Banyan Gold Corp (OTCQB: BYAGF) filed a Technical Report supporting its Updated Mineral Resource Estimate for the AurMac Property on June 29, 2022. This report, prepared by qualified professionals, reveals an inferred mineral resource of 3,990,000 ounces of gold, located in three deposits: Airstrip, Powerline, and Aurex Hill. The report is accessible on SEDAR. Additionally, exploration drilling has progressed, with over 26,000 meters completed out of a planned 60,000 meters for 2022.

Positive
  • Inferred mineral resource of 3,990,000 ounces of gold reported.
  • Technical report enhances credibility and transparency for investors.
  • Exploration drilling of over 26,000 meters completed towards a 60,000 meter goal.
Negative
  • Mineral resources are inferred and lack demonstrated economic viability.
  • Uncertainties exist regarding the mineralization continuity and extent.

VANCOUVER, BC / ACCESSWIRE / June 29, 2022 / Banyan Gold Corp. (the "Company" or "Banyan Gold") (TSX-V:BYN) (OTCQB:BYAGF) announces the filing of the Technical Report to support the Updated Mineral Resource Estimate ("Mineral Resource") in accordance with the Canadian Institute of Mining, Metallurgy and Petroleum ("CIM") Definition ‎Standards incorporated by reference in National Instrument 43-101 ("NI 43-101") for the AurMac Property. The AurMac Property is ‎located in the Mayo Mining ‎district, approximately 40 kilometres northeast from the village of Mayo, Yukon and 356 ‎kilometres north of Whitehorse, Yukon (the "AurMac Property"). ‎ The Technical Report was prepared by Marc Jutras, P.Eng., M.A.Sc., Principal, Ginto Consulting Inc., Dino Pilotto, P.Eng. of JDS Energy & Mining Inc. and R. Nick Gow, PhD. of Forte Dynamics. The report has been filed on June 29, 2022 and is available on SEDAR.

As announced on May 17, 2022, the Updated AurMac Mineral Resource comprises a total inferred mineral resource of 3,990,000 ounces of gold (Table 1) on the road accessible AurMac Property.

This pit constrained mineral resource is contained in three near/on-surface deposits: the Airstrip, Powerline and Aurex Hill deposits. The Resource Estimate is summarized below in Table 1

Table 1: Pit-Constrained Inferred Mineral Resources at a 0.2 g/t Au Cut-Off - AurMac Property

Deposit

Au Cut-Off

g/t

Tonnage

M Tonnes

Average Au Grade

g/t

Au Content

k oz.

Airstrip

0.2

42.5

0.64

874

Powerline

0.2

152.0

0.59

2,898

Aurex Hill

0.3

12.5

0.53

215

Total Combined

0.2 - 0.3

207.0

0.60

3,990

Notes to Table 1: ‎

  1. The effective date for the Resource Estimate is May 13, 2022. The updated Resource Estimate for the AurMac Property was prepared by Marc Jutras, P.Eng., M.A.Sc., Principal, Ginto Consulting Inc., an independent Qualified Person in accordance with the requirements of NI 43-101. Please see the news release of May 17, 2022.
  2. Mineral resources which are not mineral reserves do not have demonstrated economic viability. The Resource Estimate may be materially affected by environmental, permitting, legal, title, taxation, sociopolitical, marketing, changes in global gold markets or other relevant issues.
  3. The definitions of inferred mineral resources that are contained in the Definition Standards of the Canadian Institute of Mining, Metallurgy and Petroleum ("CIM Definition ‎Standards"), which are incorporated by reference into National Instrument 43-101, Standards of Disclosure for Mineral Projects ("NI 43-101") were followed to classify the mineral resources in the Resource Estimate. The quantity and grade of reported inferred mineral resources in this estimation are uncertain in nature ‎and there has been insufficient exploration to define these inferred mineral resources as an ‎indicated mineral resource and it is uncertain if further exploration will result in upgrading them to an ‎indicated or measured mineral resource category.
  4. Mineral resources are reported at a cut-off grade of 0.2 g/t Au for the Airstrip and Powerline deposits and 0.3 g/t Au for the Aurex Hill deposits, using a US$/CAN$ exchange rate of 0.75 and constrained within an open-pit shell optimized with the Lerchs-Grossman algorithm to constrain the Mineral Resources with the following estimated parameters: gold price of US$1,700/ounce, US$2.50/t mining cost, US$5.50/t processing cost, US$2.00/t G+A, 80% heap leach recoveries, and 45° pit slope. The gold price and cost assumptions are consistent with current pricing assumptions and costs, and in particular are consistent with those employed for recent technical reports for similar pit-constrained Yukon gold projects.
  5. The number of tonnes was rounded to the nearest hundred thousand. The number of ounces was rounded to the nearest thousand and final result to three significant figures. Any discrepancies in the totals are due to rounding effects.

