STOCK TITAN

Ero Copper Announces Initial NI 43-101 Mineral Resource Estimate for the Furnas Copper-Gold Project

Rhea-AI Impact
(Neutral)
Rhea-AI Sentiment
(Very Positive)
Tags

Ero Copper Corp. has announced an initial NI 43-101 compliant mineral resource estimate for the Furnas Copper-Gold Project in Brazil's Carajás Mineral Province. At a 1.00% copper equivalent cut-off grade, the estimate includes:

- Indicated Mineral Resource: 35.2 million tonnes grading 1.04% copper and 0.69 gpt gold (1.36% CuEq), containing 364,700 tonnes of copper and 775,300 ounces of gold
- Inferred Mineral Resource: 61.3 million tonnes grading 1.06% copper and 0.63 gpt gold (1.36% CuEq), containing 647,400 tonnes of copper and 1,235,600 ounces of gold

The estimate is based on over 90,000 meters of historic drilling. Ero Copper plans a Phase 1 drill program focusing on improving definition of high-grade zones and extending known mineralization. The company has an earn-in agreement with Vale Base Metals to acquire a 60% interest in the project.

Ero Copper Corp. ha annunciato una stima iniziale delle risorse minerarie conforme al NI 43-101 per il Furnas Copper-Gold Project nella provincia mineraria dei Carajás, in Brasile. Con un taglio del grado equivalente di rame dell'1,00%, la stima include:

- Risorse Minerarie Indicate: 35,2 milioni di tonnellate con un grado dell'1,04% di rame e 0,69 gpt di oro (1,36% CuEq), contenenti 364.700 tonnellate di rame e 775.300 once d'oro
- Risorse Minerarie Inferite: 61,3 milioni di tonnellate con un grado dell'1,06% di rame e 0,63 gpt di oro (1,36% CuEq), contenenti 647.400 tonnellate di rame e 1.235.600 once d'oro

La stima si basa su oltre 90.000 metri di perforazioni storiche. Ero Copper prevede un programma di perforazione di Fase 1 concentrato sul miglioramento della definizione delle zone ad alto grado e sull'estensione della mineralizzazione conosciuta. L'azienda ha un accordo di earn-in con Vale Base Metals per acquisire una partecipazione del 60% nel progetto.

Ero Copper Corp. ha anunciado una estimación inicial de recursos minerales conforme a NI 43-101 para el Furnas Copper-Gold Project en la provincia mineral de Carajás, Brasil. Con un corte de grado equivalente de cobre del 1.00%, la estimación incluye:

- Recursos Minerales Indicados: 35.2 millones de toneladas con un grado del 1.04% de cobre y 0.69 gpt de oro (1.36% CuEq), que contiene 364,700 toneladas de cobre y 775,300 onzas de oro
- Recursos Minerales Inferidos: 61.3 millones de toneladas con un grado del 1.06% de cobre y 0.63 gpt de oro (1.36% CuEq), que contiene 647,400 toneladas de cobre y 1,235,600 onzas de oro

La estimación se basa en más de 90,000 metros de perforaciones históricas. Ero Copper planea un programa de perforación Fase 1 centrado en mejorar la definición de zonas de alta ley y extender la mineralización conocida. La empresa tiene un acuerdo de earn-in con Vale Base Metals para adquirir un 60% de interés en el proyecto.

Ero Copper Corp.는 브라질 카라자스 광물 지역의 Furnas Copper-Gold Project에 대해 NI 43-101에 준수하는 초기 광물 자원 추정치를 발표했습니다. 구리 동등 기준선이 1.00%일 때, 추정치는 다음과 같습니다:

- 지시된 광물 자원: 구리 1.04% 및 금 0.69 gpt(1.36% CuEq) 등급의 3,520만 톤으로, 36만 4,700톤의 구리와 77만 5,300온스를 포함합니다.
- 추정 광물 자원: 구리 1.06% 및 금 0.63 gpt(1.36% CuEq) 등급의 6,130만 톤으로, 64만 7,400톤의 구리와 123만 5,600온스를 포함합니다.

