Caledonia Mining Corporation Plc Results for the Year ended December 31, 2021

Rhea-AI Impact
(Neutral)
Rhea-AI Sentiment
(Neutral)
Tags
Rhea-AI Summary

Caledonia Mining Corporation Plc (NYSE AMERICAN: CMCL) reported strong operating and financial results for 2021. Gross revenues rose to $121 million, up from $100 million in 2020. Gross profit increased to $54.1 million and EBITDA to $46.4 million. The company produced a record 67,476 ounces of gold and increased dividends by 49%. The commissioning of the Central Shaft is expected to boost production further in 2022, with guidance set at 73,000 to 80,000 ounces. However, a fatal accident raised safety concerns, prompting a reassessment of safety protocols.

Positive
  • Gross revenues increased to $121 million in 2021, up from $100 million in 2020.
  • Record gold production of 67,476 ounces, exceeding guidance.
  • Gross profit rose to $54.1 million, marking a 16% increase from 2020.
  • Dividends increased by 49% to 50 cents per share.
  • Successful commissioning of the Central Shaft project, costing approximately $67 million.
Negative
  • A fatal accident occurred on February 21, 2022, raising safety concerns.

Notice of Management Conference Call

ST HELIER, Jersey, March 17, 2022 (GLOBE NEWSWIRE) -- Caledonia Mining Corporation Plc ("Caledonia" or the "Company") (NYSE AMERICAN: CMCL; AIM: CMCL; VFEX: CMCL) announces its operating and financial results for the year ended December 31, 2021 (the "Year"). Further information on the financial and operating results for the Year and the quarter ended December 31, 2021 (the "Quarter" or "Q4") can be found in the Management Discussion and Analysis ("MD&A"), and the audited financial statements which are available on the Company’s website and which have been filed on SEDAR.

 2021 Financial Highlights

  • Gross revenues of $121 million (2020: $100 million).
  • Gross profit of $54.1 million (2020: $46.7 million).
  • EBITDA of $46.4 million (2020: $45.4 million).
  • On-mine cost per ounce1 of $742 (2020: $744).
  • Normalised all-in sustaining cost per ounce1 (i.e. excluding the effect of the export credit incentive and its successor scheme) of $990 (2020: $967).
  • Adjusted earnings per share1 of 226 cents (2020: 204 cents).
  • Net cash from operating activities of $30.9 million (2020: $30.9 million).
  • Net cash and cash equivalents of $17.2 million (2020: $19.1 million).
  • Total dividend paid of 50 cents per share, a 49 per cent increase from 2020.

Operating Highlights

  • 67,476 ounces of gold produced in the Year (2020: 57,899 ounces); record annual production at Blanket Mine.
  • The Central Shaft was commissioned in the first quarter of 2021 and the final stages of underground development and infrastructure are now being completed.
  • During Q4, Caledonia completed the acquisition of the mining claims at Maligreen in the Zimbabwe midlands which is estimated to host a NI 43-101 compliant inferred mineral resource of approximately 940,000 ounces of gold in 15.6 million tonnes at a grade of 1.88g/t2.

Post Year-End events and Outlook

  • Regrettably, a fatal accident occurred on February 21, 2022. The Directors and management of Caledonia and Blanket express their sincere condolences to the family and colleagues of the deceased. Caledonia takes the safety of its employees very seriously and, accordingly, measures have been taken to reinforce adherence to prescribed safety procedures.
  • 2022 gold production guidance of between 73,000 and 80,000 ounces.
  • Progress on the 12MWac solar plant has resumed following delays arising from the combined effects of COVID-19 and difficulties with the supply chain. The plant is expected to provide approximately 27 per cent of Blanket’s total daily electricity demand, improve Blanket’s security of electricity supply and reduce its environmental footprint. It is anticipated that the project will be commissioned in June 2022.
  • Following the installation of a further autotap transformer in December 2021, Blanket’s consumption of diesel to generate electricity has substantially reduced.

Conference Call

Management will host a conference call on 21 March to discuss its 2021 results and the outlook for the Company. The details for this call are set out towards the end of this announcement.

There will also be a results presentation video with management that will be available on the Caledonia website at https://www.caledoniamining.com/media/#corpvideos

Steve Curtis, Chief Executive Officer, commented:

"Operationally, the last 12 months have marked a turning point for the business. The Central Shaft has been a huge project costing approximately $67 million, all funded through internal cashflow and I am delighted that it was commissioned in the first quarter of 2021.

"Production in the Year was 67,476 ounces, which was above the top end of the guidance range and was a new record for annual production. The robust operating performance was supported by good cost control and gross profit for the Year was $54.1 million – 16 per cent higher than 2020. Cash generated from operations before working capital increased by 17 per cent from $42.4 million to $49.6 million.