2022 Exploration Update

Banyan commenced exploration diamond drilling in January 2022 and has now completed over 26,000 metres of drilling for the planned 2022, 60,000 metre program.

Upcoming Events

Banyan Gold will be attending:

  • Precious Metals Summit: Beaver Creek, Colorado, September 13 - 16, 2022
  • New Orleans Investment Conference, New Orleans, Louisiana, October 12 - 15, 2022

All events are subject to change.

About Banyan Gold

Banyan Gold's primary asset, the AurMac Property is comprised of the Aurex and McQuesten properties, as well as claims staked and owned 100% by Banyan Gold, and adjacent to Victoria Gold's Eagle Gold Mine, in Canada's Yukon Territory. The updated resource for the AurMac Property of 3,990,000 ounces (see Table 1 below) was announced on May 17 2022.

The 173 sq km AurMac Property lies 30 kilometres from Victoria Gold's Eagle Project and adjacent to the Keno Hill Silver District operated by Alexco Resource Corp. and is highly prospective for structurally controlled, intrusion related gold-silver mineralization. The property is transected by the main Yukon highway and access road to the Victoria Gold open-pit, heap leach Eagle Gold mine. The AurMac Property benefits from a 3-phase powerline, existing power station and cell phone coverage. Banyan has a right to earn up to a 100% interest, in both the Aurex and McQuesten Properties, subject to certain royalties.

The Updated Mineral Resource Estimate for the AurMac Property was prepared May 13, 2022and consisted of 3,990,000 ‎ounces of gold (see Table 1) hosted within near surface, road accessible pit constrained Mineral Resources contained in three near/on-surface deposits: the Airstrip, Aurex Hill and Powerline Deposits.

Table 1: Pit-Constrained Inferred Mineral Resources at a 0.2 g/t Au Cut-Off - AurMac Property

Deposit

Au Cut-Off

g/t

Tonnage

M Tonnes

Average Au Grade

g/t

Au Content

k oz.

Airstrip

0.2

42.5

0.64

874

Powerline

0.2

152.0

0.59

2,898

Aurex Hill

0.3

12.5

0.53

215

Total Combined

0.2 - 0.3

207.0

0.60

3,990

Notes to Table 1: ‎

  1. The effective date for the Resource Estimate is May 13, 2022. The updated Resource Estimate for the AurMac Property was prepared by Marc Jutras, P.Eng., M.A.Sc., Principal, Ginto Consulting Inc., an independent Qualified Person in accordance with the requirements of NI 43-101. The technical report supporting the Resource Estimate (the "Technical Report") has been filed on SEDAR at www.sedar.com effective June 29, 2022. Please see the news release of May 17, 2022.
  2. Mineral resources which are not mineral reserves do not have demonstrated economic viability. The Resource Estimate may be materially affected by environmental, permitting, legal, title, taxation, sociopolitical, marketing, changes in global gold markets or other relevant issues.
  3. The definitions of inferred mineral resources that are contained in the Definition Standards of the Canadian Institute of Mining, Metallurgy and Petroleum ("CIM Definition ‎Standards"), which are incorporated by reference into National Instrument 43-101, Standards of Disclosure for Mineral Projects ("NI 43-101") were followed to classify the mineral resources in the Resource Estimate. The quantity and grade of reported inferred mineral resources in this estimation are uncertain in nature ‎and there has been insufficient exploration to define these inferred mineral resources as an ‎indicated mineral resource and it is uncertain if further exploration will result in upgrading them to an ‎indicated or measured mineral resource category.
  4. Mineral resources are reported at a cut-off grade of 0.2 g/t Au for the Airstrip and Powerline deposits and 0.3 g/t Au for the Aurex Hill deposits, using a US$/CAN$ exchange rate of 0.75 and constrained within an open-pit shell optimized with the Lerchs-Grossman algorithm to constrain the Mineral Resources with the following estimated parameters: gold price of US$1,700/ounce, US$2.50/t mining cost, US$5.50/t processing cost, US$2.00/t G+A, 80% heap leach recoveries, and 45° pit slope. The gold price and cost assumptions are consistent with current pricing assumptions and costs, and in particular are consistent with those employed for recent technical reports for similar pit-constrained Yukon gold projects.
  5. The number of tonnes was rounded to the nearest hundred thousand. The number of ounces was rounded to the nearest thousand and final result to three significant figures. Any discrepancies in the totals are due to rounding effects.