이 추정치는 90,000미터 이상의 역사적 드릴링을 기반으로 하고 있습니다. Ero Copper는 고등급 구역의 정의 개선과 기존 광물화 지대의 확장을 중심으로 한 1단계 드릴 프로그램을 계획하고 있습니다. 이 회사는 Vale Base Metals와 60%의 프로젝트 지분을 인수하기 위한 수익 계약을 체결했습니다.

Ero Copper Corp. a annoncé une estimation initiale des ressources minérales conforme au NI 43-101 pour le Furnas Copper-Gold Project dans la province minière de Carajás, au Brésil. Avec un seuil de cuivre équivalent de 1,00%, l'estimation comprend :

- Ressource minérale indiquée : 35,2 millions de tonnes avec une teneur de 1,04% de cuivre et 0,69 gpt d'or (1,36% CuEq), contenant 364 700 tonnes de cuivre et 775 300 onces d'or
- Ressource minérale inférée : 61,3 millions de tonnes avec une teneur de 1,06% de cuivre et 0,63 gpt d'or (1,36% CuEq), contenant 647 400 tonnes de cuivre et 1 235 600 onces d'or

L'estimation est basée sur plus de 90 000 mètres de forages historiques. Ero Copper prévoit un programme de forage de phase 1 axé sur l'amélioration de la définition des zones à haute teneur et l'extension de la minéralisation connue. La société a un accord d'earn-in avec Vale Base Metals pour acquérir 60% de participation dans le projet.

Ero Copper Corp. hat eine erste mineralische Ressourcenschätzung veröffentlicht, die den NI 43-101-Vorgaben für das Furnas Copper-Gold Project in der mineralischen Provinz Carajás, Brasilien, entspricht. Bei einem Kupferäquivalent-Cut-off-Gehalt von 1,00% umfasst die Schätzung:

- angezeigte mineralische Ressource: 35,2 Millionen Tonnen mit einem Gehalt von 1,04% Kupfer und 0,69 gpt Gold (1,36% CuEq), das 364.700 Tonnen Kupfer und 775.300 Unzen Gold enthält.
- geschätzte mineralische Ressource: 61,3 Millionen Tonnen mit einem Gehalt von 1,06% Kupfer und 0,63 gpt Gold (1,36% CuEq), das 647.400 Tonnen Kupfer und 1.235.600 Unzen Gold enthält.

Die Schätzung basiert auf über 90.000 Metern historischer Bohrungen. Ero Copper plant ein Bohrprogramm der Phase 1, das sich auf die Verbesserung der Definition von hochgradigen Zonen und die Erweiterung der bekannten Mineralisierung konzentriert. Das Unternehmen hat eine Earn-In-Vereinbarung mit Vale Base Metals, um 60% an dem Projekt zu erwerben.

Positive
  • Initial mineral resource estimate shows significant potential for the Furnas Copper-Gold Project
  • Indicated Mineral Resource of 35.2 million tonnes with 1.36% CuEq grade
  • Inferred Mineral Resource of 61.3 million tonnes with 1.36% CuEq grade
  • Phase 1 drill program planned to improve definition and extend known mineralization
  • Project located near extensive regional infrastructure
  • Earn-in agreement with Vale Base Metals to acquire 60% interest in the project
Negative
  • None.

Insights

The initial NI 43-101 mineral resource estimate for Ero Copper's Furnas Project reveals significant potential. With 35.2 million tonnes of indicated resources grading 1.04% copper and 0.69% gold, plus 61.3 million tonnes of inferred resources at similar grades, this represents a substantial copper-gold deposit.

Key points:

  • Total contained metal estimate: over 1 million tonnes of copper and 2 million ounces of gold
  • High-grade zones identified for targeted drilling
  • Potential for a large-scale underground mining operation
  • Strategic location in the Carajás region with nearby infrastructure

The 60/40 joint venture with Vale Base Metals adds credibility and potential synergies. Ero's experience in Brazilian underground mining and recent success with the Tucumã project positions them well to advance Furnas. The planned 28,000-meter drill program aims to upgrade and expand the resource, potentially enhancing project economics.