"Now that the Central Shaft is commissioned, we expect further increases in production: guidance for 2022 is a range of 73,000 to 80,000 ounces while from 2023 onwards it is 80,000 ounces3 – 38 per cent higher than in 2020.

"We continued to increase the dividend in 2021. The total dividends paid in 2021 were 50 cents per share – almost 50 per cent higher than in 2020.

"To improve the quality and security of Blanket’s electricity supply, minimise our environmental footprint and help create a more sustainable future for our business, Caledonia is constructing the first phase of a 12 MWac solar plant that will provide approximately 27 per cent of the average daily electricity demand at Blanket Mine. This project, which is expected to yield a modest return to shareholders, is expected to be completed in mid-2022.

"Caledonia’s immediate strategic focus is to complete the remaining underground development associated with the Central Shaft project, which is expected to increase production, reduce operating costs and increase the flexibility to undertake further exploration and development at depth, thereby safeguarding and enhancing Blanket’s long-term future. We also believe there is excellent exploration potential in the older shallower areas of the mine and in brownfield sites immediately adjacent to the existing Blanket footprint.

"During the Year we acquired the mining claims at Maligreen in the Zimbabwe midlands which is estimated to host a NI 43-101 compliant inferred mineral resource of approximately 940,000 ounces of gold in 15.6 million tonnes at a grade of 1.88g/t. Our immediate focus on this asset is to improve the confidence level of the existing resource base and we are currently re-assaying historic drill cores. Thereafter we expect to prepare a feasibility study to commercialise the existing resource before we engage in further exploration on the claims area along strike, at depth and at a previously unexplored zone in the claims area.

"Our approach to new projects is highly disciplined: after further evaluation, the Company has decided not to exercise the options to acquire the Connemara North property as it does not meet our investment criteria. During the Year, we also divested non-core assets in the vicinity of Blanket. Caledonia continues to evaluate further investment opportunities in the Zimbabwe gold sector with a view to transforming the Company into a mid-tier, multi-asset Zimbabwe-focussed gold producer."

Conference Call Details

A presentation of the 2021 results and outlook for Caledonia is available on Caledonia’s website (www.caledoniamining.com). Management will host a conference call at 3pm GMT on 21st March 2022.

Details for the call are as follows:

When: Mar 21, 2022 03:00 PM London
Topic: Q4 Results Call for Shareholders

Register in advance for this webinar:
https://caledoniamining.zoom.us/webinar/register/WN_AazuhoJORKie314N-VsIQQ

After registering, you will receive a confirmation email containing information about joining the webinar.

Mr. Dana Roets (B Eng (Min.), MBA, Pr.Eng., FSAIMM, AMMSA), Chief Operating Officer, is the Company’s qualified person as defined by Canada’s National Instrument 43-101 and has approved any scientific or technical information contained in this news release.

Enquiries:

Caledonia Mining Corporation Plc
Mark Learmonth
Camilla Horsfall

Tel: +44 1534 679 802
Tel: +44 7817 841793
WH Ireland
Adrian Hadden/ Jessica Cave

Tel: +44 20 7220 1751
BlytheRay Financial PR
Tim Blythe/Megan Ray

Tel: +44 207 138 3204
3PPB
Patrick Chidley
Paul Durham

Tel: +1 917 991 7701
Tel: +1 203 940 2538
Curate Public Relations (Zimbabwe)
Debra Tatenda

Tel: +263 77802131

The information contained within this announcement is deemed by the Company to constitute inside information under the Market Abuse Regulation (EU) No. 596/2014.

Cautionary Note Concerning Forward-Looking Information

Information and statements contained in this news release that are not historical facts are "forward-looking information" within the meaning of applicable securities legislation that involve risks and uncertainties relating, but not limited to Caledonia’s current expectations, intentions, plans, and beliefs.  Forward-looking information can often be identified by forward-looking words such as "anticipate", "believe", "expect", "goal", "plan", "target", "intend", "estimate", "could", "should", "may" and "will" or the negative of these terms or similar words suggesting future outcomes, or other expectations, beliefs, plans, objectives, assumptions, intentions or statements about future events or performance. Examples of forward-looking information in this news release include: production guidance, estimates of future/targeted production rates, and our plans and timing regarding further exploration and drilling and development.  This forward-looking information is based, in part, on assumptions and factors that may change or prove to be incorrect, thus causing actual results, performance or achievements to be materially different from those expressed or implied by forward-looking information.  Such factors and assumptions include, but are not limited to: failure to establish estimated resources and reserves, the grade and recovery of ore which is mined varying from estimates, success of future exploration and drilling programs, reliability of drilling, sampling and assay data, assumptions regarding the representativeness of mineralization being inaccurate, success of planned metallurgical test-work, capital and operating costs varying significantly from estimates, delays in obtaining or failures to obtain required governmental, environmental or other project approvals, inflation, changes in exchange rates, fluctuations in commodity prices, delays in the development of projects and other factors.

