enCore Energy Provides Update on the South Texas Alta Mesa ISR Uranium Central Processing Plant and Wellfield
- Continuing positive results from the wellfield delineation drill program
- Advancing production for the Rosita CPP
- Leveraging resources to restart the Alta Mesa CPP and become a domestic solution to global uranium demand needs
- None.
NYSE American:EU
TSXV:EU
www.encoreuranium.com
At the Alta Mesa CPP, enCore continues work on the refurbishment of the processing circuits. The elution circuit, used to strip uranium from the ion exchange beads, has been completed, and represents a significant milestone in the pathway for production restart. All of the process pumps for the startup IX circuit have been rebuilt and replaced, including the main injection pumps. We anticipate completing the refurbishment of the startup portion of the IX circuit before the end of 2023.
The yellowcake processing circuit refurbishment has started with the rebuilding of key components of the yellowcake storage systems and ordering of long lead time items such as the filter press and yellowcake transfer pumps. Refurbishment work commenced on the yellowcake drying system, and that work is expected to be completed just prior to the anticipated production restart date.
Within Production Authorization Area 7 (PAA-7), enCore is installing injection and production wells in the wellfield and has received and staged the equipment to install the pipelines to connect the wellfield to the Alta Mesa CPP. All of the necessary equipment for the start-up of production in the PAA-7 wellfield has been received or has been ordered with a confirmed delivery schedule.
Paul Goranson, enCore's Chief Executive Officer stated "The uranium spot market is presenting prices that have not been seen since prior to 2011. The driving force for the market is increased demand as supply continues to be constrained, principally due to uranium supply chain challenges created by geopolitical conditions and the projected rapid increase in demand for uranium and nuclear power. At enCore, we are leveraging our experience and resources toward the restart of the Alta Mesa CPP to become a domestic solution to the global uranium demand needs. I am pleased with the progress at Alta Mesa, we are continuing to build a competent team to get the Project to production and look forward to expansion."
There are currently six (6) drill rigs in full operation at the Alta Mesa CPP and Wellfield, with contracts pending for three (3) additional rigs. The wellfield drilling operations, delineating the roll front mineralization within PAA-7, which commenced in March 2023, are advancing rapidly with 92 holes drilled since the previous update (September 5, 2023). In total, 367 drill holes have been completed through November 17, 2023.
Further refined delineation drilling within the PAA-7 continues to establish the exact pattern of injection and recovery wells from which to maximize production efficiency. To date, eighty-six (86) holes have been cased with seventeen (17) holes completed. Two (2) drill rigs are currently casing with one (1) drill rig focused on completion activities. An additional drill rig will be moving to completion activities in the coming weeks.
To view the Alta Mesa CPP and Wellfield maps and the
Significant Alta Mesa Wellfield drilling program highlights reported herein include:
Drill Hole | Goliad Sandstone Horizon | Depth | Grade % | Thickness | Grade | Total |
170-92 | MCM-1 | 431.0 | 0.105 | 3.5 | 0.366 | |
LCL-1 | 526.0 | 0.110 | 1.5 | 0.164 | ||
LCL-2 | 530.5 | 0.094 | 3.0 | 0.282 | 0.812 | |
171-99 | LCU-1 | 489.5 | 0.123 | 2.0 | 0.247 | |
LCL-1 | 510.5 | 0.116 | 5.0 | 0.582 | 0.829 | |
170-110 | LCL-1 | 511.0 | 0.133 | 4.0 | 0.531 | 0.531 |
166-114 | LCU-1 | 490.5 | 0.072 | 1.5 | .108 | |
LCU-2 | 501.5 | 0.080 | 2.5 | 0.201 | ||
LCL-1 | 505.5 | 0.160 | 10.0 | 1.600 | 1.909 | |
181-92 | LCU-1 | 496.0 | 0.244 | 6.0 | 1.465 | 1.465 |
166-113 | LCL-1 | 499.5 | 0.186 | 5.5 | 1.026 | 1.026 |
169-104 | MCU-1 | 419.5 | 0.138 | 2.0 | 0.276 | |
LCU-1 | 492.5 | 0.121 | 2.5 | 0.303 | 0.579 | |
168-110 | LCU-1 | 494.0 | 0.079 | 3.0 | 0.237 | |
LCU-2 | 498.0 | 0.079 | 3.5 | 0.278 | 0.515 | |
156-115 | LCL-1 | 511.0 | 0.080 | 2.5 | 0.200 | |
LCL-2 | 516.5 | 0.452 | 6.0 | 2.709 | 2.909 | |
166-110 | LCL-1 | 511.5 | 0.169 | 5.0 | 0.847 | 0.847 |
169-105 | LCU-1 | 493.5 | 0.084 | 2.0 | 0.169 | |
LCU-2 | 503.0 | 0.181 | 6.0 | 1.088 | 1.257 | |
176-89 | LCU-1 | 492.0 | 0.117 | 6.5 | 0.759 | 0.759 |
175-94 | LCU-2 | 511.5 | 0.095 | 5.5 | 0.520 | 0.520 |
162-115 | LCL-1 | 497.5 | 0.280 | 3.0 | 0.840 | 0.840 |
172-95 | LCU-1 | 496.5 | 0.197 | 2.0 | 0.394 | |
LCL-1 | 521.5 | 0.075 | 1.5 | 0.112 | 0.506 | |
180-92 | LCU-1 | 496.0 | 0.103 | 4.5 | 0.464 | 0.464 |
-All intercepts are located in the PAA-7 which hosts mineralization within the Goliad Formation. The Company has identified five saturated (required for ISR), mineralized sandstone horizons within the Goliad Formation lying approximately 400 to 520 feet below the surface. The water level is located approximately 120 feet below the surface. Grade Thickness is Grade % U3O8 multiplied by the thickness of the mineralization. |
The Alta Mesa CPP and Wellfield hosts a fully licensed and constructed ISR uranium plant, located on 200,000+ acres of private land in the state of
Total operating capacity at the Alta Mesa CPP is 1.5 million lbs. U3O8 (uranium) per year. The Alta Mesa CPP historically produced nearly 5 million lbs. U3O8 between 2005 and 2013, when full production was curtailed as a result of low uranium prices.
