EBITDA | $ | (14,413 | ) | $ | (13,603 | ) | (6 | %) |
First Quarter of Fiscal 2023 Results
Note: All comparisons between periods are between the first quarter of fiscal 2023 and the first quarter of fiscal 2022, unless otherwise specified.
First quarter revenue of
- Product revenues for the three months ended January 31, 2023 were
$9.1 million compared to$18.0 million for the three months ended January 31, 2022. Our December 2021 Settlement Agreement (the “Settlement Agreement”) with POSCO Energy Co., Ltd. (“POSCO Energy”) and its subsidiary, Korea Fuel Cell Co., Ltd. (“KFC”), included an option to purchase an additional 14 modules (in addition to the 20 modules that were purchased by KFC during fiscal year 2022). This option included a material right related to an extended warranty obligation for the modules. The option was not exercised by KFC as of the expiration date of December 31, 2022 and, as a result, the Company recognized$9.1 million of product revenues during the three months ended January 31, 2023, which represents the consideration allocated to the material right if the option had been exercised. Product revenues for the three months ended January 31, 2022 were a result of module sales to KFC under the Settlement Agreement for which the Company recognized$18.0 million on the Ex Works delivery of six modules from the Company’s facility in Torrington, CT in January 2022. - Service agreements revenues increased to
$13.9 million from$2.2 million . Service agreements revenues recognized during the first quarter of fiscal 2023 were primarily driven by new module exchanges at the plant in Woodbridge, CT, which originally achieved commercial operations in fiscal year 2017, and at the plants owned by KOSPO in Korea, which achieved commercial operations in fiscal year 2018. The increase in revenues for the first quarter of fiscal 2023 is primarily due to the fact that new module exchanges occurred during the quarter, while there were no new module exchanges during the comparable prior year quarter. - Generation revenues increased
27% to$9.6 million from$7.5 million , primarily due to the fact that we recorded a full quarter of generation revenues associated with the Long Island Power Authority (“LIPA”) project in Yaphank, New York (which achieved commercial operations in December 2021) and the fact that the project at the U.S. Navy Submarine Base in Groton, Connecticut (the “Groton Project”) achieved commercial operations and began generating revenues in the first quarter of fiscal 2023. - Advanced Technologies contract revenues increased
10% to$4.5 million from$4.1 million . Compared to the first quarter of fiscal 2022, Advanced Technologies contract revenues recognized under the Joint Development Agreement with EMTEC were approximately$0.1 million higher during the first quarter of fiscal 2023, and revenue recognized under government and other contracts were approximately$0.3 million higher during the first quarter of fiscal 2023.
Gross profit for the first quarter of fiscal 2023 totaled
Operating expenses for the first quarter of fiscal 2023 decreased to
Net loss was
Adjusted EBITDA totaled
The net loss per share attributable to common stockholders in the first quarter of fiscal 2023 was
Cash, Restricted Cash and Short-Term Investments
Cash and cash equivalents, restricted cash and cash equivalents, and short-term investments totaled
- As of January 31, 2023, unrestricted cash and cash equivalents totaled
$315.2 million compared to$458.1 million as of October 31, 2022. - As of January 31, 2023, restricted cash and cash equivalents was
$24.6 million , of which$4.5 million was classified as current and$20.2 million was classified as non-current, compared to$23.0 million of restricted cash and cash equivalents as of October 31, 2022, of which$4.4 million was classified as current and$18.6 million was classified as non-current. - As of January 31, 2023, our short-term investment in U.S. Treasury Securities maturing in 2023 totaled
$75.7 million , and there was no comparable short-term investment as of October 31, 2022.
Operations Update
In-flight projects: During the quarter, the Company continued to make progress on projects for which we have executed power and/or hydrogen purchase agreements, with updates regarding certain current projects provided below.
Toyota - Port of Long Beach, CA. This 2.8 MW Tri-generation platform will produce electricity (at an expected net output of 2.3 MW), hydrogen and water. We have completed the construction work on this Tri-generation project at the Port of Long Beach for Toyota (the “Toyota project”), and the fuel cell platform has advanced to the commissioning phase of project deployment. We anticipate that the remaining commissioning activity will be completed in the third fiscal quarter of 2023. The current contractually required commercial operations date is July 8, 2023. In the event that we do not achieve commercial operations on or before the deadline of July 8, 2023, Toyota will have the right to terminate its hydrogen power purchase agreement.