In addition to the AurMac Property, the Company holds the Hyland Gold Project, located 70 kilometres Northeast of Watson Lake, Yukon, along the Southeast end of the Tintina Gold Belt (the "Hyland Project"). The Hyland Project is a sediment hosted, structurally controlled, intrusion related gold deposit, within a large land package (over 125 sq km), accessible by a network of existing gravel access roads.

Banyan Gold trades on the TSX-Venture Exchange under the symbol "BYN" and is quoted on the OTCQB Venture Market under the symbol "BYAGF". For more information, please visit the corporate website at www.BanyanGold.com or contact the Company.

Qualified Persons

Paul D. Gray, P.Geo., Vice President of Exploration for the Company, is a "qualified person" as ‎defined under NI 43-101, and has reviewed and approved the contents of this new release.‎ Mr. Gray has verified the data disclosed in this news release, including the sampling, ‎‎analytical and test data underlying the information.

ON BEHALF OF BANYAN GOLD CORPORATION

(signed) "Tara Christie"
Tara Christie
President & CEO

For more information, please contact:

Tara Christie • 778 928 0556 • tchristie@banyangold.com
Jasmine Sangria • 604 312 5610 • jsangria@banyangold.com

CAUTIONARY STATEMENT: Neither the TSX Venture Exchange, its Regulation Services Provider (as that term is defined in policies of the TSX Venture Exchange) nor OTCQB Venture Market accepts responsibility for the adequacy or accuracy of this release.

No stock exchange, securities commission or other regulatory authority has approved or disapproved the information contained herein.

FORWARD LOOKING INFORMATION: This news release contains forward-looking information, which is not comprised of historical facts. Such information can generally be identified by the use of forwarding-looking wording such as "may", "will", "expect", "estimate", "anticipate", "intend", "believe", "potential" and "continue" or the negative thereof or similar variations. Forward-looking information involves risks, uncertainties and other factors that could cause actual events, results, performance, prospects and opportunities to differ materially from those expressed or implied by such forward-looking information. Forward looking information in this news release includes, but is not limited to, the Company's plans for drilling this year; and statements regarding exploration expectations, exploration or development plans; and mineral resource estimates. Factors that could cause actual results to differ materially from such forward-looking information include, but are not limited to, uncertainties inherent in resource estimates, continuity and extent of mineralization, capital and operating costs varying significantly from estimates, the preliminary nature of metallurgical test results, delays in obtaining or failures to obtain required governmental, environmental or other project approvals, political risks, uncertainties relating to the availability and costs of financing needed in the future, changes in equity markets, inflation, changes in exchange rates, fluctuations in commodity prices, delays in the development of projects and the other risks involved in the mineral exploration and development industry, enhanced risks inherent to conducting business in any jurisdiction, and those risks set out in Banyan's public documents filed on SEDAR. Although Banyan believes that the assumptions and factors used in preparing the forward-looking information in this news release are reasonable, undue reliance should not be placed on such information, which only applies as of the date of this news release, and no assurance can be given that such events will occur in the disclosed time frames or at all. Banyan disclaims any intention or obligation to update or revise any forward-looking information, whether as a result of new information, future events or otherwise, other than as required by law.

SOURCE: Banyan Gold Corp.



View source version on accesswire.com:
https://www.accesswire.com/706938/Banyan-Gold-Files-Technical-Report-for-Aurmac-Property-4-Million-Ounce-Updated-Mineral-Resource-Estimate-Yukon-Canada

FAQ

What is the updated mineral resource estimate for Banyan Gold Corp's AurMac Property?

The updated mineral resource estimate comprises an inferred resource of 3,990,000 ounces of gold.

When was the technical report for the AurMac Property filed?

The technical report was filed on June 29, 2022.

What significant information does the technical report provide for BYAGF investors?

The technical report provides an inferred mineral resource estimate of 3,990,000 ounces of gold, supporting the potential of the AurMac Property.

What are the key deposits included in the AurMac Property estimate?

The key deposits included are Airstrip, Powerline, and Aurex Hill.

How much exploration drilling has Banyan Gold Corp completed in 2022?

Banyan Gold Corp has completed over 26,000 meters of drilling in 2022.

BANYAN GOLD CORP CL A ORD

OTC:BYAGF

BYAGF Rankings

BYAGF Latest News

BYAGF Stock Data

54.73M
270.50M
17.73%
19.81%
Gold
Basic Materials
Link
United States of America
Vancouver