Defense Metals Corp. Drills 3.81% Total Rare Earth Oxide Over 117 Metres; Including 4.87% Over 38 Metres at Wicheeda
Defense Metals Corp. announced results for six diamond drill holes from its 2021 drilling program at the Wicheeda Rare Earth Element deposit, covering 879 metres. Significant intersections were reported, including 3.06% TREO over 145 metres in WI21-54, extending the known zone of high-grade mineralization. The drilling confirms and expands inferred resources, enhancing the geological model. Assay results from the 2021 campaign continue to be released, with additional results expected next week.
- High-grade dolomite carbonatite intervals confirmed, with WI21-54 returning 3.06% TREO over 145 metres.
- Expansion of the high-grade zone extends 25 metres beyond prior geological model estimates.
- Robust geological model anticipated to support an upgrade of inferred resources to indicated status.
- None.
VANCOUVER, BC, April 21, 2022 /PRNewswire/ - Defense Metals Corp. ("Defense Metals" or the "Company") (TSXV: DEFN) (OTCQB: DFMTF) (FSE: 35D) is pleased to announce results for an additional six diamond drill holes totalling 879 metres from the Company's 29 hole, 5,349 metre diamond drill program completed during fall 2021. Drill holes WI21-51 through WI21-56 were collared from the same site and within the southern area of the Wicheeda Rare Earth Element (REE) deposit.
Resource definition drill holes WI21-52 through WI21-55 collared from the same setup all confirmed significant intervals of high-grade dolomite carbonatite as expected based on the geological and mineral resource block model; including drill hole WI21-54 that returned
The Company continues to receive additional assay results from the 2021 Wicheeda REE Deposit resource expansion and delineation campaign that will be released next week.
Luisa Moreno, President, and Director of Defense Metals stated: "A important goal of the 2021 drill campaign was the upgrading existing inferred mineral resources to indicated category. We are pleased that resource delineation drilling within the southern Wicheeda Deposit has confirmed, and locally expended, the extent of high-grade dolomite carbonatite mineralization. This speaks to the robustness of our geological model which will be a key factor in establishing indicated and ultimately measured mineral resources as we continued to advance the Wicheeda Deposit."
Delineation drill holes WI21-52 (-45o dip / 260o azimuth) and WI21-53 (-65o dip / 260o azimuth) on the same section both interested high-grade dolomite carbonatite intervals from surface matching closely to the geological and resource block model, averaging
Similarly, drill holes WI21-54 (-45o dip / 320o azimuth) and WI21-55 (-65o dip / 320o azimuth) on the same section with WI21-54 returning