Derby, CT. On-site civil construction of this 14 MW project continues to advance and the Company has largely completed the foundational construction, with the majority of the balance of plant components delivered and installed on site. This utility scale fuel cell platform will contain five SureSource 3000 fuel cell systems that will be installed on engineered platforms alongside the Housatonic River. To date, the Company has invested approximately
Manufacturing Output, Capacity and Expansion: We have made progress in advancing our carbonate and solid oxide platform capacity expansion plans.
Carbonate Platform: During the three months ended January 31, 2023, we operated at an annualized production rate of approximately 38.2 MW, which is in-line with the annualized production rate achieved for the three months ended January 31, 2022. For fiscal year 2023, we are planning to operate at a 45 MW annualized production rate in support of project backlog and service requirements.
At this time, the maximum annualized capacity (module manufacturing, final assembly, testing and conditioning) is 100 MW per year under the Torrington facility’s current configuration when fully utilized. The Torrington facility is sized to accommodate the eventual annualized production capacity of up to 200 MW per year with additional capital investment in machinery, equipment, tooling, labor and inventory.
The Company continues to invest in capability with the goal of reducing production bottlenecks and driving productivity, including investments in automation, laser welding, and the construction of additional integrated conditioning capacity. The Company also constructed a SureSource 1500 in Torrington during fiscal year 2022, which operates as a testing facility for qualifying new supplier components and performance testing and validation of continued platform innovations. During fiscal year 2023, the Company expects to invest in adding the engineered carbon separation capability to the onsite SureSource 1500, which will allow potential customers to observe the operating plant and, given the targeted market of food and beverage companies, will allow for the sampling and testing of separated CO2 to verify quantity, quality or purity requirements.
Solid Oxide Platform: During the first quarter of fiscal 2023, Versa Power Systems Ltd. (“Versa”), a subsidiary of FuelCell Energy, entered into a lease expansion, extension and amending agreement which expanded the space to be leased by Versa in Calgary, Alberta, Canada to include an additional approximately 48,000 square feet, for a total of approximately 80,000 square feet of space. Additionally, long-lead process equipment has been ordered to facilitate the expansion of manufacturing capacity for the solid oxide platforms in Calgary. Upon the completion of the Calgary capacity expansion, the Company expects that it will be able to increase annual production capacity and that it will be capable of delivering up to 40 MWs of annualized electrolysis production per year.
During calendar year 2023, our Calgary manufacturing operation is expected to build and deliver four units: two units that will run internally for advanced testing and two first article production units for delivery externally. Of these commercial units for external delivery, one will be our electrolysis platform for delivery to Idaho National Laboratory, and the other will be our distributed power platform for delivery to Trinity College in Hartford, Connecticut for use under a long-term power purchase agreement.
The expansion of the Calgary manufacturing facility is phase 1 of the Company’s planned operational expansion of production capability. While this expansion is expected to increase our production capacity from 4 MWs per year to 40 MWs per year of solid oxide electrolyzers, the Company has plans to add an additional 400 MW of solid oxide manufacturing capacity in the United States. While the location of the facility has not yet been determined, early facility design and engineering requirements have been developed. We anticipate announcing more details regarding our plans for solid oxide production expansion into the United States later this fiscal year.
Backlog
As of January 31, | |||||||||
(Amounts in thousands) | 2023 | 2022 | Change | ||||||
Product | $ | - | $ | 60,247 | $ | (60,247 | ) | ||
Service | 99,852 | 123,722 | (23,870 | ) | |||||
Generation | 934,484 | 1,091,510 | (157,026 | ) | |||||
Advanced Technologies | 26,771 | 31,699 | (4,928 | ) | |||||
Total Backlog | $ | 1,061,107 | $ | 1,307,178 | $ | (246,071 | ) |
Backlog decreased by approximately
Backlog represents definitive agreements executed by the Company and our customers. Projects for which we have an executed power purchase agreement (“PPA”) are included in generation backlog, which represents future revenue under long-term PPAs. The Company’s ability to recognize revenue in the future under a PPA is subject to the Company’s completion of construction of the project covered by such PPA. Should the Company not complete the construction of the project covered by a PPA, it will forgo future revenues with respect to the project and may incur penalties and/or impairment charges related to the project. Projects sold to customers (and not retained by the Company) are included in product sales and service agreements backlog, and the related generation backlog is removed upon sale. Together, the service and generation portion of backlog had a weighted average term of approximately 17 years, with weighting based on the dollar amount of backlog and utility service contracts of up to 20 years in duration at inception.
