E3 Lithium Discovers Lithium Concentrations as high as 87 mg/L in the Nisku Aquifer
- Discovery of higher lithium concentrations in the Nisku Aquifer is a significant development for E3 Lithium
- Potential to produce additional commercial quantities of lithium in the future
- Strict chain of custody and adherence to CIM guidelines for sample acquisition and analysis
- None.
Highlights:
- E3 Lithium sampled the Nisku Aquifer in six locations in its Clearwater Project Area, resulting in lithium concentrations as high as 87 mg/L
-
The Nisku Aquifer is above the Leduc Aquifer and is laterally continuous throughout E3 Lithium’s permit area in south-central
Alberta ; E3 Lithium owns the mineral rights to both aquifers - The Nisku Aquifer has similar geologic properties to the Leduc Aquifer including historic high flow rates, which may support the production of additional commercial quantities of lithium
The
E3 Lithium sampled brine in the
Table 1: Lithium Concentrations Sampled from Six Wells in the
Well number |
Lithium grade |
6-11 |
81 mg/L |
16-35 |
87 mg/L |
6-25 |
87 mg/L |
9-23 |
65 mg/L* |
13-24 |
83 mg/L |
16-26 |
84 mg/L |
*This sample produced lower lithium concentrations with brine chemistry that differed from the other wells and historic water analysis data from the same well, which may indicate contamination. E3 Lithium is investigating potential causes further and may resample.
“Finding higher concentrations of lithium in the
The previously reported lithium concentrations ranging from 37 mg/L to 75 mg/L were from different well locations and were collected from oil and gas wells between 2017 and 2020.
The
About the
The
The
Mineral Resource Sample Data
The disclosure in this news release of scientific and technical information has been prepared by or under the supervision of Joanie Kennedy, P. Geo, Manager, Geoscience of E3 Lithium Ltd., and professional member of the Association of Professional Engineers and Geoscientists of
ON BEHALF OF THE BOARD OF DIRECTORS
Chris Doornbos, President & CEO
E3 Lithium Ltd.
About E3 Lithium
E3 Lithium is a development company with a total of 16.0 million tonnes of lithium carbonate equivalent (LCE) Measured and Indicated and 0.9 million tonnes LCE Inferred mineral resources1 in
1: The Preliminary Economic Assessment (PEA) for the Clearwater Lithium Project NI 43-101 technical report is amended Sept 17, 2021. Gordon MacMillan, P.Geol, QP, Fluid Domains Inc. and Grahame Binks, MAusIMM, QP (Metallurgy), formerly of Sedgman Canada Limited (Report Date: June 15, 2018, Effective Date: June 4, 2018 Amended Date: September 17, 2021). The mineral resource NI 43-101 Technical Report for the North Rocky Property, effective October 27, 2017, identified 0.9Mt LCE (inferred). The mineral resource NI 43-101 Technical Report for the Bashaw District Project, effective March 21, 2023, identified 16.0Mt LCE (measured & indicated). All reports are available on the E3 Lithium’s website (e3lithium.ca/technical-reports) and SEDAR+ (www.sedarplus.ca).
Forward-Looking and Cautionary Statements
This news release includes certain forward-looking statements as well as management’s objectives, strategies, beliefs and intentions. Forward looking statements are frequently identified by such words as “may”, “will”, “plan”, “expect”, “anticipate”, “estimate”, “intend” and similar words referring to future events and results. Forward-looking statements are based on the current opinions and expectations of management. All forward-looking information is inherently uncertain and subject to a variety of assumptions, risks and uncertainties, including the speculative nature of mineral exploration and development, fluctuating commodity prices, the effectiveness and feasibility of emerging lithium extraction technologies which have not yet been tested or proven on a commercial scale or on the Company’s brine, competitive risks and the availability of financing, as described in more detail in our recent securities filings available at www.sedarplus.ca. Actual events or results may differ materially from those projected in the forward-looking statements and we caution against placing undue reliance thereon. We assume no obligation to revise or update these forward-looking statements except as required by applicable law.
Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.
View source version on businesswire.com: https://www.businesswire.com/news/home/20240125830525/en/
E3 Lithium - Investor and Media Relations
Robin Boschman
Director, Investor Relations and Corporate Communications
investor@e3lithium.ca
587-324-2775
Source: E3 Lithium Ltd.
FAQ
What did E3 Lithium discover through the new six well sampling program in the Nisku Aquifer?
What were the results of the lithium concentrations sampled from the six wells in the Nisku Aquifer?
What are the geologic properties of the Nisku Aquifer compared to the Leduc Aquifer?
What were the previously reported lithium concentrations from different well locations?