Beam Global Received $500K Order from Dallas County through the Federal GSA Contract Disaster Purchasing Program
Beam Global (Nasdaq: BEEM, BEEMW) has secured a $500,000 order from Dallas County, Texas, for six off-grid EV ARC™ EV charging systems. These systems, procured under the GSA Multiple Award Schedule, enable fast deployment for EV charging and disaster preparedness. Each unit can charge two vehicles simultaneously and can be equipped with emergency power capabilities. Beam's CEO highlighted the increasing demand for energy-resilient charging solutions in light of frequent grid outages, showcasing the company's commitment to sustainable technology in the EV charging space.
- Received a $500,000 order for six off-grid EV ARC™ systems from Dallas County.
- Utilizes GSA contract for simplified procurement and best pricing.
- EV ARC™ systems are designed for disaster preparedness and can charge EVs during grid outages.
- Each system integrates dual chargers and an Emergency Power Panel.
- None.
SAN DIEGO, Jan. 10, 2023 (GLOBE NEWSWIRE) -- Beam Global, (Nasdaq: BEEM, BEEMW), the leading provider of innovative sustainable products and technologies for electric vehicle (EV) charging, energy storage, energy security and outdoor media, announced that it received a
The Beam Global EV ARC™ off-grid EV charging systems qualify as disaster preparedness assets because they continue to charge EVs during grid outages and can be equipped with an emergency power panel for first responder use in emergencies. Each of Dallas County’s EV ARC systems integrates 2 Enel X Way JuiceBox® Pro chargers to charge 2 vehicles simultaneously, and an Emergency Power Panel that can serve first responders with 120V and 240V electric outlets in case of an emergency. Using the GSA contract gave Dallas County federal government best pricing, saving time and money while enabling them to acquire Beam Global’s rapidly deployed EV charging infrastructure products without going through extensive individual contracting processes.
“Energy resiliency must be a key consideration in planning EV charging infrastructure. Fleet managers need access to charging during increasingly frequent grid outages, and Beam’s EV ARC solar-powered systems provide EV charging even during power failures,” said Beam Global CEO Desmond Wheatley. “We are seeing increasing sales from entities that need EV charging faster than traditional construction projects allow and disaster preparedness at all times. EV ARC systems solve for both requirements.”
Solar-powered EV ARC™ electric vehicle charging infrastructure products are rapidly deployed with no digging, no construction and no electrical work. Off-grid and
For more information on purchasing Beam EV ARC™ ready-to-deploy sustainable EV charging solutions at GSA pricing, please contact The Beam Team at 858-799-4583 or BeamTeam@BeamForAll.com.
About Beam Global
Beam Global is a clean technology leader providing innovative, sustainable products and technologies for electric vehicle (EV) charging, energy storage, energy security and outdoor media. Core platforms include Beam EV ARC™ and Solar Tree® sustainable EV charging systems, Beam AllCell™ high-performance energy storage solutions, energy resiliency and disaster preparedness products and a deep patent library.
Beam EV ARC™ EV charging infrastructure systems support any quality brand EV charging service equipment, and Beam AllCell™ battery solutions power micro-mobility, terrestrial EVs, aviation, maritime and recreational vehicles as well as stationery and energy-security platforms.
Beam develops, patents, designs, engineers and manufactures unique and advanced clean mobility solutions that protect the environment, save customers time and money, empower communities and keep people moving. Based in San Diego and Chicago, the company produces Made-in-America products with the mission to Lead the World to Clean Mobility. Beam Global is listed on Nasdaq under the symbols BEEM and BEEMW. For more information visit BeamForAll.com, LinkedIn, YouTube and Twitter.
Forward-Looking Statements
This Beam Global Press Release may contain forward-looking statements. All statements in this Press Release other than statements of historical facts are forward-looking statements. Forward-looking statements are generally accompanied by terms or phrases such as “estimate,” “project,” “predict,” “believe,” “expect,” “anticipate,” “target,” “plan,” “intend,” “seek,” “goal,” “will,” “should,” “may,” or other words and similar expressions that convey the uncertainty of future events or results. These statements relate to future events or future results of operations, including, but not limited to the following statements: statements regarding the proposed acquisition, its expected benefits, the acquisition’s anticipated timing, and the anticipated future financial performance as a result of the acquisition. These statements are only predictions and involve known and unknown risks, uncertainties and other factors, which may cause Beam Global's actual results to be materially different from these forward-looking statements. There can be no assurances that the proposed acquisition of AllCell will be completed. Except to the extent required by law, Beam Global expressly disclaims any obligation to update any forward-looking statements.
Media Contact:
Next PR
+1 813-526-1195
Press@BeamForAll.com
Investor Relations:
Core IR
IR@BeamForAll.com
+1 516-222-2560
FAQ
What recent order did Beam Global secure?
How do Beam Global's EV ARC™ systems support disaster preparedness?
What is the significance of the GSA contract for Beam's order?
What features do the EV ARC™ systems include?