Electra Reports Q1 2023 Results and Provides Update on Cobalt Refinery Project and Black Mass Recycling Trial
“Our performance in the first quarter was marked by a number of significant milestones relating to our lithium-ion battery material recycling trial,” said Trent Mell, Electra’s CEO. “Most notably, we completed the first plant-scale recycling of black mass material in
“We expect to sustain this momentum with the first delivery of recycled products to customers in the coming weeks and the completion of a scoping study assessing the economic potential of black mass processing at our refinery complex north of Toronto,” Mr. Mell concluded.
ELECTRA Q1 2023 HIGHLIGHTS AND DEVELOPMENTS
-
Net loss for the period was
or$21.8 million per share. Included in the net loss was the impact of a debt offering transaction completed in the period involving a non-cash settlement of 2026 Notes in exchange for 2028 Notes at a loss of$0.61 . Results for Q1 2023 compare to net income of$19.9 million or$2.3 million per share for Q1 2022, which was driven by a gain of$0.08 on the fair value of the embedded derivative liability portion of Electra’s convertible debt.$4 million -
Held cash and marketable securities of
as at March 31, 2023, up from$12.9 million as at December 31, 2022. Electra’s cash balance at the end of Q1 2023 does not include the remaining$8.4 million of government investments expected to be received.$5.1 million -
Successfully completed the first plant-scale recycling of black mass material in
North America and confirmed the recovery of critical metals, including lithium, nickel, cobalt, copper, manganese, and graphite, needed for the EV battery supply chain using Electra’s proprietary hydrometallurgical process. To date, Electra has produced high quality nickel-cobalt mixed hydroxide, graphite, and lithium carbonate products in its black mass recycling trial at its refinery complex. -
Disposed of non-core exploration assets in the Canadian Cobalt Camp to Kuya Silver Corporation for 2.7 million shares of Kuya valued at
. Electra retained a two percent royalty on net smelter returns from all commercial production derived from the assets.$1 million -
Closed a private placement offering for the issuance of
US principal amount of$51 million 8.99% senior secured convertible notes (“Note Offering”) due February 2028. As part of the Note Offering, Electra also announced that it purchased and cancelled all of the previously outstanding 2026 Notes at par value, plus accrued and unpaid interest. The gross proceeds of the Note Offering ofUS will be used for capital expenditures associated with the expansion and recommissioning of the Company’s cobalt refinery, including buildings, equipment, infrastructure, and other direct costs, as well as engineering and project management costs.$15 million - Issued its inaugural Sustainability Report and committed to net-zero greenhouse emissions by 2050.
-
Released an updated mineral resources estimate (“MRE”) for the Iron Creek Cobalt-Copper project located in
Idaho .
Highlights Subsequent to Quarter End
-
Signed a memorandum of understanding with the Three Fires Group to a form a joint venture focused on the recycling of lithium-ion battery waste in
Ontario underpinned by Electra’s proprietary black mass processing capabilities that recover high value elements, including lithium, nickel, cobalt, and graphite. - Progressed with the Company’s black mass recycling trial, which continues to be marked by strong recovery rates and the production of high-quality products.
Refinery Project Update
As at March 31, 2023 Electra made the following key developments in its refinery project:
- Completed commissioning of the analytical lab, feed material handling system, including the ball mill and mixing station, filter presses, and reagent handling systems.
- Completed the erection of the solvent extraction building.
- Completed the construction of the cobalt sulfate loadout facility.
On February 14, 2023 Electra announced that due in part to the receipt of damaged equipment critical to the completion of the refinery project and ongoing supply chain disruptions causing ongoing delays in the delivery of equipment, including components to process control systems, the Company withdrew its previous guidance relating to the refinery project’s estimated capital spend and construction timelines. Subsequent inspection of the damaged equipment has determined that the falling film evaporator vessel is suitable for installation. The damaged equipment will require onsite repairs before it can be commissioned.