Delineation drill holes WI21-51 (-55o dip / 030o azimuth) and WI21-56 (-45o dip / 065o azimuth) targeted the relatively untested southeastern depth extent of the Wicheeda deposit. Both holes returned higher grade dolomite carbonatite intercepts from surface averaging
Hole ID | From (m) | To (m) | Interval (m) | TREO1 (%) | Ce2O3 (%) | La2O3 (%) | Nd2O3 (%) | Pr2O3 (%) | Sm2O3 (ppm) | Gd2O3 (ppm) | Eu2O3 (ppm) | Dy2O3 (ppm) | Tb4O7 (ppm) | Ho2O3 (ppm) |
WI21-51 (030/-55) | 4.25 | 92.7 | 88.45 | 2.47 | 1.18 | 0.88 | 0.26 | 0.09 | 267 | 127 | 56 | 25 | 9 | 3 |
and | 92.7 | 251 | 158.3 | 1.27 | 0.62 | 0.39 | 0.17 | 0.05 | 206 | 103 | 46 | 32 | 9 | 4 |
WI21-52 (260/-45) | 3.25 | 72.8 | 69.55 | 3.31 | 1.58 | 1.16 | 0.37 | 0.13 | 395 | 188 | 84 | 53 | 17 | 6 |
WI21-53 (260/-65) | 2.7 | 83 | 80.3 | 3.06 | 1.48 | 1.08 | 0.32 | 0.12 | 319 | 148 | 68 | 37 | 13 | 4 |
WI21-54 (320/-45) | 2.4 | 147 | 144.6 | 3.06 | 1.48 | 1.10 | 0.31 | 0.12 | 306 | 132 | 61 | 32 | 11 | 3 |
WI21-55 (320/-65) | 2.2 | 119 | 116.8 | 3.81 | 1.85 | 1.36 | 0.39 | 0.15 | 364 | 169 | 77 | 36 | 13 | 4 |
including | 2.2 | 41 | 38.8 | 4.33 | 2.11 | 1.51 | 0.46 | 0.17 | 459 | 208 | 92 | 45 | 16 | 5 |
including | 67 | 104.5 | 37.5 | 4.87 | 2.36 | 1.79 | 0.47 | 0.18 | 403 | 188 | 87 | 39 | 14 | 4 |
WI21-56 (065/-45) | 5.35 | 56.5 | 51.15 | 3.56 | 1.74 | 1.27 | 0.35 | 0.14 | 323 | 140 | 66 | 33 | 11 | 3 |
and | 56.5 | 225.2 | 168.7 | 1.41 | 0.69 | 0.47 | 0.16 | 0.06 | 196 | 89 | 43 | 20 | 7 | 2 |
WI21-33 (350/-80) | 5.00 | 201.00 | 196 | 3.17 | 1.52 | 1.07 | 0.37 | 0.13 | 382 | 181 | 81 | 42 | 14 | 4 |
including | 5.00 | 55.25 | 50.25 | 3.63 | 1.74 | 1.26 | 0.41 | 0.14 | 396 | 181 | 84 | 52 | 16 | 6 |
including | 146.00 | 201.00 | 55.00 | 4.29 | 2.07 | 1.48 | 0.47 | 0.17 | 489 | 232 | 112 | 52 | 18 | 5 |
WI21-34 (040/-55) | 3.00 | 117.00 | 114.00 | 2.97 | 1.46 | 1.02 | 0.33 | 0.11 | 323 | 134 | 58 | 23 | 9 | 2 |
including | 3.00 | 70.00 | 67.00 | 3.84 | 1.89 | 1.34 | 0.41 | 0.15 | 379 | 160 | 69 | 29 | 11 | 3 |
WI21-35 (080/-55) | 1.20 | 121.00 | 119.80 | 3.87 | 1.87 | 1.34 | 0.43 | 0.15 | 434 | 200 | 88 | 52 | 17 | 6 |
WI21-36 (108/-80) | 1.10 | 174.00 | 172.90 | 2.34 | 1.14 | 0.78 | 0.27 | 0.09 | 293 | 134 | 59 | 35 | 11 | 4 |
including | 1.10 | 35.65 | 34.55 | 3.45 | 1.66 | 1.21 | 0.38 | 0.13 | 374 | 170 | 72 | 37 | 13 | 4 |
including | 136.00 | 174.00 | 38.00 | 3.02 | 1.46 | 1.05 | 0.33 | 0.12 | 337 | 157 | 68 | 40 | 13 | 4 |
WI21-37 (108/-45) | 2.00 | 139.85 | 137.85 | 3.19 | 1.56 | 1.10 | 0.35 | 0.12 | 351 | 144 | 66 | 30 | 11 | 3 |
including | 2.00 | 57.00 | 55.00 | 4.00 | 1.96 | 1.38 | 0.42 | 0.15 | 427 | 164 | 76 | 35 | 12 | 3 |
WI21-38 (220/-70) | 1.35 | 82.00 | 80.65 | 3.08 | 1.50 | 1.07 | 0.33 | 0.12 | 346 | 154 | 70 | 40 | 13 | 4 |
including | 1.35 | 24.75 | 23.4 | 6.01 | 2.91 | 2.14 | 0.62 | 0.23 | 607 | 246 | 114 | 60 | 20 | 6 |
WI21-39 (285/-60) | 4 | 114 | 110 | 2.62 | 1.28 | 0.87 | 0.30 | 0.10 | 320 | 158 | 73 | 42 | 13 | 5 |
