Blue Lagoon 2023 Phase 1 Drilling Results - DM-23-289 Adds 350 Meters of Strike Length to Boulder Vein
VANCOUVER, BC / ACCESSWIRE / May 10, 2023 / Blue Lagoon Resources Inc. (the "Company") (CSE:BLLG)(FSE:7BL)(OTCQB:BLAGF) is pleased to announce final results from the 2023 Phase I drilling program on its year-round, road accessible, Dome Mountain Gold Project, located a short 50-minute drive from Smithers, British Columbia.
A total of 2909 meters of NQ diamond drilling was completed in ten (10) drill holes during the Phase 1 2023 campaign. Two of the ten holes were abandoned due to technical issues well before target depth and subsequently redrilled (Table 1). The first of these ten holes was focused on undercutting and following up on a significant intersection discovered during the 2022 drill program in drill hole DM-22-273 (see press release January 16, 2023). This intersection consisted of a wide zone of mineralized breccia and quartz-carbonate sulphide veining was intersected grading 5.49 g/t Au, 80.9 g/t Ag and
Follow-up drilling this year set up on the same drill pad as hole DM-22-273 and targeted strike and dip extents at approximately 50 metres centers (Figure 1).
Table 1: Drill hole collar specifications
Hole ID | Location (UTM Zone 9 North) | Total Depth (m) | Orientation | |||
---|---|---|---|---|---|---|
Easting | Northing | Elevation | Azimuth | Dip | ||
DM-23-285 (Abandoned and redrilled as 285A) | 653552 | 6068474 | 1293 | 43.00 | 350 | -58 |
DM-23-285A | 653552 | 6068474 | 1293 | 581.00 | 350 | -58 |
DM-23-286 | 653552 | 6068474 | 1293 | 362.70 | 338 | -46 |
DM-23-287 | 653552 | 6068474 | 1293 | 359.00 | 338 | -59 |
DM-23-288 | 653552 | 6068474 | 1293 | 358.50 | 5 | -47 |
DM-23-289 | 653552 | 6068474 | 1293 | 367.70 | 3 | -57 |
DM-23-290 (Abandoned and redrilled as 290A) | 653552 | 6068474 | 1293 | 61.60 | 13 | -46 |
DM-23-290A | 653552 | 6068474 | 1293 | 316.20 | 16.4 | -46 |
DM-23-291 | 653403 | 6068679 | 1300 | 205.60 | 6 | -50 |
DM-23-292 | 653403 | 6068679 | 1300 | 253.50 | 67 | -45 |
Figure 1
Table 2: Selected significant intersections, Boulder Main, eastern extension
Hole ID | Intersection (m) | Grade | ||||
From | To | Length | Au (g/t) | Ag (g/t) | Cu (%) | |
DM-23-285A | 331.05 | 331.47 | 0.42 | 44.20 | 136.0 | 0.524 |
491.00 | 492.00 | 1.00 | 1.31 | 12.1 | 0.059 | |
503.00 | 511.00 | 8.00 | 1.80 | 8.4 | 0.050 | |
incl | 504.60 | 507.34 | 2.74 | 4.25 | 18.7 | 0.095 |
541.00 | 543.00 | 2.00 | 1.75 | 7.6 | 0.060 | |
546.00 | 548.95 | 2.95 | 2.39 | 10.8 | 0.057 | |
DM-23-286 | 330.00 | 331.00 | 1.00 | 6.02 | 83.7 | 0.380 |
DM-23-287 | 309.55 | 311.10 | 1.55 | 15.20 | 31.4 | 0.147 |
DM-23-288 | 300.51 | 301.50 | 0.99 | 0.95 | 0.8 | 0.010 |
302.54 | 303.77 | 1.23 | 0.97 | 7.4 | 0.033 | |
345.05 | 346.10 | 1.05 | 4.55 | 47.3 | 0.077 | |
DM-23-289 | 339.00 | 340.40 | 1.40 | 10.35 | 38.9 | 0.108 |
Incl | 339.84 | 340.40 | 0.56 | 25.10 | 93.0 | 0.248 |
DM-23-290A | 267.00 | 267.34 | 0.34 | 7.64 | 30.6 | 0.167 |
NOTE: Insufficient information is available to determine true thicknesses.
The down-dip expression of the mineralization in drill hole DM-22-273 appears to be a narrow semi-massive sulphide bearing quartz vein (the Boulder Vein) in drill hole DM-23-285A. Precious metal grades here are 44.20 g/t Au and 136 g/t Ag and
Drilling on strike to the west, drill holes DM-23-286 and DM-23-287 intersected the mineralized Boulder Vein grading 6.02 g/t Au and 83.7 g/t Ag over 1.00 meters and 15.20 g/t Au and 31.4 g/t Ag over 1.55 meters, respectively.