Also on February 14, 2023 Electra announced the launch of a re-baseline engineering report to identify the refinery’s updated project scope, scheduling, and capital expenditures. This updated re-baseline engineering work has been undertaken by the refinery project’s engineering, procurement, and construction management (EPCM) contractor. Management anticipates that the capital costs will be higher due to inflation, construction delays, scope expansion, and the completion of detailed engineering.
In particular, given inflationary price pressures over the past year that have negatively impacted all aspects of the refinery project, including contractor labour rates and costs for concrete, steel, piping, and freight, Electra expects that the re-baseline engineering report will conclude that capital costs for completing the refinery project will be higher than the
Electra expects to provide an update on its refinery project in the coming days pending completion of the re-baseline engineering report.
Black Mass Trial Update
Late in 2022, Electra launched a black mass trial at its refinery complex north of
Electra has achieved a number of encouraging results since the trial began:
-
On February 14, 2023, Electra confirmed that it had successfully completed the first plant-scale recycling of black mass material in
North America and recovered critical metals needed for the electric vehicle battery supply chain using its proprietary hydrometallurgical process. - On March 13, 2023, Electra announced that it recovered lithium, a critical mineral needed for the electric vehicle EV battery supply chain. The recovery and subsequent production of a high-quality lithium carbonate product in a plant-scale setting validate Electra’s proprietary hydrometallurgical process.
- Also, in March 2023 Electra produced a mixed hydroxide precipitate (MHP) at contained metal grades for nickel and cobalt above quoted market specifications.
- Recoveries within the MHP circuit, which produces the highest value product in the black mass recycling process, have been equivalent to and at times superior to bench scale results achieved previously.
All of the Company’s recovered material will be sold to third-party companies for additional processing and re-use in a number of applications. A first shipment of MHP product is expected to be delivered to downstream clients for evaluation purposes in early Q2 2023.
Pending completion of the black mass trial and evaluation of project economics expected in Q2, success could pave the way towards commercialization. Using the existing refinery footprint, infrastructure and plant equipment, Electra could quickly expand throughput to 2,500 tonnes per year of black mass under a continuous operation scenario. A desktop study is underway, and results will be shared once available. A larger facility of 5,000 tonne or more per annum of black mass is another option Electra may consider with a commercial funding partner.
For complete details of the consolidated financial statements and the associated management’s discussion and analysis, please refer to the Company’s filing on SEDAR (www.sedar.com) or the Company’s website (www.ElectraBMC.com).
Electra will host a conference call on May 11, 2023 at 8:00 am ET to review its first quarter performance and discuss near-term outlook.
Dial-in and Webcast Details:
- North American dial-in number: 1-800-319-4610
- International dial-in number: 1-604-638-5340
- Webcast and slide presentation: https://ElectraBMC.com/category/events/
About Electra Battery Materials
Electra is a processor of low-carbon, ethically-sourced battery materials. Currently commissioning North America’s only cobalt sulfate refinery, Electra is executing a multipronged strategy focused on onshoring the electric vehicle supply chain. Keys to its strategy are integrating black mass recycling and nickel sulfate production at Electra’s refinery located north of
Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.
Cautionary Note Regarding Forward-Looking Statements
This news release may contain forward-looking statements and forward-looking information (together, “forward-looking statements”) within the meaning of applicable securities laws and the United States Private Securities Litigation Reform Act of 1995. All statements, other than statements of historical facts, are forward-looking statements. Generally, forward-looking statements can be identified by the use of terminology such as “plans”, “expects”, “estimates”, “intends”, “anticipates”, “believes” or variations of such words, or statements that certain actions, events or results “may”, “could”, “would”, “might”, “occur” or “be achieved”. Such forward-looking statements include, without limitation, statements regarding the potential for additional funding from the Federal government of
View source version on businesswire.com: https://www.businesswire.com/news/home/20230510005990/en/
Joe Racanelli
Vice President, Investor Relations
info@ElectraBMC.com
1.416.900.3891
Source: Electra Battery Materials Corporation