Conference Call Information
FuelCell Energy will host a conference call today beginning at 10:00 a.m. ET to discuss first quarter results for fiscal year 2023 as well as key business highlights. Participants can access the live call via webcast on the Company website or by telephone as follows:
- The live webcast of the call and supporting slide presentation will be available at www.fuelcellenergy.com. To listen to the call, select “Investors” on the home page located under the “Our Company” pull-down menu, proceed to the “Events & Presentations” page and then click on the “Webcast” link listed under the March 9th earnings call event, or click here.
- Alternatively, participants can dial 646-960-0699 and state FuelCell Energy or the conference ID number 1099808.
The replay of the conference call will be available via webcast on the Company’s Investors’ page at www.fuelcellenergy.com approximately two hours after the conclusion of the call.
Cautionary Language
This news release contains forward-looking statements within the meaning of the safe harbor provisions of the Private Securities Litigation Reform Act of 1995 regarding future events or our future financial performance that involve certain contingencies and uncertainties, including those discussed in our Annual Report on Form 10-K for the fiscal year ended October 31, 2022 in the section entitled "Management's Discussion and Analysis of Financial Condition and Results of Operations”. The forward-looking statements include, without limitation, statements with respect to the Company’s anticipated financial results and statements regarding the Company’s plans and expectations regarding the continuing development, commercialization and financing of its current and future fuel cell technologies, the expected timing of completion of the Company’s ongoing projects, the Company’s business plans and strategies, the Company’s capacity expansion and the markets in which the Company expects to operate. Projected and estimated numbers contained herein are not forecasts and may not reflect actual results. These forward-looking statements are not guarantees of future performance, and all forward-looking statements are subject to risks and uncertainties that could cause actual results to differ materially from those projected. Factors that could cause such a difference include, without limitation: general risks associated with product development and manufacturing; general economic conditions; changes in interest rates, which may impact project financing; supply chain disruptions; changes in the utility regulatory environment; changes in the utility industry and the markets for distributed generation, distributed hydrogen, and fuel cell power plants configured for carbon capture or carbon separation; potential volatility of commodity prices that may adversely affect our projects; availability of government subsidies and economic incentives for alternative energy technologies; our ability to remain in compliance with U.S. federal and state and foreign government laws and regulations and the listing rules of The Nasdaq Stock Market; rapid technological change; competition; the risk that our bid awards will not convert to contracts or that our contracts will not convert to revenue; market acceptance of our products; changes in accounting policies or practices adopted voluntarily or as required by accounting principles generally accepted in the United States; factors affecting our liquidity position and financial condition; government appropriations; the ability of the government and third parties to terminate their development contracts at any time; the ability of the government to exercise “march-in” rights with respect to certain of our patents; our ability to successfully market and sell our products internationally; our ability to develop new products to achieve our long-term revenue targets; our ability to implement our strategy; our ability to reduce our levelized cost of energy and deliver on our cost reduction strategy generally; our ability to protect our intellectual property; litigation and other proceedings; the risk that commercialization of our new products will not occur when anticipated or, if it does, that we will not have adequate capacity to satisfy demand; our need for and the availability of additional financing; our ability to generate positive cash flow from operations; our ability to service our long-term debt; our ability to increase the output and longevity of our platforms and to meet the performance requirements of our contracts; our ability to expand our customer base and maintain relationships with our largest customers and strategic business allies; and concerns with, threats of, or the consequences of, pandemics, contagious diseases or health epidemics, including the novel coronavirus, and resulting supply chain disruptions, shifts in clean energy demand, impacts to our customers’ capital budgets and investment plans, impacts to our project schedules, impacts to our ability to service existing projects, and impacts on the demand for our products, as well as other risks set forth in the Company’s filings with the Securities and Exchange Commission, including the Company’s Annual Report on Form 10-K for the fiscal year ended October 31, 2022. The forward-looking statements contained herein speak only as of the date of this press release. The Company expressly disclaims any obligation or undertaking to release publicly any updates or revisions to any such statement contained or incorporated by reference herein to reflect any change in the Company’s expectations or any change in events, conditions or circumstances on which any such statement is based.
About FuelCell Energy
FuelCell Energy, Inc. (NASDAQ: FCEL): FuelCell Energy is a global leader in sustainable clean energy technologies that address some of the world’s most critical challenges around energy access, security, safety and environmental stewardship. As a leading global manufacturer of proprietary fuel cell technology platforms, FuelCell Energy is uniquely positioned to serve customers worldwide with sustainable products and solutions for industrial and commercial businesses, utilities, governments, and municipalities.
