STOCK TITAN

Velocity Announces Commencement of Phase II Drilling at Iglika Property, Bulgaria

Rhea-AI Impact
(Neutral)
Rhea-AI Sentiment
(Neutral)
Rhea-AI Summary
Velocity Minerals Ltd. (TSXV: VLC) (OTCQB: VLCJF) announces the restart of drilling at the Iglika copper-gold property in southeast Bulgaria, fully funded by Dundee Precious Metals Inc. The phase II drill program plans approximately 7,000m of drilling in 13 holes, with a focus on testing geochemical and geophysical targets to identify copper porphyry, copper skarn, and epithermal gold deposits.
Positive
  • None.
Negative
  • None.

Vancouver, British Columbia--(Newsfile Corp. - November 14, 2023) - Velocity Minerals Ltd. (TSXV: VLC) (OTCQB: VLCJF) ("Velocity" or the "Company") announces that drilling has restarted at the Iglika copper-gold property ("Iglika" or the "Property"), located in southeast Bulgaria. The drill program is fully funded by Dundee Precious Metals Inc. ("DPM").

Phase II Drilling Highlights

The phase II drill program is planned at approximately 7,000m of drilling in 13 drill holes (Figure 1), with 2,500m planned to be completed by year end and the remainder in Q1 2024. The drilling campaign is simultaneously focused on testing geochemical and geophysical targets as well as establishing geological stratigraphy on the property, with drill holes planned to reach a maximum depth of 1,000m. Drilling completed in August 2023 totaled 3,275m, which together with the current Phase II will total approximately 10,075m.

Holistic Exploration Approach

The property has potential for multiple mineral deposit types including copper porphyry, copper skarn, and epithermal gold. Surface exploration completed at the Property to date includes approximately 610 rock samples, 2,750 soil samples, 2,300 multi-horizon soil samples, 600-line km of magnetic data, 110-line km of induced polarization, and 15,000 radiometric measurements. This work, together with extensive mapping and prospecting, has identified multiple target areas for drill testing.

Quality Assurance / Quality Control

The work programs in Bulgaria are designed and supervised by Daniel Marinov, MAIG RPGeo, the Company's Vice President Operations who is responsible for all aspects of the work, including the quality control/quality assurance program. On-site personnel at the project rigorously collect and track samples which are then security sealed and shipped to ALS Global laboratory in Romania (soil samples) or SGS Mineral Services laboratory in Bor, Serbia (drill core), for sample preparation and subsequent analysis. Drill core samples are prepared and analyzed by fire assay using a 30-gram charge and multi-element analysis with four acid digestion using an Inductively Coupled Mass Spectrometer in compliance with industry standards at SGS Mineral Services laboratory. Soil samples are prepared in compliance with industry standards at ALS' Romanian laboratory then a sample split of the milled material (pulp) is shipped to ALS' Irish laboratory for Trace Detection Limit method for a gold plus multi-element package by aqua regia digestion for acid extractable gold - 25g. Field duplicate samples, blanks and independent controlled reference material (standards) are added to every batch. Geophysical surveys are carried out by geophysical consultants using up-to-date technologies, with the results checked by a third-party independent geophysicist for quality control. Raw geophysical data is processed and corrected, and the results are interpreted by 2 independent groups of geophysicists under the direction of Company staff.

Cannot view this image? Visit: https://images.newsfilecorp.com/files/4368/187302_c73da07534b55bb6_002.jpg

Figure 1. Geology map of the Iglika Property showing location of completed and planned drill holes.

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/4368/187302_c73da07534b55bb6_002full.jpg

Qualified Person

The technical content of this release has been approved for disclosure by Daniel Marinov, RPGeo, a Qualified Person as defined by NI 43-101 and the Company's Vice President Operations. Mr. Marinov is not independent of the Company as he is a director, officer, shareholder, and holds incentive stock options.

About Velocity Minerals Ltd.

Velocity is a precious metals and copper explorer focused in Eastern Europe. In Bulgaria, Velocity has a 70% interest in the Tintyava property, which includes the prefeasibility-stage Rozino deposit. Velocity also has a 70% interest in the Momchil property (which includes the Obichnik project), a 70% interest in the Nadezhda property (which includes the Makedontsi project), and a 70% interest in the Dangovo property (which is contiguous with the Makedontsi project). The Company holds a 100% interest in the Iglika copper-gold exploration property and recently entered into an option agreement with DPM who have an option to earn a 75% interest in the property. The Company has also entered into agreements to acquire a 75% interest in the Zlatusha and Kalabak copper-gold exploration properties.