Security holders, potential security holders and other prospective investors should be aware that these statements are subject to known and unknown risks, uncertainties and other factors that could cause actual results to differ materially from those suggested by the forward-looking statements.  Such factors include, but are not limited to: risks relating to estimates of mineral reserves and mineral resources proving to be inaccurate, fluctuations in gold price, risks and hazards associated with the business of mineral exploration, development and mining, risks relating to the credit worthiness or financial condition of suppliers, refiners and other parties with whom the Company does business; inadequate insurance, or inability to obtain insurance, to cover these risks and hazards, employee relations; relationships with and claims by local communities and indigenous populations; political risk; risks related to natural disasters, terrorism, civil unrest, public health concerns (including health epidemics or outbreaks of communicable diseases such as the coronavirus (COVID-19)); availability and increasing costs associated with mining inputs and labour; the speculative nature of mineral exploration and development, including the risks of obtaining or maintaining necessary licenses and permits, diminishing quantities or grades of mineral reserves as mining occurs; global financial condition, the actual results of current exploration activities, changes to conclusions of economic evaluations, and changes in project parameters to deal with unanticipated economic or other factors, risks of increased capital and operating costs, environmental, safety or regulatory risks, expropriation, the Company’s title to properties including ownership thereof, increased competition in the mining industry for properties, equipment, qualified personnel and their costs, risks relating to the uncertainty of timing of events including targeted production rate increase and currency fluctuations.  Security holders, potential security holders and other prospective investors are cautioned not to place undue reliance on forward-looking information.  By its nature, forward-looking information involves numerous assumptions, inherent risks and uncertainties, both general and specific, that contribute to the possibility that the predictions, forecasts, projections and various future events will not occur.  Caledonia undertakes no obligation to update publicly or otherwise revise any forward-looking information whether as a result of new information, future events or other such factors which affect this information, except as required by law.

This news release is not an offer of the shares of Caledonia for sale in the United States or elsewhere.  This news release shall not constitute an offer to sell or the solicitation of an offer to buy, nor shall there be any sale of the shares of Caledonia, in any province, state or jurisdiction in which such offer, solicitation or sale would be unlawful prior to registration or qualification under the securities laws of such province, state or jurisdiction.

Condensed Consolidated Statement of Profit of Loss and Other Comprehensive Income
  3 months ended 12 months ended
 ($’000’s)December 31 December 31
  2020 2021  2019 2020 2021 
 Revenue28,128 32,136  75,826 100,002 121,329 
 Royalty(1,408)(1,612) (3,854)(5,007)(6,083)
 Production costs(11,174)(14,178) (36,400)(43,711)(53,126)
 Depreciation(1,171)(2,303) (4,434)(4,628)(8,046)
 Gross profit14,375 14,043  31,138 46,656 54,074 
 Other income29 4  2,274 4,765 46 
 Other expenses(3,488)(1,741) (666)(5,315)(7,136)
 Administrative expenses(2,636)(3,830) (5,637)(7,997)(9,091)
 Net foreign exchange (loss)/gain(389)843  29,661 4,305 1,184 
 Cash-settled share-based payment(236)(51) (689)(1,413)(477)
 Profit on sale of subsidiary- -  5,409 - - 
 Fair value loss on derivative assets(145)(133) (601)(266)(240)
 Results from operating activities7,510 9,135  60,889 40,735 38,360 
 Net finance costs49 (7) (198)(305)(361)
 Profit before tax7,559 9,128  60,691 40,430 37,999 
 Tax expense(3,763)(3,539) (10,290)(15,173)(14,857)
 Profit for the period3,796 5,589  50,401 25,257 23,142 
        
 Other comprehensive income      
 Items that are or may be reclassified to profit or loss      
 Exchange differences on translation of foreign operations973 (382) 49 (173)(531)
 Reversal of foreign exchange currency translation differences on disposal of subsidiary- -  (2,109)- - 
 Total comprehensive income for the period4,769 5,207  48,341 25,084 22,611 
        
 Profit attributable to:      
 Shareholders of the Company2,973 4,222  42,018 20,780 18,405 
 Non-controlling interest823 1,367  8,383 4,477 4,737 
 Profit for the period3,796 5,589  50,401 25,257 23,142 
        
 Total comprehensive income attributable to:      
 Shareholders of the Company3,946 3,840  39,958 20,607 17,874 
 Non-controlling interest823 1,367  8,383 4,477 4,737 
 Total comprehensive income for the period4,769 5,207  48,341 25,084 22,611 
        