and | 114 | 224.8 | 110.8 | 0.72 | 0.35 | 0.21 | 0.10 | 0.03 | 129 | 75 | 31 | 30 | 8 | 4 |
WI21-40 (345/-65) | 2.75 | 165 | 162.25 | 3.23 | 1.57 | 1.11 | 0.36 | 0.13 | 370 | 158 | 70 | 39 | 13 | 4 |
including | 2.75 | 47.5 | 44.75 | 4.21 | 2.05 | 1.46 | 0.46 | 0.16 | 452 | 197 | 92 | 61 | 18 | 7 |
including | 96 | 167 | 71 | 3.67 | 1.79 | 1.26 | 0.41 | 0.14 | 411 | 173 | 75 | 35 | 13 | 3 |
WI21-43 (045/-85) | 10.75 | 124.1 | 113.35 | 0.55 | 0.26 | 0.17 | 0.07 | 0.02 | 121 | 84 | 33 | 35 | 9 | 5 |
WI21-44 (240/-60) | 17.5 | 125.6 | 108.1 | 1.72 | 0.83 | 0.57 | 0.20 | 0.07 | 266 | 141 | 69 | 47 | 14 | 6 |
including | 35 | 89 | 54 | 2.59 | 1.24 | 0.87 | 0.29 | 0.10 | 384 | 205 | 102 | 70 | 20 | 9 |
WI21-45 (240/-75) | 47.8 | 106.9 | 59.1 | 1.46 | 0.67 | 0.51 | 0.17 | 0.06 | 230 | 134 | 83 | 43 | 13 | 6 |
including | 47.8 | 74 | 26.2 | 2.48 | 1.13 | 0.88 | 0.29 | 0.10 | 384 | 225 | 151 | 67 | 21 | 8 |
WI21-46 (190/-50) | 18.9 | 135.3 | 116.4 | 1.66 | 0.80 | 0.56 | 0.20 | 0.06 | 229 | 108 | 47 | 28 | 9 | 3 |
including | 48 | 90 | 42 | 2.27 | 1.09 | 0.79 | 0.25 | 0.09 | 271 | 112 | 48 | 22 | 8 | 2 |
including | 117.55 | 135.3 | 17.75 | 2.32 | 1.12 | 0.74 | 0.30 | 0.09 | 350 | 170 | 75 | 42 | 14 | 5 |
WI21-47 (280/-60) | 17 | 98.36 | 81.36 | 0.58 | 0.28 | 0.18 | 0.08 | 0.02 | 108 | 67 | 30 | 29 | 7 | 4 |
WI21-48 (145/-45) | 12 | 188 | 176 | 2.50 | 1.22 | 0.84 | 0.29 | 0.10 | 306 | 130 | 57 | 27 | 10 | 3 |
including | 12 | 32 | 20 | 6.15 | 2.98 | 2.11 | 0.69 | 0.24 | 669 | 311 | 142 | 80 | 25 | 9 |
WI21-49 (190/-70) | 33 | 183 | 150 | 3.79 | 1.80 | 1.36 | 0.41 | 0.14 | 430 | 197 | 86 | 45 | 16 | 5 |
including | 82 | 142 | 60 | 4.77 | 2.28 | 1.71 | 0.51 | 0.18 | 520 | 228 | 103 | 54 | 18 | 5 |
WI21-50 (215/-50) | 23 | 149.7 | 126.7 | 1.60 | 0.76 | 0.55 | 0.18 | 0.06 | 205 | 110 | 47 | 34 | 10 | 4 |
including | 50.35 | 85.65 | 35.3 | 3.34 | 1.59 | 1.23 | 0.33 | 0.12 | 341 | 166 | 72 | 40 | 13 | 4 |
The
The Wicheeda REE Project yielded a robust 2021 PEA that demonstrated an after-tax net present value (NPV@
The analytical work reported on herein was performed by ALS Canada Ltd. (ALS) at Langley (sample preparation) and Vancouver (ICP-MS fusion), B.C. ALS is an ISO-IEC 17025:2017 and ISO 9001:2015 accredited geoanalytical laboratory and is independent of the Defense Metals and the QP. Drill core samples were subject to crushing at a minimum of
The scientific and technical information contained in this news release as it relates to the Wicheeda REE Project has been reviewed and approved by Kristopher J. Raffle, P.Geo. (BC) Principal and Consultant of APEX Geoscience Ltd. of Edmonton, AB, a director of Defense Metals and a "Qualified Person" as defined in NI 43-101. Mr. Raffle verified the data disclosed which includes a review of the sampling, analytical and test data underlying the information and opinions contained therein.
