STOCK TITAN

Vital Battery Metals Announces 2024 Exploration & Drilling Program on its Sting Copper Project

Rhea-AI Impact
(Neutral)
Rhea-AI Sentiment
(Neutral)
Tags
Vital Battery Metals announces its 2024 Exploration & Drilling Program on the Sting Copper Project in Newfoundland. The Company plans comprehensive work programs targeting potential copper and gold mineralization. The program includes mapping, sampling, IP surveys, and drilling in the fall of 2024. Historical data and recent acquisitions indicate the project's potential for mineralization. The Company aims to define mineralization scope and unlock the project's full potential.
Vital Battery Metals annuncia il suo Programma di Esplorazione e Perforazione 2024 per il Progetto Sting Copper a Terranova. La società prevede programmi di lavoro completi focalizzati sulla potenziale mineralizzazione di rame e oro. Il programma include mappature, campionamenti, indagini IP e perforazioni nell'autunno del 2024. I dati storici e le recenti acquisizioni indicano il potenziale del progetto per la mineralizzazione. L'obiettivo della società è definire l'ambito della mineralizzazione e sfruttare a pieno il potenziale del progetto.
Vital Battery Metals anuncia su Programa de Exploración y Perforación 2024 para el Proyecto Sting Copper en Terranova. La compañía planea programas de trabajo exhaustivos orientados a la potencial mineralización de cobre y oro. El programa incluye mapeo, muestreo, estudios IP y perforaciones en el otoño de 2024. Los datos históricos y las recientes adquisiciones indican el potencial de mineralización del proyecto. La compañía busca definir el alcance de la mineralización y desbloquear el potencial completo del proyecto.
Vital Battery Metals는 뉴펀들랜드의 Sting Copper 프로젝트에서 2024년 탐사 및 드릴링 프로그램을 발표합니다. 회사는 구리와 금의 잠재적 광물화를 대상으로 하는 포괄적인 작업 프로그램을 계획하고 있습니다. 프로그램은 매핑, 샘플링, IP 조사 및 2024년 가을에 드릴링을 포함합니다. 역사적 데이터와 최근 인수는 프로젝트의 광물화 잠재력을 나타냅니다. 회사는 광물화 범위를 정의하고 프로젝트의 전체 잠재력을 실현하고자 합니다.
Vital Battery Metals annonce son Programme d'Exploration et de Forage 2024 pour le Projet Sting Copper à Terre-Neuve. La société prévoit des programmes de travail complets ciblant la potentielle minéralisation en cuivre et or. Le programme comprend la cartographie, l'échantillonnage, les enquêtes IP et le forage à l'automne 2024. Les données historiques et les acquisitions récentes indiquent le potentiel de minéralisation du projet. La société vise à définir l'étendue de la minéralisation et à libérer le plein potentiel du projet.
Vital Battery Metals kündigt sein Exploration- und Bohrprogramm 2024 für das Sting Copper Projekt in Neufundland an. Das Unternehmen plant umfassende Arbeitsprogramme, die auf potenzielle Kupfer- und Goldmineralisierung abzielen. Das Programm umfasst Kartierung, Probenahme, IP-Untersuchungen und Bohrungen im Herbst 2024. Historische Daten und jüngste Erwerbungen deuten auf das Mineralisierungspotenzial des Projekts hin. Das Unternehmen strebt danach, den Umfang der Mineralisierung zu definieren und das volle Potenzial des Projekts zu erschließen.
Positive
  • None.
Negative
  • None.

VANCOUVER, British Columbia, April 23, 2024 (GLOBE NEWSWIRE) -- Vital Battery Metals Inc. (“Vital” or the “Company”) (CSE: VBAM | OTC: VBAMF | FRA: C0O), is pleased to announce upcoming comprehensive summer Work Programs (the “Programs”) at the Company’s Sting Copper Project (“Project” or “Sting”) located in western Newfoundland. Vital holds a commanding 123 km2 land package within 7 claim blocks located north of the Bay of Islands which contain northerly extensions of the lithologic units host to the past producing York Harbour Mine (recent drilling of up to 5.25% Cu over 29m, York Harbour Metals news release March 26, 2022) found southwards from the Property (Figure 1, readers are cautioned that mineralization hosted on nearby properties is not necessarily indicative of mineralization hosted on Vital’s claim block)*.

The exploration programs will be led by Dahrouge Geological Consulting Ltd. (“Dahrouge”). In preparation for the spring/summer 2024 field exploration programs at Sting, Dahrouge has reviewed historical and recently acquired exploration data, which have indicated that the rocks within the Property have the potential to contain both copper and gold mineralization as Cyprus-type Cu-Zn (+/- Au, Ag) VMS deposits as well as structurally controlled Cu and Au mineralization.

