DLP Resources Intersects 954m of 0.36% CuEq* and 94.00m of 0.81% Cu on the Aurora Project in Southern Peru
DLP Resources Inc. (TSXV: DLP) (OTCQB: DLPRF) announced results from drillholes A24-017 and A24-018 on the Aurora porphyry copper-molybdenum-silver project in southern Peru. Highlights include:
- A24-017: 0.81% Cu over 94.00m from 31m to 125.00m
- A24-018: 0.36% CuEq* (0.23% Cu, 0.02% Mo, 2.09g/t Ag) over 954m from 164.00m to 1118.00m
The drilling expanded copper mineralization to the northeast and southwest. A24-017 confirmed shallow copper mineralization in the northeast, while A24-018 expanded the footprint of copper-molybdenum and silver mineralization in the southwest.
The company also provided an update on the NZOU Project in SE British Columbia, where drilling ended at 1759m without significant zinc mineralization. No further drilling is planned for NZOU.
DLP Resources Inc. (TSXV: DLP) (OTCQB: DLPRF) ha annunciato i risultati dei pozzi di sondaggio A24-017 e A24-018 nel progetto aurifero di rame-molibdeno-argento Aurora nel sud del Perù. I punti salienti includono:
- A24-017: 0,81% Cu su 94,00m da 31m a 125,00m
- A24-018: 0,36% CuEq* (0,23% Cu, 0,02% Mo, 2,09g/t Ag) su 954m da 164,00m a 1118,00m
Il sondaggio ha ampliato la mineralizzazione di rame verso nord-est e sud-ovest. A24-017 ha confermato la mineralizzazione di rame superficiale a nord-est, mentre A24-018 ha esteso l'area di mineralizzazione di rame-molibdeno e argento a sud-ovest.
L'azienda ha anche fornito un aggiornamento sul progetto NZOU nel sud-est della Columbia Britannica, dove il sondaggio è terminato a 1759m senza significative mineralizzazioni di zinco. Non sono previsti ulteriori sondaggi per NZOU.
DLP Resources Inc. (TSXV: DLP) (OTCQB: DLPRF) anunció los resultados de los agujeros de perforación A24-017 y A24-018 en el proyecto de cobre-molibdeno-plata Aurora en el sur de Perú. Los aspectos más destacados incluyen:
- A24-017: 0.81% Cu sobre 94.00m desde 31m hasta 125.00m
- A24-018: 0.36% CuEq* (0.23% Cu, 0.02% Mo, 2.09g/t Ag) sobre 954m desde 164.00m hasta 1118.00m
La perforación amplió la mineralización de cobre al noreste y suroeste. A24-017 confirmó la mineralización de cobre superficial en el noreste, mientras que A24-018 expandió la huella de mineralización de cobre-molibdeno y plata en el suroeste.
La empresa también proporcionó una actualización sobre el proyecto NZOU en el sureste de Columbia Británica, donde la perforación terminó a 1759m sin mineralización significativa de zinc. No se planea más perforación para NZOU.
DLP Resources Inc. (TSXV: DLP) (OTCQB: DLPRF)은 페루 남부에 있는 오로라 포픽리 구리-몰리브데넘-은 프로젝트의 드릴홀 A24-017 및 A24-018 결과를 발표했습니다. 주요 내용은 다음과 같습니다:
- A24-017: 31m에서 125.00m까지 94.00m 동안 0.81% Cu
- A24-018: 164.00m에서 1118.00m까지 954m 동안 0.36% CuEq* (0.23% Cu, 0.02% Mo, 2.09g/t Ag)
이번 드릴링은 북동쪽과 남서쪽으로 구리 광물화를 확장했습니다. A24-017은 북동쪽에서 얕은 구리 광물화를 확인했고, A24-018은 남서쪽에서 구리-몰리브데넘 및 은 광물화의 면적을 확장했습니다.
회사는 또한 브리티시컬럼비아 남동부의 NZOU 프로젝트에 대한 업데이트를 제공했으며, 이 곳의 드릴링은 1759m에서 종료되었고, 중대한 아연 광물화는 발견되지 않았습니다. NZOU에 대해 추가적인 드릴링 계획은 없습니다.
DLP Resources Inc. (TSXV: DLP) (OTCQB: DLPRF) a annoncé les résultats des forages A24-017 et A24-018 sur le projet de cuivre-molybdène-argent Aurora dans le sud du Pérou. Les points saillants comprennent :
- A24-017 : 0,81 % Cu sur 94,00 m de 31 m à 125,00 m
- A24-018 : 0,36 % CuEq* (0,23 % Cu, 0,02 % Mo, 2,09 g/t Ag) sur 954 m de 164,00 m à 1118,00 m
Le forage a élargi la minéralisation de cuivre vers le nord-est et le sud-ouest. A24-017 a confirmé une minéralisation de cuivre peu profonde dans le nord-est, tandis que A24-018 a étendu l'empreinte de la minéralisation de cuivre-molybdène et d'argent dans le sud-ouest.
