Western Sierra Resource Corporation Announces a $1.976 Billion Federally Funded Mitigation Agreement Executed September 17, 2022, by The Company's Wholly Owned Subsidiary, Mitigation Solutions, LLC
Western Sierra Resource Corporation (OTC PINK:WSRC) announced a significant project on September 17, 2022, through its subsidiary, Mitigation Solutions, LLC (MSL). The company secured a $1.976 billion agreement with the Santa Maria Valley Water Conservation District for the mitigation of the Twitchell Dam and Reservoir.
Projected to last 7-10 years, this project is estimated to generate $200 million annually, bolstering the company’s ability to fund other initiatives without incurring debt or dilution.
- Secured a $1.976 billion agreement for a major mitigation project lasting 7-10 years.
- Estimated average annual gross revenue of $200 million enhances funding capabilities for other projects.
- MSL has obtained a $150 million line of credit and $40 million in equipment financing.
- None.
STEAMBOAT SPRINGS, CO / ACCESSWIRE / September 28, 2022 / WESTERN SIERRA RESOURCE CORPORATION (OTC PINK:WSRC) announces that its wholly owned subsidiary, Mitigation Solutions, LLC (MSL) signed, on September 17, 2022, an Agreement with the Santa Maria Valley Water Conservation District (SMVWCD) in Santa Barbara County, CA for the mitigation of Twitchell Dam and Reservoir. The Agreement has a value of
MSL will secure funding for SMVWCD from Infrastructure Investment and Jobs Act, The Inflation Reduction Act and the 2022 Omnibus Appropriations Bill through various Federal and State agencies, primarily the Federal Emergency Management Agency (FEMA), United States department of Agriculture (USDA), and the U.S. Department of Transportation (USDEOT). Additional financial participation by other Federal Agencies is anticipated. MSL has secured a
Along with Dam stabilization and removal of sediment from the Reservoir basin, the scope of the project encompasses mitigation of influent-contaminated sediments, water contamination, and preemptively addresses the deposit of eroding soils from upstream drainages to mitigate future adverse effects for the Reservoir and damage to the Dam that sustains it. Global Clean Water, Inc. (GCW) has contracted with both WSRC and MSL to address functions in each of the four (or more) phases of the Twitchell project which is expected to require 7-10 years to complete.
The Twitchell Dam and Reservoir site is the first of several California locations where these contract services may be performed by MSL. Two additional projects are currently in queue.
MSL's Principals have joined WSRC's management team and bring with them a combined 200 years of disaster response/relief, mitigation, and restoration experience to the Company. This experience specifically includes, but is not limited to, natural disaster damage assessment, response, and recovery activities; flood-contaminated waterway restoration; mitigation of factors compromising lake, reservoir, and municipal water storage facility integrity; and failed water delivery system reconstruction. Global Clean Water, Inc., with its specialized protocols for mitigating contamination in potable water supplies, will be integral to these and other project requirements.
Photographic records, video, and written documentation will be made available throughout the term of the Twitchell project (and as specific on-site objectives are attained) for the benefit of the Santa Maria Valley Water Conservation District, its residents, and the Company's shareholders.
About Western Sierra Resource Corporation:
Founded in 1907, Western Sierra Resource Corporation (a Utah corporation), has a 115-year history as gold and silver mining company with projects in Arizona, Nevada, California, and Mexico. WSRC currently owns six precious metal reserves in Arizona. In 2014 the Company broadened its vision to include natural (and renewable) resources with its acquisition of water rights and associated infrastructure assets in Colorado for purposes of irrigating and cultivating industrial hemp; processing hemp for manufacture of various building products; and for construction of affordable homes utilizing hemp-based materials-among other beneficial uses. WSRC's intent is to become a broad-based resource company with high value, income generating assets that include water conservation projects, real estate, agriculture, precious metals, helium, and associated "green" technologies.
Forward Looking Statements:
This release includes "forward-looking statements" within the meaning of Section 27A of the Securities Act of 1933, as amended, and Section 21E of the Securities Exchange Act of 1934. Such statements include any that may predict, forecast, indicate, or imply future results, performance. or achievements, and may contain the words "estimate", "project", "intend", "forecast", "anticipate", "plan", "planning", "expect", "believe", "likely", "should", "could", "would", "may" or similar words or expressions. Such statements are not guarantees of future performance and are subject to risks and uncertainties that could cause the company's actual results and financial position to differ materially from those in such statements, which involve risks and uncertainties, including those relating to the Company's ability to grow. Actual results may differ materially from those predicted and any reported should not be considered an indication of future performance. Potential risks and uncertainties include the Company's operating history and resources, together with all usual and common economic, competitive, and equity market conditions / risks.
CONTACT:
Western Sierra Resource Corporation
westernsierraresource.com
ir@westernsierraresource.com
Twitter | Facebook | LinkedIn | Telegram
@WSRCorp
SOURCE: Western Sierra Resource Corp.
View source version on accesswire.com:
https://www.accesswire.com/717780/Western-Sierra-Resource-Corporation-Announces-a-1976-Billion-Federally-Funded-Mitigation-Agreement-Executed-September-17-2022-by-The-Companys-Wholly-Owned-Subsidiary-Mitigation-Solutions-LLC
FAQ
What is the value of the contract secured by WSRC?
How long will the project for the Twitchell Dam last?
What is the projected annual revenue from the Twitchell Dam project?
Who is funding the Twitchell Dam project?