The 2024 field exploration will target three prospective Areas within two claim blocks (Jumbo-Lode and North Sting; Figure 2). A first phase of exploration will include mapping and sampling over both claim blocks as well as an IP survey at Jumbo-Lode. Following receipt and interpretation of results from the first phase a follow-up drilling program is targeted for the fall of 2024 at Jumbo-Lode.

Highlights of the proposed 2024 work program include:

Jumbo-Lode Claim Block

  • Follow-up soil sampling and prospecting, close to the historical, previously channel sampled, Jumbo (9.0% Cu across 9.1m), Red Lode (2.5% Cu across 1.8m) (Assessment File 012G/08/0002), and Friar Tuck (3.7 g/t Au over 0.9 m, Assessment File 012G/08/0078) showings will confirm mineralized trends and highlight targets for future drilling (Areas 1 and 2, Fig. 2).
  • The Lode 9 copper occurrence has also been channel sampled (6.1% Cu across 2.8m, Assessment File 012G/08/0078) and is located <250m to the north of the Jumbo-Lode Claim Block (readers are cautioned that mineralization hosted on adjacent properties is not necessarily indicative of mineralization hosted on Vital’s claim block).
  • An IP survey in the southwest and northeast corners of the claim block will focus on areas with anomalous Cu and Au soil samples results and further aid in drill targeting (Fig. 3).
  • As previously reported (company news release, October 26, 2023), outcrop samples with quartz veining downslope of the Red Lode showing returned up to 9.51 g/t Au and up to 2.53% Cu .These outcrops will be channel sampled and re-examined to aid in drill targeting.

North Sting Claim Block

  • The North Sting Claim Block hosts the northerly extension of the prospective mineralized trend within the Jumbo-Lode Claim Block. The company considers this area to be underexplored and prospective for further discoveries.
  • Additional soil geochemical surveys and prospecting will be completed in this area (Fig. 4). A VTEM survey will be flown over this claim block to define prospective areas for more detailed targeting.

Figure 1: Sting Copper Project Location Map

Figure 1: Sting Copper Project Location Map

Drill Program

It is anticipated that the company will complete a fall 2024 drill program, pending receipt of drill permits at the Jumbo-Lode Claim Block and after data from the 2024 surface exploration program has been received.

  • Drilling at the Jumbo-Lode Claim Block will test the subsurface extent of multiple targets, including historic showings, soil anomalies, and mineralized outcrops.
  • Previous drilling results obtained outside of the Sting Property include (a) 2.12% Cu across 7.2m (DDH GR-91-2), immediately adjacent to the Lode 9 mineral occurrence (Assessment file 012G/08/0098) and (b) 1.19g/t Au, 10.2g/t Ag, 1.05% Zn, and 0.78% Cu over 8.29 m (DDH GGR-06-04) near the boundary of Sting Group Claims) to the northeast of Red Lode in 2006 (Assessment file 012G/08/0127, readers are cautioned that mineralization hosted on adjacent properties is not necessarily indicative of mineralization hosted on Vital’s claim block). The Drilling Program will test for extensions of these mineralized zones within the Sting Property.

Figure 2: Sting Copper Project Areas of Planned Work 

Figure 2: Sting Copper Project Areas of Planned Work

Figure 3: Jumbo-Lode Claim Block Planned Work and Historical Soil Sample Results

Figure 3: Jumbo-Lode Claim Block Planned Work and Historical Soil Sample Results

Figure 4: North Sting Planned Soil Sampling

Figure 4: North Sting Planned Soil Sampling

Adrian Lamoureux, Vital’s Chief Executive Officer and President, comments, “The upcoming exploration programs represent the next step in advancing the Sting Project and to build upon the favorable results obtained in 2023. The Work Programs present us with an opportunity to define the scope of mineralization at the project and continue unlocking its full potential.

Historical and recently acquired field data both support mineralized zones in the Jumbo-Lode Claim Block having northerly trends and moderate to steep westerly dips. Field teams will work within the Project to confirm these observations. Future Drill Programs will target the approximate true widths of this mineralization.

References:
All assessment file data referenced above can be sourced at the following Newfoundland and Labrador web link: https://gis.geosurv.gov.nl.ca/

Qualified Person

The technical information contained in this news release has been reviewed by Glen Prior, Ph.D., P.Geo. of Dahrouge Geological Consulting, who is a “Qualified Person” as defined in NI 43-101.

The results discussed in this document are historical. A Qualified Person has not performed sufficient work or data verification to validate these results in accordance with NI 43-101. Although the historical results may not be reliable, Vital Battery Metals Inc. nevertheless believes that they provide an indication of the property’s potential and are relevant for any future exploration program.

About Vital Battery Metals Inc.