To the east, drill hole DM-23-288 did intersect a zone of veining approximately 56 metres east at a similar depth as in hole DM-22-273, although the breccia was not developed in this location. Gold and silver grades were only weakly anomalous with a best of 1.48 g/t Au and 18.1 g/t Ag over 0.52 metres. Below this, two samples returned strong silver (and copper) values with concentrations of 97.2 g/t Ag (
Drill hole DM-23-291 was planned to test an interpreted area of the Boulder Main vein that was not included in the current vein model. A vein was intersected in historical drill hole D89-05 which graded 6.89 g/t Au and 41.6 g/t Ag within altered host rocks. Additional < 5g/t Au mineralization was selectively sampled within the alteration zone. Sampling of DM-23-291 only returned spotty low grade precious metal values within the expected zone. At depth, a better mineralized vein was encountered returning 3.52 g/t Au and 57.3 g/t Ag over 3.00 meters. It is unclear whether this vein represented the Boulder Footwall vein or may possibly be part of the Boulder East structures.
Though there is insufficient infill drilling at this time, it is reasonable to assume, based on drilling, that the strike length and down-dip extent of the Boulder Vein Resource could be doubled by infill drilling. The current resource (news release Feb 3, 2022) discloses a mineral resource of 45,000 Au and 250,000 Ag in the measured category, 173,000 oz Au and 876,000 oz Ag in the indicated category and 16,000 oz Au and 71,000 oz Ag in the inferred category.
Figure 2 Long section showing existing Boulder Vein Resource (measured and indicated resource blocks) and recent drilling. Black arrows showing strike length and dip depth on the resource and red arrows show length along strike and down dip added by recent drilling. Area in green denotes 2023 Phase 1 drilling.
QUALITY ASSURANCE AND CONTROL
Core selected for sampling was cut in half with a core saw with one half bagged for shipping. Strict chain of custody storing, and shipping protocol was maintained. All core preparation and analyses were completed by Activation Laboratories Ltd. located in Kamloops, BC. Core was crushed, split, and pulverized with 250 grams passing 200 mesh. Each sample was analyzed for gold by fire assay with ICP-OES finish (Act Labs Code 1A2-ICP) and for multi-elements by 4-acid total digestion ICP with OES finish. (Act Labs Code 1F2) Any gold overlimits (>30 ppm Au) were analyzed by gravimetric fire assay (Act Labs Code 1A3). Standards and blanks were inserted by Company staff. The drilling and sampling program was managed and supervised by Company personnel and under the direction of Ted Vanderwart, P.Geo.
The scientific and technical disclosure in this news release was approved by William Cronk, P.Geo, a Qualified Person as defined in NI 43-101 and a consultant to the Company.
For further information, please contact:
Rana Vig
President and Chief Executive Officer
Telephone: 604-218-4766
Email: rana@ranavig.com
The CSE has not reviewed and does not accept responsibility for the adequacy or accuracy of this release.
Statement Regarding Forward-Looking Information: This release includes certain statements that may be deemed "forward-looking statements". All statements in this release, other than statements of historical facts, that address events or developments that Blue Lagoon Resources Inc. (the "Company") expects to occur, are forward-looking statements. Forward-looking statements are statements that are not historical facts and are generally, but not always, identified by the words "expects", "plans", "anticipates", "believes", "intends", "estimates", "projects", "potential" and similar expressions, or that events or conditions "will", "would", "may", "could" or "should" occur. Although the Company believes the expectations expressed in such forward-looking statements are based on reasonable assumptions, such statements are not guarantees of future performance and actual results may differ materially from those in the forward-looking statements. Factors that could cause the actual results to differ materially from those in forward-looking statements include results of exploration activities may not show quality and quantity necessary for further exploration or future exploitation of minerals deposits, volatility of gold and silver prices, and continued availability of capital and financing, permitting and other approvals, and general economic, market or business conditions. Investors are cautioned that any such statements are not guarantees of future performance and actual results or developments may differ materially from those projected in the forward-looking statements. Forward-looking statements are based on the beliefs, estimates and opinions of the Company's management on the date the statements are made. Except as required by applicable securities laws, the Company undertakes no obligation to update these forward-looking statements in the event that management's beliefs, estimates or opinions, or other factors, should change.
SOURCE: Blue Lagoon Resources Inc.
View source version on accesswire.com:
https://www.accesswire.com/753916/Blue-Lagoon-2023-Phase-1-Drilling-Results--DM-23-289-Adds-350-Meters-of-Strike-Length-to-Boulder-Vein