This discovery could significantly boost Ero's growth pipeline and long-term production outlook, though development timelines and capital requirements remain uncertain at this early stage.

This mineral resource announcement represents a potentially significant value-add for Ero Copper, though it's important to contextualize the financial implications:

  • Current market cap: $2.34 billion
  • Estimated in-situ value of Furnas resource (100% basis):
    • Copper: ~$9.3 billion ($4.15/lb price)
    • Gold: ~$3.8 billion ($1,900/oz price)
  • Ero's 60% stake could represent $7.9 billion of in-situ value

However, this simplistic valuation doesn't account for development costs, recovery rates, or the time value of money. The true NPV will be much lower. Key financial considerations:

  • Capital intensity for new copper mines often exceeds $20,000 per annual tonne of production
  • Ero must fund 100% of exploration/development costs to earn its 60% stake
  • The "free carry" provision for Vale reduces Ero's economic interest

While Furnas adds significant optionality to Ero's portfolio, near-term cash flows and balance sheet impact will be minimal as the project advances through studies and permitting. Investors should focus on drill results and milestone achievements rather than expecting immediate financial returns.

VANCOUVER, British Columbia, Oct. 02, 2024 (GLOBE NEWSWIRE) -- Ero Copper Corp. (TSX: ERO, NYSE: ERO) ("Ero" or the “Company”) is pleased to announce an initial National Instrument 43-101 ("NI 43-101") compliant mineral resource estimate for the Furnas Copper-Gold Project ("Furnas" or the "Project"), located in the Carajás Mineral Province ("Carajás") in Pará State, Brazil.

The initial mineral resource estimate highlights significant potential for the Project. At a 1.00% copper equivalent ("CuEq") cut-off grade, the mineral resource estimate, effective June 30, 2024, totals:

  • Indicated Mineral Resource: 35.2 million tonnes grading 1.04% copper and 0.69 grams per tonne ("gpt") gold (1.36% CuEq1), containing an estimated 364,700 tonnes of copper and 775,300 ounces of gold
  • Inferred Mineral Resource: 61.3 million tonnes grading 1.06% copper and 0.63 gpt gold (1.36% CuEq1), containing an estimated 647,400 tonnes of copper and 1,235,600 ounces of gold

This estimate is supported by more than 90,000 meters of historic drilling on the Project, conducted by Vale S.A. and Anglo American plc, as well as a resampling and database validation program undertaken by the Company.

"We are extremely pleased with this initial mineral resource estimate for Furnas. It provides a solid foundation upon which we can focus, over the coming months, on unlocking further potential," said David Strang, Chief Executive Officer. "Our Phase 1 drill program will target two key objectives: improving the definition of high-grade zones through infill drilling and extending known mineralization within these zones beyond the historically drilled depth of approximately 300 vertical meters from surface.

"Furnas presents a tremendous opportunity to define a major copper-gold mineral resource capable of supporting a large-scale underground mine. Our experience in underground mining in Brazil, coupled with the successful construction of our new Tucumã mine and processing plant in the Carajás, positions us well to advance this Project.

"Together with our partners at Vale Base Metals, we are committed to progressing Furnas in a manner that delivers sustainable benefits for all stakeholders and reinforces Brazil's position as a global leader in the responsible, low-carbon production of critical minerals."

1. CuEq grade calculated as Cu grade + (Au grade x 0.03215 x ($1,900 gold price x 61.50% gold metallurgical recovery / (0.01 x $9,259/tonne copper price x 85.00% copper metallurgical recovery)).