L'entreprise a également fourni une mise à jour sur le projet NZOU dans le sud-est de la Colombie-Britannique, où le forage s'est terminé à 1759 m sans minéralisation significative de zinc. Aucun forage supplémentaire n'est prévu pour NZOU.
DLP Resources Inc. (TSXV: DLP) (OTCQB: DLPRF) gab die Ergebnisse der Bohrlöcher A24-017 und A24-018 im Aurora Porphyr Kupfer-Molybdän-Silber-Projekt im Süden Perus bekannt. Die Highlights umfassen:
- A24-017: 0,81% Cu über 94,00m von 31m bis 125,00m
- A24-018: 0,36% CuEq* (0,23% Cu, 0,02% Mo, 2,09g/t Ag) über 954m von 164,00m bis 1118,00m
Die Bohrungen haben die Kupfermineralisierung nordost- und südwestwärts erweitert. A24-017 bestätigte eine flache Kupfermineralisierung im Nordosten, während A24-018 die Ausdehnung der Kupfer-Molybdän- und Silbermineralisierung im Südwesten erweiterte.
Das Unternehmen gab auch ein Update zum NZOU-Projekt im Südosten von British Columbia, wo die Bohrungen bei 1759m endeten, ohne nennenswerte Zinkmineralisierung zu entdecken. Weitere Bohrungen für NZOU sind nicht geplant.
- Drillhole A24-017 intersected high-grade copper mineralization: 0.81% Cu over 94.00m
- Drillhole A24-018 showed extensive mineralization: 0.36% CuEq over 954m
- Expansion of copper-molybdenum-silver mineralization footprint in the Aurora project
- Continued success with expansion drilling at Aurora
- No significant zones of zinc mineralization observed in the NZOU Project
- No further drilling planned for the NZOU Project
Cranbrook, British Columbia--(Newsfile Corp. - September 26, 2024) - DLP Resources Inc. (TSXV: DLP) (OTCQB: DLPRF) ("DLP" or the "Company") announces receipt of complete drill results for drillholes A24-017 and A24-018 on the Aurora porphyry copper-molybdenum-silver project in southern Peru. (Figure 1).
Results for the first sixteen drillholes, were last released between January 04 and August 15, 2024 (see DLP Resources Inc., news release of January 04, 2024, June 25, 2024 and August 15, 2024 for results for the previous sixteen drillholes).
Highlights
Drillhole A24-017 was drilled off a drill platform approximately 169m northeast of A22-003 with the aim of expanding the copper mineralization further to the east. This drillhole intersected copper mineralization from surface extending to 125m in mineralized hornfels. Results were as follows:
0.63% Cu over 125m from 0.00m to 125.00m.0.81% Cu over 94.00m from 31m to 125.00m.
Drillhole A24-018 was drilled off the same platform as the vertical hole A23-013 but drilled at -70 degrees to the south. The purpose of this hole was to expand the copper-molybdenum-silver mineralization towards the southwest side where the limits of mineralization are still uncertain. Results for this hole were as follows:
0.36% CuEq* (0.23% Cu,0.02% Mo, 2.09g/t Ag) over 954m from 164.00m to 1118.00m.
The complete set of results for A24-017 and A24-018 are summarized in Table 1 below.
Mr. Gendall, President and CEO commented: "A24-017 confirmed shallow copper mineralization in the northeast with A24-018 expanding the footprint of copper-molybdenum and silver mineralization in the southwest side of Aurora. We continue to have success with the expansion drilling at Aurora and we look forward to results from further planned drilling in the southeast".
Aurora Cu-Mo Project - Summary of Drill Results for A24-017 and A24-018
- Drill hole A24-017 (Figures 2 and 3) commenced on June 24th at an inclination of -70 degrees on an azimuth of 085 degrees. and ended on August 15 at 987.25m. Summary geology is as follows:
- 0 - 125.00m: Mineralized hornfels with copper enrichment.
- 125.00m - 987.25m: Weakly mineralized hornfels.
- Drill hole A24-018 (Figures 2 and 3) commenced on July 23rd at an inclination of -70 degrees on an azimuth of 185 degrees. and ended on August 29 at 1118.00m. Summary geology is as follows:
- 0 - 113.50m: Mineralized hornfels with chalcopyrite, chalcocite and covellite within the enrichment zone.
- 113.50m - 429.80m: Mineralized quartz-eye-feldspar porphyry.
