Arizona Sonoran Exploration Drilling Intersects Near Surface Mineralization 2,500 ft (762 m) South of Parks/Salyer
- None.
- None.
Eight of 10 drill holes are now complete within the MainSpring exploration program announced October 30, 2023. Current drilling is testing the near surface extension of mineralization south of the
Drilling Highlights:
-
Identified shallow mineralization at least 2,500 ft (762 m) south of the
Parks /Salyer deposit -
Near surface mineralization begins at ~138 ft (42 m) in 3 of the southern-most drill holes, compared to ~550 ft (166 m) or greater in the
Parks /Salyer deposit -
ECM-190: 433 ft (132 m) @
0.34% CuT,0.31% Cu TSol from 336 ft (102 m) depth (enriched)-
Incl 115 ft (35.1 m) @
0.58% CuT,0.56% Cu TSol -
And 50 ft (15.2 m) @
0.49% CuT,0.48% Cu TSol - Partial hole; assays related to the primary sulphides are pending
-
Incl 115 ft (35.1 m) @
-
ECM-187: 716 ft (218 m) @
0.28% CuT of continuous mineralization from 144.3 ft (44 m) depth-
303.7 ft (92.6 m) @
0.35% CuT,0.32% Cu TSol from 144 ft (44 m) depth (oxide) -
Incl 11.7 ft (3.6 m) @
3.39% CuT,3.29% Cu TSol -
And 20 ft (6.1 m) @
1.01% CuT,1.00% Cu TSol -
124.9 ft (38.1 m) @
0.34% CuT,0.33% Cu TSol (enriched) -
Incl 34 ft (10.4 m) @
0.86% CuT,0.84% Cu TSol
-
303.7 ft (92.6 m) @
- ECM-186: 570 ft (173.7 m) @ 0.19 % CuT of near continuous mineralization from 138 ft (42 m) depth
-
ECM-191: 317.1 ft (96.7 m) @
0.23% CuT,0.23% Cu TSol from 370.4 ft (113 m) depth (enriched)-
Incl 126.6 ft (38.6 m) @
0.35% CuT,0.34% Cu TSol
-
Incl 126.6 ft (38.6 m) @
NOTE: True widths are not known
George Ogilvie, Arizona Sonoran President and CEO commented, “Assay results coming from the MainSpring property reinforces the strength of our Cactus porphyry copper system and the significance of the
MainSpring Property
ASCU signed a Purchase-Sale Agreement to acquire MainSpring’s 523 acres in early 2023 (see February 23, 2023). Situated within the Cactus Project and contiguous to the
Drilling Recap
Eight holes totaling 9,648 feet (2,940.7 m) within the 10-hole drill program (12,550 feet | 3,825.2 m) are now complete at MainSpring. Mineralization at MainSpring is interpreted to be the shallow extension of the
TABLE 1: MainSpring Drilling Significant Intercepts
Hole id |
Zone |
Feet |
Meters |
CuT |
Cu Tsol |
Mo |
||||
from |
to |
length (ft) |
from |
to |
length (m) |
% |
% |
% |
||
ECM-186 |
oxide |
138.0 |
300.0 |
162.0 |
42.1 |
91.4 |
49.4 |
0.17 |
0.10 |
0.001 |
including |
195.0 |
204.8 |
9.8 |
59.4 |
62.4 |
3.0 |
0.97 |
0.91 |
0.000 |
|
oxide |
423.5 |
515.7 |
92.2 |
129.1 |
157.2 |
28.1 |
0.28 |
0.23 |
0.001 |
|
including |
511.0 |
515.7 |
4.7 |
155.8 |
157.2 |
1.4 |
2.50 |
2.28 |
0.001 |
|
enriched |
515.7 |
543.0 |
27.3 |
157.2 |
165.5 |
8.3 |
0.20 |
0.10 |
0.001 |
|
primary |
543.0 |
708.0 |
165.0 |
165.5 |
215.8 |
50.3 |
0.25 |
0.06 |
0.002 |
|
including |
637.0 |
691.0 |
54.0 |
194.2 |
210.6 |
16.5 |
0.44 |
0.12 |
0.006 |
|
ECM-187 |
oxide |
144.3 |
448 |
303.7 |
44.0 |
136.6 |
92.6 |
0.35 |
0.32 |
0.002 |
including |
179.3 |
191.0 |
11.7 |
54.7 |
58.2 |
3.6 |
3.39 |
3.29 |
0.002 |
|
and |
246.0 |
266.0 |
20.0 |
75.0 |
81.1 |
6.1 |
1.01 |
1.00 |
0.001 |
|
enriched |
468.0 |
592.9 |
124.9 |
142.6 |
180.7 |
38.1 |
0.34 |
0.33 |
0.001 |
|
including |
506.0 |
540.0 |
34.0 |
154.2 |
164.6 |
10.4 |
0.86 |
0.84 |
0.001 |
|
primary |
592.9 |
931.0 |
338.1 |
180.7 |
283.8 |
103.1 |
0.14 |
0.04 |
0.001 |
|
including |
688.0 |
720.0 |
32.0 |
209.7 |
219.5 |
9.8 |
0.38 |
0.04 |
0.001 |
|
and |
778.0 |
811.0 |
33.0 |
237.1 |
247.2 |
10.1 |
0.28 |
0.08 |
0.001 |
|
ECM-190 |
oxide |
139.8 |
158.5 |
18.7 |
42.6 |
48.3 |
5.7 |
0.70 |
0.67 |
0.001 |
enriched |
336.0 |
769.0 |
433.0 |
102.4 |
234.4 |
132.0 |
0.34 |
0.31 |
0.001 |
|
including |
336.0 |
451.0 |
115.0 |
102.4 |
137.5 |
35.1 |
0.58 |
0.56 |
0.001 |
|
and |
480.0 |
530.0 |
50.0 |
146.3 |
161.5 |
15.2 |
0.49 |
0.48 |
0.001 |
|
Primary sulphide assays pending from 769 ft to 1233.4 ft (EOH) |
||||||||||
ECM-191 |
oxide |
234.0 |
248.0 |
14.0 |
71.3 |
75.6 |
4.3 |
0.17 |
0.12 |
0.001 |
enriched |
370.4 |
687.5 |
317.1 |
112.9 |
209.6 |
96.7 |
0.23 |
0.23 |
0.002 |
|
including |
370.4 |
497.0 |
126.6 |
112.9 |
151.5 |
38.6 |
0.35 |
0.34 |
0.002 |
|
enriched |
879.2 |
909.0 |
29.8 |
268.0 |
277.1 |
9.1 |
0.12 |
0.11 |
0.001 |
|
enriched |
1017.5 |
1,104.6 |
87.1 |
310.1 |