Vital Battery Metals Inc. (CSE: VBAM |OTC: VBAMF | FRA: C0O) is a mineral exploration company dedicated to the development of strategic projects comprised of battery, base and precious metals in stable jurisdictions. The Company is working to advance its Schofield Lithium, Dickson Lake Lithium, Sting Copper Project, and Vent Copper-Gold Projects.

The Sting Copper Project covers approximately 12,700 hectares and hosts multiple historic Newfoundland and Labrador Government documented mineral occurrences and is located within a 50 km corridor known for significant volcanogenic massive sulfide (VMS), copper quartz vein lode and low sulphation epithermal gold showings. The Vent Copper-Gold project covers 1,562 hectares in British Columbia. Vital continues to evaluate value-add assets to bolster its project portfolio.

The Schofield Lithium Project covers 8,824 hectares and is adjacent to Brunswick Exploration’s Hearst Lithium Project. The Schofield Lithium Project is located ~60 km south of Hearst, Ontario. The Dickson Lake Lithium Project covers 464 single-cell mining claims and approximately 9,780 hectares and is near a Brunswick Exploration Lithium Project, Imagine Lithium’s Jackpot Deposit and Rock Tech’s Georgia Lake Deposit.

For more information, visit www.vitalbatterymetals.com.

On Behalf of the Board of Directors

Adrian Lamoureux
Chief Executive Officer, Director
+1 (604) 229-9772
info@vitalbatterymetals.com

Disclaimer for Forward-Looking Information

This news release contains certain forward-looking statements within the meaning of applicable securities laws. All statements that are not historical facts, including without limitation, statements regarding future estimates, plans, programs, forecasts, projections, objectives, assumptions, expectations or beliefs of future performance, including statements regarding the Project acquisition bringing a low-risk opportunity, the Company building a strong battery metals portfolio with low-risk opportunities that positively impact the Company and its shareholders and the Company providing an initial work plan are "forward-looking statements". Forward-looking statements in this news release include, but are not limited to, statements with respect to the Sting Project and its mineralization potential; the Company’s objectives, goals or future plans with respect to the Sting Project; the commencement of drilling or exploration programs in the future; the anticipated results of any drilling or exploration programs conducted in the future. These forward-looking statements reflect the expectations or beliefs of management of the Company based on information currently available to it. Forward-looking statements are subject to a number of risks and uncertainties, including those detailed from time to time in filings made by the Company with securities regulatory authorities, which may cause actual outcomes to differ materially from those discussed in the forward-looking statements. These factors should be considered carefully and readers are cautioned not to place undue reliance on such forward-looking statements. The forward-looking statements and information contained in this news release are made as of the date hereof and the Company undertakes no obligation to update publicly or revise any forward-looking statements or information, whether as a result of new information, future events or otherwise, unless so required by applicable securities laws.

The Canadian Securities Exchange (CSE) does not accept responsibility for the adequacy or accuracy of this release.

Photos accompanying this announcement are available at:
https://www.globenewswire.com/NewsRoom/AttachmentNg/b61ceeef-178e-4327-8fc0-6537d0f115d8
https://www.globenewswire.com/NewsRoom/AttachmentNg/e7aef49b-4547-4c24-8b73-7deca43b2031
https://www.globenewswire.com/NewsRoom/AttachmentNg/2b3ff568-bad2-4f52-a349-9448daa39bf8
https://www.globenewswire.com/NewsRoom/AttachmentNg/1f6803f7-2b98-430b-9a99-28b50ae22faf


FAQ

What is Vital Battery Metals announcing regarding the Sting Copper Project in Newfoundland?

Vital Battery Metals is announcing its 2024 Exploration & Drilling Program on the Sting Copper Project in Newfoundland, targeting potential copper and gold mineralization.

Where is the Sting Copper Project located?

The Sting Copper Project is located in western Newfoundland, north of the Bay of Islands.

What work programs are planned for the Sting Copper Project in 2024?

The planned work programs for 2024 include mapping, sampling, IP surveys, and drilling at the Jumbo-Lode and North Sting claim blocks.

Who will lead the exploration programs at the Sting Copper Project in 2024?

The exploration programs at the Sting Copper Project in 2024 will be led by Dahrouge Geological Consulting

What are the highlights of the proposed 2024 work program for the Jumbo-Lode Claim Block?

Highlights of the proposed 2024 work program for the Jumbo-Lode Claim Block include follow-up soil sampling, prospecting, and IP surveys to confirm mineralized trends and highlight targets for future drilling.

VITAL BATTERY METALS INC

OTC:VBAMF

VBAMF Rankings

VBAMF Latest News

VBAMF Stock Data

5.92M
46.29M
8.22%
Other Industrial Metals & Mining
Basic Materials
Link
United States of America
Vancouver