MINERAL RESOURCE ESTIMATE AND CUT-OFF GRADE SENSITIVITY

Cut-Off Grade     Grade Contained Metal
CuEq1   Tonnes Cu Au CuEq1 Cu Au CuEq
(%) Category (Mt) (%) (gpt) (%) (kt) (koz) (kt)
0.60
 Indicated 66.4 0.84 0.55 1.10 555.3 1,179.9 730.5
 Inferred 114.8 0.85 0.51 1.10 978.9 1,877.3 1,257.6
0.80
 Indicated 51.2 0.93 0.60 1.22 477.9 984.5 624.1
 Inferred 88.0 0.96 0.55 1.22 840.7 1,558.1 1,072.0
1.00
 Indicated 35.2 1.04 0.69 1.36 364.7 775.3 479.8
 Inferred 61.3 1.06 0.63 1.36 647.4 1,235.6 830.8

Note: The Canadian Institute of Mining, Metallurgy and Petroleum ("CIM") Definition Standards (2014) were used for reporting Mineral Resources, which are effective as at June 30, 2024 and presented on a 100% ownership basis. All figures have been rounded to reflect the relative accuracy of the estimates. Summed amounts may not add due to rounding. Mineral resources that are not mineral reserves do not have a demonstrated economic viability. See "Notes on Mineral Resources" below for additional technical and scientific information.
1. CuEq grade calculated as Cu grade + (Au grade x 0.03215 x ($1,900 gold price x 61.50% gold metallurgical recovery / (0.01 x $9,259/tonne copper price x 85.00% copper metallurgical recovery)).

In September 2024, the Company received drilling permits from the Pará State environmental agency, allowing for the commencement of the Phase 1 drill program in October 2024. This minimum 28,000-meter program will focus on two identified high-grade zones – the NW and SE Zones – within the broader deposit. The program is designed to support a preliminary economic assessment on the Project. The drill plan comprises:

  • Infill drilling to upgrade inferred mineral resources and increase continuity of the high- grade zones
  • Extensional drilling to depth, where limited prior drilling suggests increasing grade and thickness

FURNAS COPPER-GOLD PROJECT DETAILS AND EARN-IN AGREEMENT

Furnas is an iron oxide copper-gold deposit located approximately 50 kilometers southeast of Vale Base Metal's ("VBM") Salobo operations and approximately 190 kilometers northeast of Ero's Tucumã Operations. Covering an area of approximately 2,400 hectares, the Project sits within fifteen kilometers of extensive regional infrastructure, including paved roads, an industrial-scale cement plant, a power substation and Vale S.A.'s railroad loadout facility.

In July 2024, the Company signed a definitive earn-in agreement ("Agreement") with Salobo Metais S.A, a subsidiary of VBM, to earn a 60% interest in the Project upon completion of several exploration, engineering and development milestones over a five-year period. In exchange for its 60% interest, Ero will solely fund a phased work program during the earn-in period and grant VBM up to an 11.0% "free carry" on future Project construction capital expenditures. For additional details on the key terms and execution of the Agreement, please refer to the Company's press releases dated October 30, 2023 and July 22, 2024.

NOTES ON MINERAL RESOURCES

CIM Definition Standards (2014) were used for reporting mineral resources, which are effective as at June 30, 2024 and presented on a 100% ownership basis. All figures have been rounded to the relative accuracy of the estimates. Summed amounts may not add due to rounding. Mineral resources that are not mineral reserves do not have a demonstrated economic viability.

Mineral resource estimates are prepared by or under the supervision of and verified by Mr. Cid Gonçalves Monteiro Filho, SME RM (04317974), MAIG (No. 8444), FAusIMM (No. 329148). Mr. Monteiro is Resource Manager of the Company and is a “qualified person” within the meanings of NI 43-101.

Mineral resources have been estimated using a copper price of US$9,259/tonne, a gold price of US$1,900/oz, a USD:BRL foreign exchange rate of 5.10, and copper and gold metallurgical recovery rates of 85.00% and 61.50%, respectively. The estimation was constrained using Datamine's Mineable Shape Optimizer ("MSO") at a 0.55% break-even copper cut-off grade. Mineral resources were estimated using ordinary kriging within a 25-meter by 25-meter by 4- meter block size (X, Y, Z), with a minimum sub-block size of 6.25 meters by 6.25 meters by
2.0 meters.

QUALIFIED PERSONS AND THE NI 43-101 TECHNICAL REPORT

Mr. Cid Gonçalves Monteiro Filho, SME RM (04317974), MAIG (No. 8444), FAusIMM (No. 329148) has reviewed, verified and approved the scientific and technical information contained in this press release, including the sampling, analytical and test data underlying the information contained in this press release. Mr. Monteiro is Resource Manager of the Company and is a “qualified person” within the meanings of NI 43-101.