On Behalf of the Board of Directors

"Keith Henderson"
President & CEO

For further information, please contact:

Keith Henderson
Phone: +1-604-484-1233
E-mail: info@velocityminerals.com
Web: www.velocityminerals.com

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

This news release contains forward-looking statements and forward-looking information (collectively, "forward-looking statements") within the meaning of applicable Canadian and U.S. securities legislation. All statements, other than statements of historical fact, included herein including, without limitation, statements regarding the exercise of the Option by DPM, the entering into of the Definitive Agreement, the formation of the JV, and the anticipated business plans and timing of future activities of the Company, are forward-looking statements. Although the Company believes that such statements are reasonable, it can give no assurance that such expectations will prove to be correct. Often, but not always, forward looking information can be identified by words such as "pro forma", "plans", "expects", "may", "will", "should", "budget", "scheduled", "estimates", "forecasts", "intends", "anticipates", "believes", "potential" or variations of such words including negative variations thereof, and phrases that refer to certain actions, events or results that may, could, would, might or will occur or be taken or achieved. In making the forward-looking statements in this news release, the Company has applied several material assumptions, including without limitation, that market fundamentals will result in sustained precious metals demand and prices, the receipt of any necessary permits, licenses and regulatory approvals in connection with the future development of the Property in a timely manner, the availability of financing on suitable terms for the development, construction and continued operation of the Property, and the Company's ability to comply with environmental, health and safety laws.

Forward-Looking statements involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of the Company to differ materially from any future results, performance or achievements expressed or implied by the forward-looking information. Such risks and other factors include, among others, operating and technical difficulties in connection with mineral exploration and development and mine development activities at the Property, estimation or realization of mineral reserves and mineral resources, requirements for additional capital, future prices of precious metals and copper, changes in general economic conditions, changes in the financial markets and in the demand and market price for commodities, possible variations in ore grade or recovery rates, possible failures of plants, equipment or processes to operate as anticipated, accidents, labour disputes and other risks of the mining industry, delays or the inability of the Company to obtain any necessary permits, consents or authorizations required, including TSX Venture Exchange acceptance, financing or other planned activities, changes in laws, regulations and policies affecting mining operations, currency fluctuations, title disputes or claims limitations on insurance coverage and the timing and possible outcome of pending litigation, environmental issues and liabilities, risks relating to epidemics or pandemics such as COVID-19, including the impact of COVID-19 on the Company's business, risks related to joint venture operations, and risks related to the integration of acquisitions, as well as those factors discussed under the heading "Risk Factors" in the Company's latest Management Discussion and Analysis and other filings of the Company with the Canadian Securities Authorities, copies of which can be found under the Company's profile on the SEDAR website at www.sedarplus.ca.

Readers are cautioned not to place undue reliance on forward-looking statements. Except as otherwise required by law, the Company undertakes no obligation to update any of the forward-looking information in this news release or incorporated by reference herein.

- 30 -

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/187302

FAQ

What is the purpose of the phase II drill program at the Iglika property?

The phase II drill program aims to conduct approximately 7,000m of drilling in 13 holes to test geochemical and geophysical targets for identifying copper porphyry, copper skarn, and epithermal gold deposits.

Who is funding the drill program at the Iglika property?

The drill program is fully funded by Dundee Precious Metals Inc. (DPM).

What are the types of mineral deposits the Iglika property has the potential for?

The property has potential for copper porphyry, copper skarn, and epithermal gold deposits.

Who is responsible for the work programs in Bulgaria and the quality control/quality assurance program?

The work programs and quality control/quality assurance program in Bulgaria are designed and supervised by Daniel Marinov, the Company's Vice President Operations.

VELOCITY MINERALS LTD ORD

OTC:VLCJF

VLCJF Rankings

VLCJF Latest News

VLCJF Stock Data

23.77M
93.41M
52.32%
Gold
Basic Materials
Link
United States of America
Vancouver