Alta Mesa CPP and Wellfield highlights:
- The Alta Mesa CPP is enCore's third fully licensed production facility, along with the Rosita CPP and Kingsville Dome CPP, all located in the business-friendly state of
Texas . There are only eleven (11) licensed and constructed uranium production facilities in all ofthe United States (US); - Advancing the Alta Mesa CPP, in conjunction with planned production in 2023 at the Rosita CPP, will cement enCore Energy's position as the early leader in In-Situ Recovery (ISR) uranium production in
the United States ; - Alta Mesa CPP's operations are located on private land, with
100% of minerals privately owned, and in a supportive jurisdiction with primary regulatory authority residing with theState of Texas ; - The Alta Mesa CPP utilizes well-known ISR technology to extract uranium in a non-invasive process using natural groundwater and oxygen, coupled with a proven ion exchange process, to recover the uranium.
Alta Mesa & Mesteña Grande Mineral | Tons | Avg. Grade (% U3O8) | Pounds |
Total Measured Mineral Resource1 | 54,000 | 0.152 | 164,000 |
Alta Mesa Indicated Mineral Resource | 1,397,000 | 0.106 | 2,959,000 |
Mesteña Grande Indicated Mineral Resource | 119,000 | 0.120 | 287,000 |
Total Measured & Indicated Resources | 1,570,000 | 0.109 | 3,410,000 |
Alta Mesa Inferred Mineral Resource | 1,263,000 | 0.126 | 3,192,000 |
Mesteña Grande Inferred Mineral Resource | 5,733,000 | 0.119 | 13,601,000 |
Total Inferred Resources | 6,996,000 | 0.120 | 16,793,000 |
1,2 Represents that portion of the in-place mineral resource that are estimated to be recoverable within existing wellfields. Wellfield recovery factors have not been applied to indicated and inferred mineral resources. As reported in the NI-43-101 Technical Report Summary for the Alta Mesa Uranium Project, |
The Company advises that it is not basing its production decisions at Alta Mesa CPP or Rosita CPP on a feasibility study of mineral reserves demonstrating economic and technical viability. The production decision is based on known past In-Situ Recovery (ISR) and processing operations at these two production facilities and surrounding lands. However, the Company understands that there is increased uncertainty, and consequently a higher risk of failure, when production is undertaken in advance of a feasibility study. The Company has determined to proceed with a production decision based on past operations at the Alta Mesa CPP and Rosita CPP, including past ISR operations in the known mineral resource areas.
John M. Seeley, Ph.D., P.G., C.P.G., enCore's Manager of Geology and Exploration, and a Qualified Person under NI 43-101, has reviewed and approved the technical disclosure in this news release on behalf of the Company.
The Company also advises that Mr. Gregory Zerzan has resigned his position with the Company. The Company thanks Mr. Zerzan for his service and wishes him well in his future endeavors.
enCore Energy Corp., America's Clean Energy Company™, is committed to providing clean, reliable, and affordable domestic nuclear energy by becoming the next
Future projects in enCore's production pipeline include the Dewey-Burdock project in
1 EU News Release - May 18, 2023
Certain information contained in this news release, including: any information relating to the Company being a leading uranium company, statements regarding future or potential production, and any other statements regarding future expectations, beliefs, goals or prospects; may constitute "forward-looking information" and "forward-looking statements" within the meaning of applicable Canadian and
View original content to download multimedia:https://www.prnewswire.com/news-releases/encore-energy-provides-update-on-the-south-texas-alta-mesa-isr-uranium-central-processing-plant-and-wellfield-301993095.html
SOURCE enCore Energy Corp.
FAQ
What is enCore Energy Corp. updating about?
What are the driving forces for the uranium spot market?