The Company will file the associated NI 43-101 compliant report on SEDAR+ (www.sedarplus.ca/landingpage/) and EDGAR (www.sec.gov), and publish this report on the Company's website (www.erocopper.com), within 45 days of this press release.

QUALITY ASSURANCE & QUALITY CONTROL

Four diamond exploration drilling campaigns were previously carried out on Furnas, with control sample protocols applied to each campaign. Historical QA/QC data was evaluated, including duplicates, blanks and standard samples from the most recent drilling campaign.

In all drilling campaigns, a quarter of the recovered core sample was collected. In the first three exploration campaigns, one-meter sampling intervals were predominately used. In the fourth exploration campaign one-meter sampling intervals were predominately used in the mineralized zone and two-meter sampling intervals were used in the transition zone and in waste rock.

Physical preparation of the quarter-core samples was performed in the following laboratories: Vale/Carajás, Intertek-Parauapebas-PA, Intertek-Nova Lima-MG, SGS GEOSOL, or Lakefield-Geosol. Chemical analysis was performed by ACME, Lakefield-Geosol in Belo Horizonte/MG, and SGS Geosol Laboratories in Vespasiano/MG. The selection of analytical methods and the number of elements analyzed varied across exploration campaigns.

To verify the accuracy of older sampling campaigns, a post-mortem QA/QC program was performed on copper and gold for select assay intervals. The post-mortem program undertaken by the Company demonstrates good performance, particularly for copper and gold, allowing for the inclusion of historical exploration campaign data for the purposes of this press release.

The Company reprocessed all historical QA/QC data from the Project, according to the Company's internal guidelines, and achieved exceptional results aligned with industry standards. Error rates for pulp and coarse duplicates remained significantly below the conventional limit of 10%, demonstrating the effectiveness of historical data preparation and analytical procedures. Global biases across all drilling phases and laboratories stayed well within acceptable parameters, confirming the analytical accuracy of the primary laboratories associated with the historical database. Additionally, the absence of significant contamination in all laboratories further validates the reliability and integrity of the reprocessed data.

ABOUT ERO COPPER CORP

Ero is a high-margin, high-growth, low carbon-intensity copper producer with operations in Brazil and corporate headquarters in Vancouver, B.C. The Company's primary asset is a 99.6% interest in the Brazilian copper mining company, Mineração Caraíba S.A. ("MCSA"), 100% owner of the Company's Caraíba Operations (formerly known as the MCSA Mining Complex), which are located in the Curaçá Valley, Bahia State, Brazil and include the Pilar and Vermelhos underground mines and the Surubim open pit mine, and the Tucumã Operation (formerly known as Boa Esperança), an open pit copper mine located in Pará, Brazil. The Company also owns 97.6% of NX Gold S.A. ("NX Gold") which owns the Xavantina Operations (formerly known as the NX Gold Mine), comprised of an operating gold and silver mine located in Mato Grosso, Brazil. Additional information on the Company and its operations, including technical reports on the Caraíba Operations, Xavantina Operations and Tucumã Operation, can be found on SEDAR+ (www.sedarplus.ca/landingpage/) and on EDGAR (www.sec.gov). The Company’s shares are publicly traded on the Toronto Stock Exchange and the New York Stock Exchange under the symbol “ERO”.