SureSource, SureSource 1500, SureSource 3000, SureSource 4000, SureSource Recovery, SureSource Capture, SureSource Hydrogen, SureSource Storage, SureSource Service, SureSource Capital, FuelCell Energy, and FuelCell Energy logo are all trademarks of FuelCell Energy, Inc.
Contact:
FuelCell Energy, Inc.
ir@fce.com
203.205.2491
Source: FuelCell Energy
FUELCELL ENERGY, INC.
Consolidated Balance Sheets
(Unaudited)
(Amounts in thousands, except share and per share amounts)
January 31, 2023 | October 31, 2022 | ||||||
ASSETS | |||||||
Current assets: | |||||||
Cash and cash equivalents, unrestricted | $ | 315,168 | $ | 458,055 | |||
Restricted cash and cash equivalents – short-term | 4,456 | 4,423 | |||||
Investments – short-term | 75,652 | - | |||||
Accounts receivable, net | 3,213 | 4,885 | |||||
Unbilled receivables | 13,711 | 11,019 | |||||
Inventories | 101,176 | 90,909 | |||||
Other current assets | 11,545 | 10,989 | |||||
Total current assets | 524,921 | 580,280 | |||||
Restricted cash and cash equivalents – long-term | 20,155 | 18,566 | |||||
Inventories – long-term | 7,549 | 7,549 | |||||
Project assets, net | 229,914 | 232,886 | |||||
Property, plant and equipment, net | 63,338 | 58,137 | |||||
Operating lease right-of-use assets, net | 8,997 | 7,189 | |||||
Goodwill | 4,075 | 4,075 | |||||
Intangible assets, net | 17,049 | 17,373 | |||||
Other assets | 16,385 | 13,662 | |||||
Total assets (1) | $ | 892,383 | $ | 939,717 | |||
LIABILITIES AND STOCKHOLDERS’ EQUITY | |||||||
Current liabilities: | |||||||
Current portion of long-term debt | $ | 13,249 | $ | 13,198 | |||
Current portion of operating lease liabilities | 557 | 650 | |||||
Accounts payable | 24,590 | 28,196 | |||||
Accrued liabilities | 20,313 | 27,415 | |||||
Deferred revenue | 7,366 | 16,341 | |||||
Total current liabilities | 66,075 | 85.800 | |||||
Long-term deferred revenue and customer deposits | - | 9,095 | |||||
Long-term operating lease liabilities | 9,503 | 7,575 | |||||
Long-term debt and other liabilities | 81,575 | 82,863 | |||||
Total liabilities (1) | 157,153 | 185,333 | |||||
Redeemable Series B preferred stock (liquidation preference of | 59,857 | 59,857 | |||||
Redeemable noncontrolling interest | - | 3,030 | |||||
Total equity: | |||||||
Stockholders’ equity: | |||||||
Common stock ( | 41 | 41 | |||||
Additional paid-in capital | 2,095,667 | 2,094,076 | |||||
Accumulated deficit | (1,426,595 | ) | (1,407,973 | ) | |||
Accumulated other comprehensive loss | (1,305 | ) | (1,752 | ) | |||
Treasury stock, Common, at cost (163,943 and 142,837 shares as of January 31, 2023 and October 31, 2022, respectively) | (923 | ) | (855 | ) | |||
Deferred compensation | 923 | 855 | |||||
Total stockholder’s equity | 667,808 | 684,392 | |||||
Noncontrolling interests | 7,565 | 7,105 | |||||
Total equity | 675,373 | 691,497 | |||||
Total liabilities, redeemable Series B preferred stock, redeemable noncontrolling interest and total equity | $ | 892,383 | $ | 939,717 |
(1) As of January 31, 2023 and October 31, 2022, the consolidated assets of the variable interest entity (“VIE”) were
FUELCELL ENERGY, INC.
