STOCK TITAN

Upcoming RS-25 Engine Test Series Will Demonstrate Lower Cost Rocket Engine Components for NASA’s Artemis Program

Rhea-AI Impact
(Neutral)
Rhea-AI Sentiment
(Neutral)
Tags
Rhea-AI Summary

Aerojet Rocketdyne is set to commence the Retrofit-2 test series at NASA's Stennis Space Center, starting January 28, 2021, to validate new components for the RS-25 engine. This series involves seven hot-fire tests lasting up to 500 seconds each, expected to conclude by June. The new hardware aims to reduce RS-25 costs by 30% through advanced design and manufacturing technologies. Key components include a HIP-bonded combustion chamber and additively manufactured Pogo assembly, enhancing efficiency and reliability in production.

Positive
  • 30% cost reduction in RS-25 engine production.
  • Advanced design techniques like Hot Isostatic Pressing (HIP) and additive manufacturing to improve efficiency.
  • Seven hot-fire tests lasting up to 500 seconds to validate engine components.
Negative
  • None.

STENNIS SPACE CENTER, Miss., Jan. 27, 2021 (GLOBE NEWSWIRE) -- Aerojet Rocketdyne and NASA are gearing up for a new phase of RS-25 hot-fire testing that will validate new components for the engine, which powers the core stage of the agency’s Space Launch System super heavy-lift exploration rocket.

The Retrofit-2 test series, consisting of seven tests at NASA’s Stennis Space Center, is expected to begin Jan. 28 and run through June. Each hot-fire test will last up to 500 seconds on the A1 Test Stand.

“This new hardware will significantly reduce the cost of the RS-25 rocket engine by leveraging important advances in design, materials and manufacturing technology,” said Eileen P. Drake, Aerojet Rocketdyne CEO and president.

Aerojet Rocketdyne is under contract to build 24 new engines, and the components being validated in this test series will be introduced in this production set. This new configuration will result in a 30% cost reduction in the RS-25 engine from the version that flew on the Space Shuttle.

Some of the components being demonstrated in the Retrofit-2 series were featured on the previous Retrofit-1B test campaign. These include a combustion chamber built using a high-tech brazing technique called Hot Isostatic Pressing (HIP), and an additively manufactured Pogo Accumulator Assembly, a beach ball-sized component that damps out liquid oxygen system pressure oscillations.

This test series will put a second HIP-bonded main combustion chamber through a comprehensive series of tests. Aerojet Rocketdyne chose a HIP-bonded design because it eliminates difficult and time consuming plating processes, reduces welding defects and costly rework. Development and certification models of the HIP-bonded combustion chamber have been completed and six production units are being assembled at Aerojet Rocketdyne.

The Retrofit-2 series will also continue to test the same Pogo hardware that was previously tested to further verify its durability. The additively manufactured Pogo assembly has already been tested 13 times, accumulating 5,400 seconds of total firing time. The additively manufactured Pogo design eliminates more than 20 parts, more than 100 welds and reduces fabrication time by more than 50%.

Retrofit-2 also will test two RS-25 high pressure fuel and oxidizer turbopumps built from simplified designs using modern techniques as well as 3D printed valves and redesigned actuators.

About Aerojet Rocketdyne: Aerojet Rocketdyne, a subsidiary of Aerojet Rocketdyne Holdings, Inc. (NYSE:AJRD), is a world-recognized aerospace and defense leader that provides propulsion systems and energetics to the space, missile defense and strategic systems, and tactical systems areas, in support of domestic and international customers. For more information, visit www.Rocket.com and www.AerojetRocketdyne.com. Follow Aerojet Rocketdyne and CEO Eileen Drake on Twitter at @AerojetRdyne and @DrakeEileen.

Media Contacts:
Mary Engola, Aerojet Rocketdyne, 571-289-1371
Mary.Engola@rocket.com 
Todd McConnell, Aerojet Rocketdyne, 561-882-5395
Todd.McConnell@rocket.com 


FAQ

What is the purpose of Aerojet Rocketdyne's Retrofit-2 test series?

The Retrofit-2 test series aims to validate new components for the RS-25 engine, which powers NASA's Space Launch System.

When does the Retrofit-2 test series start and end?

The Retrofit-2 test series starts on January 28, 2021, and is expected to run through June 2021.

What cost reduction is Aerojet Rocketdyne targeting with the RS-25 engine?

Aerojet Rocketdyne aims for a 30% cost reduction in the RS-25 engine compared to the version used on the Space Shuttle.

What technologies are being utilized in the RS-25 engine testing?

The tests will use advanced design and manufacturing technologies including Hot Isostatic Pressing (HIP) and additive manufacturing.

How many hot-fire tests are included in the Retrofit-2 series?

The Retrofit-2 series consists of seven hot-fire tests.

Aerojet Rocketdyne Holdings, In

NYSE:AJRD

AJRD Rankings

AJRD Latest News

AJRD Stock Data

4.68B
79.10M
Guided Missile and Space Vehicle Manufacturing
Manufacturing
Link
US
Rancho Cordova