FOR MORE INFORMATION, PLEASE CONTACT

Courtney Lynn, SVP, Corporate Development, Investor Relations & Sustainability
(604) 335-7504
info@erocopper.com

CAUTION REGARDING FORWARD LOOKING INFORMATION AND STATEMENTS

This press release contains “forward-looking statements” within the meaning of the United States Private Securities Litigation Reform Act of 1995 and “forward-looking information” within the meaning of applicable Canadian securities legislation (collectively, “forward-looking statements”). Forward-looking statements include statements that use forward-looking terminology such as “may”, “could”, “would”, “will”, “should”, “intend”, “target”, “plan”, “expect”, “budget”, “estimate”, “forecast”, “schedule”, “anticipate”, “believe”, “continue”, “potential”, “view” or the negative or grammatical variation thereof or other variations thereof or comparable terminology. Forward-looking statements may include, but are not limited to, statements with respect to Ero's ability, in partnership with VBM, to create value at and/or maximize the value of the Project; Ero's ability to successfully design an economic high-grade underground mine or other development and operating scenario for Furnas; Ero's ability to commence and complete the required 28,000 meters of drilling during the 18-month Phase 1 work program; and any other statement that may predict, forecast, indicate or imply future plans, intentions, levels of activity, results, performance or achievements.

Forward-looking statements are not a guarantee of future performance. There can be no assurance that forward-looking statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Forward-looking statements involve statements about the future and are inherently uncertain, and the Company’s actual results, achievements or other future events or conditions may differ materially from those reflected in the forward-looking statements due to a variety of risks, uncertainties and other factors, including, without limitation, those referred to herein and in the Company's most recent Annual Information Form under the heading “Risk Factors”.

The Company’s forward-looking statements are based on the assumptions, beliefs, expectations and opinions of management on the date the statements are made, many of which may be difficult to predict and beyond the Company’s control. In connection with the forward-looking statements contained in this press release and in the AIF, the Company has made certain assumptions about, among other things: continued effectiveness of the measures taken by the Company to mitigate the possible impact of COVID-19 on its workforce and operations; favourable equity and debt capital markets; the ability to raise any necessary additional capital on reasonable terms to advance the production, development and exploration of the Company’s properties and assets; future prices of copper, gold and other metal prices; the timing and results of exploration and drilling programs; the accuracy of any mineral reserve and mineral resource estimates; the geology of the Caraíba Operations, the Xavantina Operations and the Tucumã Project being as described in the respective technical report for each property; production costs; the accuracy of budgeted exploration, development and construction costs and expenditures; the price of other commodities such as fuel; future currency exchange rates and interest rates; operating conditions being favourable such that the Company is able to operate in a safe, efficient and effective manner; work force continuing to remain healthy in the face of prevailing epidemics, pandemics or other health risks (including COVID-19), political and regulatory stability; the receipt of governmental, regulatory and third party approvals, licenses and permits on favourable terms; obtaining required renewals for existing approvals, licenses and permits on favourable terms; requirements under applicable laws; sustained labour stability; stability in financial and capital goods markets; availability of equipment; positive relations with local groups and the Company’s ability to meet its obligations under its agreements with such groups; and satisfying the terms and conditions of the Company’s current loan arrangements. Although the Company believes that the assumptions inherent in forward-looking statements are reasonable as of the date of this press release, these assumptions are subject to significant business, social, economic, political, regulatory, competitive and other risks and uncertainties, contingencies and other factors that could cause actual actions, events, conditions, results, performance or achievements to be materially different from those projected in the forward-looking statements. The Company cautions that the foregoing list of assumptions is not exhaustive. Other events or circumstances could cause actual results to differ materially from those estimated or projected and expressed in, or implied by, the forward-looking statements contained in this press release. There can be no assurance that forward-looking statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking statements.

Forward-looking statements contained herein are made as of the date of this press release and the Company disclaims any obligation to update or revise any forward-looking statement, whether as a result of new information, future events or results or otherwise, except as and to the extent required by applicable securities laws.

CAUTIONARY NOTES REGARDING MINERAL RESOURCE AND MINERAL RESERVE ESTIMATES

Unless otherwise indicated, all reserve and resource estimates included in this press release and the documents incorporated by reference herein have been prepared in accordance with National Instrument 43-101, Standards of Disclosure for Mineral Projects (“NI 43-101") and the Canadian Institute of Mining, Metallurgy and Petroleum (the “CIM”) — CIM Definition Standards on Mineral Resources and Mineral Reserves, adopted by the CIM Council, as amended (the “CIM Standards”). NI 43-101 is a rule developed by the Canadian Securities Administrators that establishes standards for all public disclosure an issuer makes of scientific and technical information concerning mineral projects. Canadian standards, including NI 43-101, differ significantly from the requirements of the United States Securities and Exchange Commission (the “SEC”), and reserve and resource information included herein may not be comparable to similar information disclosed by U.S. companies. In particular, and without limiting the generality of the foregoing, this press release and the documents incorporated by reference herein use the terms “measured resources,” “indicated resources” and “inferred resources” as defined in accordance with NI 43-101 and the CIM Standards.