Consolidated Statements of Operations and Comprehensive Loss
(Unaudited)
(Amounts in thousands, except share and per share amounts)
Three Months Ended January 31, | ||||||||||
2023 | 2022 | |||||||||
Revenues: | ||||||||||
Product | $ | 9,095 | $ | 18,000 | ||||||
Service | 13,882 | 2,167 | ||||||||
Generation | 9,557 | 7,496 | ||||||||
Advanced Technologies | 4,539 | 4,132 | ||||||||
Total revenues | 37,073 | 31,795 | ||||||||
Costs of revenues: | ||||||||||
Product | 1,029 | 18,207 | ||||||||
Service | 10,945 | 2,372 | ||||||||
Generation | 16,602 | 10,722 | ||||||||
Advanced Technologies | 3,260 | 3,389 | ||||||||
Total costs of revenues | 31,836 | 34,690 | ||||||||
Gross profit (loss) | 5,237 | (2,895 | ) | |||||||
Operating expenses: | ||||||||||
Administrative and selling expenses | 15,009 | 36,965 | ||||||||
Research and development expenses | 12,683 | 4,984 | ||||||||
Total costs and expenses | 27,692 | 41,949 | ||||||||
Loss from operations | (22,455 | ) | (44,844 | ) | ||||||
Interest expense | (1,512 | ) | (1,428 | ) | ||||||
Interest income | 3,410 | 10 | ||||||||
Other income, net | 49 | 142 | ||||||||
Loss before provision for income taxes | (20,508 | ) | (46,120 | ) | ||||||
Provision for income taxes | (578 | ) | - | |||||||
Net loss | (21,086 | ) | (46,120 | ) | ||||||
Net loss attributable to noncontrolling interest | (2,464 | ) | (5,496 | ) | ||||||
Net loss attributable to FuelCell Energy, Inc. | (18,622 | ) | (40,624 | ) | ||||||
Series B preferred stock dividends | (800 | ) | (800 | ) | ||||||
Net loss attributable to common stockholders | $ | (19,422 | ) | $ | (41,424 | ) | ||||
Loss per share basic and diluted: | ||||||||||
Net loss per share attributable to common stockholders | $ | (0.05 | ) | $ | (0.11 | ) | ||||
Basic and diluted weighted average shares outstanding | 405,803,753 | 366,734,739 |
Appendix
Non-GAAP Financial Measures
Financial results are presented in accordance with accounting principles generally accepted in the United States (“GAAP”). Management also uses non-GAAP measures to analyze and make operating decisions on the business. Earnings before interest, taxes, depreciation and amortization (“EBITDA”) and Adjusted EBITDA are non-GAAP measures of operations and operating performance by the Company.
These supplemental non-GAAP measures are provided to assist readers in assessing operating performance. Management believes EBITDA and Adjusted EBITDA are useful in assessing performance and highlighting trends on an overall basis. Management also believes these measures are used by companies in the fuel cell sector and by securities analysts and investors when comparing the results of the Company with those of other companies. EBITDA differs from the most comparable GAAP measure, net loss attributable to the Company, primarily because it does not include finance expense, income taxes and depreciation of property, plant and equipment and project assets. Adjusted EBITDA adjusts EBITDA for stock-based compensation, restructuring charges and other unusual items such as the non-recurring legal expense related to the settlement of the POSCO Energy legal proceedings recorded during the first quarter of fiscal 2022, which are considered either non-cash or non-recurring.
While management believes that these non-GAAP financial measures provide useful supplemental information to investors, there are limitations associated with the use of these measures. The measures are not prepared in accordance with GAAP and may not be directly comparable to similarly titled measures of other companies due to potential differences in the exact method of calculation. The Company’s non-GAAP financial measures are not meant to be considered in isolation or as a substitute for comparable GAAP financial measures and should be read only in conjunction with the Company’s consolidated financial statements prepared in accordance with GAAP.
The following table calculates EBITDA and Adjusted EBITDA and reconciles these figures to the GAAP financial statement measure Net loss.
Three Months Ended January 31, | |||||||||||
(Amounts in thousands) | 2023 | 2022 | |||||||||
Net loss | $ | (21,086 | ) | $ | (46,120 | ) | |||||
Depreciation and amortization (1) | 5,405 | 5,771 | |||||||||
Provision for income tax | 578 | - | |||||||||
Other income, net (2) | (3,459 | ) | (152 | ) | |||||||
Interest expense | 1,512 | 1,428 | |||||||||
EBITDA | (17,050 | ) | (39,073 | ) | |||||||
Share-based compensation expense | 2,637 | 1,470 | |||||||||
Legal fees incurred for a legal settlement (3) | - | 24,000 | |||||||||
Adjusted EBITDA | $ | (14,413 | ) | $ | (13,603 | ) |
(1) Includes depreciation and amortization on our Generation portfolio of
(2) Other income, net includes gains and losses from transactions denominated in foreign currencies, changes in fair value of derivatives, income earned from investments and other items incurred periodically, which are not the result of the Company’s normal business operations.
(3) The Company recorded legal fees of
FAQ
What were FuelCell Energy's revenues for Q1 2023?
How did FuelCell Energy's gross profit change in Q1 2023?
What is FuelCell Energy's net loss per share for Q1 2023?
What is the status of FuelCell Energy's project backlog?