 Earnings per share (cents)      
 Basic24.0 33.3  382.0 173.4 148.6 
 Diluted23.9 33.3  381.5 173.2 148.5 
 Adjusted earnings per share (cents)3      
 Basic74.9 42.1  145.1 204.2 225.9 
 Dividends declared per share (cents)10.0 14.0  27.5 33.5 50.0 


Condensed Consolidated Statement of Cash Flows
($’000’s)
  
  12 months ended December 31
   2019 2020 2021 
Cash flows from operating activities     
Cash generated from operations  23,885 37,967 38,703 
Net interest paid  (308)(349)(374)
Tax paid  (5,517)(6,656)(7,426)
Net cash from operating activities  18,060 30,962 30,903 
      
Cash flows used in investing activities     
Acquisition of property, plant and equipment  (20,024)(25,081)(32,112)
Acquisition of exploration and evaluation assets  - (2,759)(5,717)
Realisation (purchase) of gold ETF  - (1,058)1,066 
Proceeds from sale of assets held for sale  - - 500 
Proceeds from disposal of subsidiary  1,000 900 340 
Net cash used in investing activities  (19,024)(27,998)(35,923)
      
Cash flows from financing activities     
Dividends paid  (3,395)(4,542)(8,069)
Term loan repayments  - (574)(361)
Proceeds from gold loan  - - 2,752 
Proceeds from call option  - - 208 
Term loan proceeds (net of transaction cost)  2,294 - - 
Shares issued – equity raise (net of transaction cost)  - 12,538 7,806 
Payment of lease liabilities  (124)(118)(129)
Proceeds from share options exercised  - 30 165 
Net cash (used in)/from financing activities  (1,225)7,334 2,372 
      
Net (decrease)/increase in cash and cash equivalents  (2,189)10,298 (2,648)
Effect of exchange rate fluctuations on cash held  (105)(99)(179)
Net cash and cash equivalents at beginning of the period  11,187 8,893 19,092 
Net cash and cash equivalents at end of the period   8,893 19,092 16,265 



Summarised Consolidated Statements of Financial Position
($’000’s) As atDec 31Dec 31Dec 31
   201920202021
Total non-current assets  113,714133,334157,944
Inventories  11,09216,79820,812
Prepayments  2,3501,9746,930
Trade and other receivables  6,9124,9627,938
Income tax receivable  -76101
Cash and cash equivalents  9,38319,09217,152
Derivative financial assets  1021,184-
Assets held for sale  -500-
Total assets  143,553177,920210,877
Total non-current liabilities  9,4869,91312,633
Loans and borrowings – short term portion  529408-
Lease liabilities – short term portion  11261134
Trade and other payables  8,3488,6649,957
Derivative financial liabilities  --3,095
Income taxes payable  1634951,562
Overdraft  490-887
Cash-settled share-based payments – short term portion  -3362,053
Total liabilities  18,83619,87730,321
Total equity  124,717158,043180,556
Total equity and liabilities  143,553177,920210,877



1 Non-IFRS measures such as "On-mine cost per ounce", "All-in sustaining cost per ounce" and "adjusted EPS" are used throughout this document. Refer to section 10 of the MD&A for a discussion of non-IFRS measures.

2 Refer to technical report entitled "Caledonia Mining Corporation Plc NI 43-101 Mineral Resource Report on the Maligreen Gold Project, Zimbabwe" by Minxcon (Pty) Ltd dated November 2, 2021 and filed on SEDAR on November 5, 2021.

3 Refer to the technical report entitled "Caledonia Mining Corporation Plc NI 43-101 Technical Report on the Blanket Gold Mine, Zimbabwe" dated May 17, 2021 prepared by Minxcon (Pty) Ltd and filed by the Company on SEDAR (www.sedar.com) on May 26, 2021.


FAQ

What were Caledonia Mining's 2021 financial highlights?

Caledonia Mining reported gross revenues of $121 million, gross profit of $54.1 million, and adjusted earnings per share of 226 cents.

How much gold did Caledonia Mining produce in 2021?

Caledonia Mining produced a record 67,476 ounces of gold in 2021.

What is the production guidance for Caledonia Mining in 2022?

The production guidance for 2022 is between 73,000 and 80,000 ounces of gold.

What was the increase in dividends for Caledonia Mining in 2021?

Dividends increased by 49% to 50 cents per share in 2021.

What are the future plans for Caledonia Mining's solar plant?

The solar plant project is expected to be commissioned in June 2022, providing approximately 27% of Blanket Mine's daily electricity demand.

Caledonia Mining Corporation Plc