Further to recent amendments, mineral property disclosure requirements in the United States (the “U.S. Rules”) are governed by subpart 1300 of Regulation S-K of the U.S. Securities Act of 1933, as amended (the “U.S. Securities Act”) which differ from the CIM Standards. As a foreign private issuer that is eligible to file reports with the SEC pursuant to the multi-jurisdictional disclosure system (the “MJDS”), Ero is not required to provide disclosure on its mineral properties under the U.S. Rules and will continue to provide disclosure under NI 43-101 and the CIM Standards. If Ero ceases to be a foreign private issuer or loses its eligibility to file its annual report on Form 40-F pursuant to the MJDS, then Ero will be subject to the U.S. Rules, which differ from the requirements of NI 43-101 and the CIM Standards.

Pursuant to the new U.S. Rules, the SEC recognizes estimates of “measured mineral resources”, “indicated mineral resources” and “inferred mineral resources.” In addition, the definitions of “proven mineral reserves” and “probable mineral reserves” under the U.S. Rules are now “substantially similar” to the corresponding standards under NI 43-101. Mineralization described using these terms has a greater amount of uncertainty as to its existence and feasibility than mineralization that has been characterized as reserves. Accordingly, U.S. investors are cautioned not to assume that any measured mineral resources, indicated mineral resources, or inferred mineral resources that Ero reports are or will be economically or legally mineable. Further, “inferred mineral resources” have a greater amount of uncertainty as to their existence and as to whether they can be mined legally or economically. Under Canadian securities laws, estimates of “inferred mineral resources” may not form the basis of feasibility or pre-feasibility studies, except in rare cases. While the above terms under the U.S. Rules are “substantially similar” to the standards under NI 43-101 and CIM Standards, there are differences in the definitions under the U.S. Rules and CIM Standards. Accordingly, there is no assurance any mineral reserves or mineral resources that Ero may report as “proven mineral reserves”, “probable mineral reserves”, “measured mineral resources”, “indicated mineral resources” and “inferred mineral resources” under NI 43-101 would be the same had Ero prepared the reserve or resource estimates under the standards adopted under the U.S. Rules.


FAQ

What is the initial mineral resource estimate for Ero Copper's Furnas Project (ERO)?

The initial mineral resource estimate for Ero Copper's Furnas Project (ERO) includes an Indicated Mineral Resource of 35.2 million tonnes grading 1.36% CuEq and an Inferred Mineral Resource of 61.3 million tonnes grading 1.36% CuEq at a 1.00% copper equivalent cut-off grade.

When will Ero Copper (ERO) begin its Phase 1 drill program at Furnas?

Ero Copper (ERO) received drilling permits in September 2024 and plans to commence the Phase 1 drill program at Furnas in October 2024.

What is the focus of Ero Copper's (ERO) Phase 1 drill program at Furnas?

Ero Copper's (ERO) Phase 1 drill program at Furnas will focus on two objectives: improving the definition of high-grade zones through infill drilling and extending known mineralization within these zones beyond the historically drilled depth of approximately 300 vertical meters from surface.

What is the earn-in agreement between Ero Copper (ERO) and Vale Base Metals for the Furnas Project?

Ero Copper (ERO) signed an earn-in agreement with Vale Base Metals in July 2024 to earn a 60% interest in the Furnas Project upon completion of several exploration, engineering, and development milestones over a five-year period.

Ero Copper Corp.

NYSE:ERO

ERO Rankings

ERO Latest News

ERO Stock Data

1.39B
92.67M
10.36%
76.94%
2.22%
Copper
Basic Materials
Link
United States of America
Vancouver