336.6 |
26.5 |
0.10 |
0.02 |
0.001 |
|
primary |
1104.6 |
1,399.8 |
295.2 |
336.6 |
426.6 |
90.0 |
0.05 |
0.01 |
0.001 |
- Intervals are presented in core length and are drilled with vertical, or steep dip angles.
-
Drill assays assume a mineralized cut-off grade of
0.1% CuT reflecting the potential for heap leaching of openpit material in the case of Oxide and Enriched or in the case of Primary material to provide typical average grades. Holes were terminated below the basement fault. - Assay results are not capped. Intercepts are aggregated within geological confines of major mineral zones.
- True widths are not known.
Table 2: Drilling details
Hole |
Easting (m) |
Northing (m) |
Elevation (ft) |
TD (ft) |
Azimuth |
Dip |
ECM-186 |
422152.0 |
3644036.0 |
1360.0 |
945.0 |
0.0 |
-90.0 |
ECM-187 |
421996.0 |
3644189.0 |
1360.0 |
1024.6 |
0.0 |
-90.0 |
ECM-190 |
421842.9 |
3644341.2 |
1360.0 |
1233.4 |
0.0 |
-90.0 |
ECM-191 |
421764.0 |
3644419.0 |
1360.0 |
1454.5 |
0.0 |
-90.0 |
Note: Drill locations are based on drill plans and hand-held GPS locators and may be adjusted slightly when properly surveyed.
Quality Assurance / Quality Control
Drilling completed on the project between 2020 and 2023 was supervised by on-site ASCU personnel who prepared core samples for assay and implemented a full QA/QC program using blanks, standards, and duplicates to monitor analytical accuracy and precision. The samples were sealed on site and shipped to Skyline Laboratories in
Technical aspects of this news release have been reviewed and verified by Allan Schappert – CPG #11758, who is a qualified person as defined by National Instrument 43-101– Standards of Disclosure for Mineral Projects.
Links from the Press Release
February 23, 2023: https://arizonasonoran.com/news-releases/arizona-sonoran-purchases-contiguous-mainspring-property-providing-additional-planning-flexibility-for-the_pfs/
Figures 1-9: https://arizonasonoran.com/projects/cactus-mine-project/press-release-images/
Neither the TSX nor the regulating authority has approved or disproved the information contained in this press release.
About Arizona Sonoran Copper Company (www.arizonasonoran.com | www.cactusmine.com)
ASCU’s objective is to become a mid-tier copper producer with low operating costs and to develop the Cactus and
Forward-Looking Statements
Forward-looking statements involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of ASCU to be materially different from any future results, performance or achievements expressed or implied by the forward-looking statements. Factors that could affect the outcome include, among others: future prices and the supply of metals; the results of drilling; inability to raise the money necessary to incur the expenditures required to retain and advance the properties; environmental liabilities (known and unknown); general business, economic, competitive, political and social uncertainties; results of exploration programs; accidents, labour disputes and other risks of the mining industry; political instability, terrorism, insurrection or war; or delays in obtaining governmental approvals, projected cash operating costs, failure to obtain regulatory or shareholder approvals.
Although ASCU has attempted to identify important factors that could cause actual actions, events or results to differ materially from those described in forward-looking statements, there may be other factors that cause actions, events or results to differ from those anticipated, estimated or intended. Forward-looking statements contained herein are made as of the date of this news release and ASCU disclaims any obligation to update any forward-looking statements, whether as a result of new information, future events or results or otherwise, except as required by applicable securities laws.
View source version on businesswire.com: https://www.businesswire.com/news/home/20231120165509/en/
Alison Dwoskin, Director, Investor Relations
647-233-4348
adwoskin@arizonasonoran.com
George Ogilvie, President, CEO and Director
416-723-0458
gogilvie@arizonasonoran.com
Source: Arizona Sonoran Copper Company Inc.
FAQ
What are the recent drilling results at the MainSpring property by Arizona Sonoran Copper Company Inc.?
Where is the MainSpring property located?
What are the future exploration plans for Arizona Sonoran Copper Company Inc.?