- 429.80m - 491.30m Mineralized quartz-eye-feldspar-biotite porphyry with intercalated mineralized hornfels
- 491.30m - 1118.00m: Mineralized hornfels with occasional mineralized porphyry dykes of between 2m and 8m in width.
Table 1. Summary of Drill Results for Diamond Drillhole A24-017 and A24-018. All grades are length-weighted averages of samples within the interval reported.
Hole | From | To | Interval1 | Description | Cu (total) | Mo | Ag | Cueq* |
ID | m | m | m | % | % | g/t | % | |
A24-017 | 0.00 | 125.00 | 125.00 | Mineralized hornfels | 0.63 | 0.0001 | 0.67 | 0.64 |
Includes | 31.00 | 125.00 | 94.00 | Mineralized hornfels - copper enrichment | 0.81 | 0.0002 | 1.03 | 0.82 |
A24-018 | 0.00 | 164.00 | 164.00 | Leached zone - hornfels + porphyry | 0.07 | 0.0058 | 2.25 | 0.12 |
164.00 | 1118.00 | 954.00 | Mineralized hornfels + mineralized porphyry | 0.23 | 0.0214 | 2.09 | 0.36 |
Note: *Copper equivalent grades (CuEq) are for comparative purposes only. Mo and Cu are uncut and Ag values are cut to 100g/t, and core recovery is assumed to be
*Copper equivalent calculations use metal prices of Cu - US
1 Intervals are downhole drilled core lengths. Drilling data to date is insufficient to determine true width of mineralization. Mo and Cu are uncut and Ag values are cut to 100g/t.
Table 2: A24-017 and A24-018 Diamond drillhole locations, depth, orientation and inclination.
Hole | Easting | Northing | Elevation | Length | Azimuth | Inclination |
ID | m | m | m | m | Degrees | Degrees |
A24-017 | 190,196 | 8,566,399 | 2837 | 987.25 | 85 | -70 |
A24-018 | 189,904 | 8,565,904 | 3022 | 1118.00 | 185 | -70 |
Co-ordinates are in WGS84 Zone 19S.
Quality Control and Quality Assurance
DLP Resources Peru S.A.C, a subsidiary of DLP Resources Inc., supervises drilling and carries out sampling of HTW, NTW and BTW core. Logging and sampling are completed at a secured Company facility situated on the project site. Sample intervals are nominally 1m to 3m in length. Drill core is cut in half using a rotary diamond blade saw and samples are sealed on site before transportation to the ALS Peru S.A.C. sample preparation facility in Arequipa by Company vehicles and staff. Prepared samples are sent to Lima by ALS Peru S.A.C. for analysis. ALS Peru S.A.C. is an independent laboratory. Samples are analyzed for 48 elements using a four-acid digestion and ICP-MS analysis (ME-MS61). In addition, sequential copper analyses are done where secondary copper mineralization is observed and reports, soluble copper using sulphuric acid leach, soluble copper in cyanide leach, residual copper and total copper. ALS meets all requirements of International Standards ISO/IEC 17025:2005 and ISO 9001:2015 for analytical procedures.
DLP Resources independently monitors quality control and quality assurance ("QA/QC") through a program that includes the insertion of blind certified reference materials (standards), blanks and pulp duplicate samples. The company is not aware of any drilling, sampling, recovery or other factors that could materially affect the accuracy or reliability of the data except for intervals in A24-017 from 0 to 8m, 25 to 31m, 42 to 46m and 63 to 67m with only 39 to
Aurora Project
Aurora Project is an advanced stage porphyry copper-molybdenum exploration project in the Province of Calca, SE Peru (Figure 1). The Aurora Project was previously permitted for drilling in 2015 but was never executed. Thirteen historical drillholes, drilled in 2001 and 2005 totaling 3,900m were drilled over an area of approximately 1000m by 800m, cut significant intervals of copper and molybdenum mineralization. From logging of the only three remaining holes DDA-01, DDA-3A and DDA-3 and data now available, it appears that only three of the thirteen holes tested the enriched copper zone and only one hole drilled deep enough to test the primary copper and molybdenum zone (see DLP Resources Inc. news release of May 18, 2021).
Salient historic drillhole data of the Aurora Project are:
190m @
0.57% Cu,0.008% Mo in DDA-1 with a high-grade intercept of 20m @1.01% Cu related to a supergene enrichment zone of secondary chalcocite;142m @
0.5% Cu,0.004% Mo in DDA-3;71.7m @
0.7% Cu,0.007% Mo in DDA-3A (see historical Focus Ventures Ltd. news release July 11, 2012); andOne of the historical holes ABC-6 drilled on the edge of the system intersected 78m @
0.45% Cu and0.107% Mo (Figure 2).