Defense Metals Corp. is a mineral exploration and development company focused on the acquisition, exploration and development of mineral deposits containing metals and elements commonly used in the electric power market, defense industry, national security sector and in the production of green energy technologies, such as, rare earths magnets used in wind turbines and in permanent magnet motors for electric vehicles. Defense Metals owns
Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this news release.
This news release contains "forward‐looking information or statements" within the meaning of applicable securities laws, which may include, without limitation, statements relating to advancing the Wicheeda REE Project, drill results including anticipated timeline of such results/assays, the Company's plans for its Wicheeda REE Project, expanded resource and scale of expanded resource, expected results and outcomes, the technical, financial and business prospects of the Company, its project and other matters. All statements in this news release, other than statements of historical facts, that address events or developments that the Company expects to occur, are forward-looking statements. Although the Company believes the expectations expressed in such forward-looking statements are based on reasonable assumptions, such statements are not guarantees of future performance and actual results may differ materially from those in the forward-looking statements. Such statements and information are based on numerous assumptions regarding present and future business strategies and the environment in which the Company will operate in the future, including the price of rare earth elements, the anticipated costs and expenditures, the ability to achieve its goals, that general business and economic conditions will not change in a material adverse manner, that financing will be available if and when needed and on reasonable terms. Such forward-looking information reflects the Company's views with respect to future events and is subject to risks, uncertainties and assumptions, including the risks and uncertainties relating to the interpretation of exploration results, risks related to the inherent uncertainty of exploration and cost estimates, the potential for unexpected costs and expenses and those other risks filed under the Company's profile on SEDAR at www.sedar.com While such estimates and assumptions are considered reasonable by the management of the Company, they are inherently subject to significant business, economic, competitive and regulatory uncertainties and risks. Factors that could cause actual results to differ materially from those in forward looking statements include, but are not limited to, continued availability of capital and financing and general economic, market or business conditions, adverse weather and climate conditions, failure to maintain or obtain all necessary government permits, approvals and authorizations, failure to maintain community acceptance (including First Nations), risks relating to unanticipated operational difficulties (including failure of equipment or processes to operate in accordance with specifications or expectations, cost escalation, unavailability of materials and equipment, government action or delays in the receipt of government approvals, industrial disturbances or other job action, and unanticipated events related to health, safety and environmental matters), risks relating to inaccurate geological and engineering assumptions, decrease in the price of rare earth elements, the impact of Covid-19 or other viruses and diseases on the Company's ability to operate, an inability to predict and counteract the effects of COVID-19 on the business of the Company, including but not limited to, the effects of COVID-19 on the price of commodities, capital market conditions, restriction on labour and international travel and supply chains, loss of key employees, consultants, or directors, increase in costs, delayed drilling results, litigation, and failure of counterparties to perform their contractual obligations. The Company does not undertake to update forward‐looking statements or forward‐looking information, except as required by law.
____________ |
1TREO % sum of CeO2, La2O3, Nd2O3, Pr6O11, Sm2O3, Eu2O3, Gd2O3, Tb4O7, Dy2O3 and Ho2O3. |
2 Independent Preliminary Economic Assessment for the Wicheeda Rare Earth Element Project, British Columbia, Canada, dated January 6, 2022, with an effective date of November 7, 2021, and prepared by SRK Consulting (Canada) Inc. is filed under Defense Metals Corp.'s Issuer Profile on SEDAR (www.sedar.com). |
View original content to download multimedia:https://www.prnewswire.com/news-releases/defense-metals-corp-drills-3-81-total-rare-earth-oxide-over-117-metres--including-4-87-over-38-metres-at-wicheeda-301530000.html
SOURCE Defense Metals Corp.
FAQ
What are the recent drill results from Defense Metals Corp. for DFMTF?
How does the recent drilling impact the Wicheeda Rare Earth Element deposit?
What is the significance of the TREO percentage in the drill results for DFMTF?