A review of the historical drilling indicates that the majority of the thirteen holes were drilled in the leached and partially leached zones of the porphyry system. Ten of the thirteen holes never fully tested the oxide and secondary enrichment zone and/or the primary copper zone at depth encountered in DDA-01. Copper-molybdenum mineralization is hosted by quartz-feldspar porphyries intruded into slates-hornfels and pelitic sandstones belonging to the Ordovician (439 - 463 ma) Sandia Formation.
NZOU Project - Sullivan Zn-Pb-Ag Target - SE British Columbia (Figure 4)
A one-hole drill program which commenced in 2023 on the NZOU Project was re-started on June 18, 2024, at a depth of 1330m (see news releases of June 13, 2023 and June 21, 2024). This drillhole NZ23-01, was collared in Middle Aldridge siltstones and ended at a depth of 1759m on July 21st. From 1454m to end of hole at 1759m, Sullivan horizon siltstones and fragmentals with strong sericitization, biotite, albite and chlorite alteration were logged in meta siltstones. Pyrrhotite was disseminated throughout with trace to minor sphalerite, galena and arsenopyrite. No significant zones of zinc mineralization were observed.
No further drilling on NZOU is planned.
Figure 1: DLP Project areas in Peru with Aurora Project Shown.
To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/6456/224668_945a0d89548048e6_001full.jpg
Figure 2: Aurora Project - Plan view showing historic drilling and drilling by DLP in 2022-2023-2024 with A24-017 and A24-018 highlighted in red.
To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/6456/224668_945a0d89548048e6_002full.jpg
Figure 3: Aurora Project - Simplified NW-SE section 1-1' showing DLP and historic drillholes. Mo is on the left and the Cu is within the drillhole column.
To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/6456/224668_945a0d89548048e6_003full.jpg
Figure 4: Titan MT resistivity plan at 0m elevation with the main MT anomaly trending NE from DD21-02 onto the Moby Dick and NZOU properties. NZ23-01 shown with red dot.
To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/6456/224668_945a0d89548048e6_004full.jpg
Qualified Person
David L. Pighin, consulting geologist and co-founder of DLP Resources, is the qualified person of the Company as defined by National Instrument 43-101. Mr. Pighin has reviewed and approved the technical contents of this news release.
About DLP Resources Inc.
DLP Resources Inc. is a mineral exploration company operating in Southeastern British Columbia and Peru, exploring for Base Metals and Cobalt. DLP is listed on the TSX-V, trading symbol DLP and on the OTCQB, trading symbol DLPRF. Please refer to our web site www.dlpresourcesinc.com for additional information.
FOR FURTHER INFORMATION PLEASE CONTACT:
DLP RESOURCES INC.
Ian Gendall, CEO & President
Jim Stypula, Executive Chairman
Robin Sudo, Corporate Secretary and Land Manager
Maxwell Reinhart, Investor Relations
Telephone: 250-426-7808
Email: iangendall@dlpresourcesinc.com
Email: jimstypula@dlpresourcesinc.com
Email: robinsudo@dlpresourcesinc.com
Email: maxreinhart@dlpresourcesinc.com
Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.
Cautionary Note Regarding Forward-Looking Information
This release includes certain statements and information that may constitute forward-looking information within the meaning of applicable Canadian securities laws. Forward-looking statements relate to future events or future performance and reflect the expectations or beliefs of management of the Company regarding future events. Generally, forward-looking statements and information can be identified by the use of forward-looking terminology such as "intends" or "anticipates", or variations of such words and phrases or statements that certain actions, events or results "may", "could", "should", "would" or "occur". This information and these statements, referred to herein as "forward‐looking statements", are not historical facts, are made as of the date of this news release and include without limitation, statements regarding discussions of future plans, estimates and forecasts and statements as to management's expectations and intentions with respect to drilling on the Aurora Project in Peru.
These forward‐looking statements involve numerous risks and uncertainties, and actual results might differ materially from results suggested in any forward-looking statements. These risks and uncertainties include, among other things drill results expected from the Aurora Project in Peru.
Although management of the Company has attempted to identify important factors that could cause actual results to differ materially from those contained in forward-looking statements or forward-looking information, there may be other factors that cause results not to be as anticipated, estimated or intended. There can be no assurance that such statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking statements and forward-looking information. Readers are cautioned that reliance on such information may not be appropriate for other purposes. The Company does not undertake to update any forward-looking statement, forward-looking information or financial out-look that are incorporated by reference herein, except in accordance with applicable securities laws. We seek safe harbor.
To view the source version of this press release, please visit https://www.newsfilecorp.com/release/224668
FAQ
What were the key results from drillhole A24-017 on the Aurora project?
What were the significant findings from drillhole A24-018 on the Aurora project?
What is the current status of the NZOU Project for DLP Resources (DLPRF)?