Kraken Energy Identifies Multiple Additional Priority Drill Targets at Apex Uranium Property, Nevada
- Strong radon anomalies coincide with geophysical signatures at historic Apex Uranium Mine.
- Over 2 km of high priority target potential identified on newly staked BLM ground.
- Notice of Intent submitted to drill up to 2,200 m in 24 holes from 8 pads.
- New drill target area within BLM land permits drilling before end of 2023.
- None.
Vancouver, British Columbia--(Newsfile Corp. - October 17, 2023) - Kraken Energy Corp. (CSE: UUSA) (OTCQB: UUSAF) (the "Company" or "Kraken") is pleased to report that the ongoing radon survey conducted at its
Interpretation of the recently flown VTEM and UAV magnetic surveys shows a geophysical signature associated with uranium mineralization at the Apex Mine that appears to be offset to the north where it continues trending northwest. This geophysical signature coincides with strong and consistent, recently identified radon anomalies.
Highlights:
- Strong radon anomalies coincident with geophysical signatures outlining the mineralized contact at the historic Apex Uranium Mine
- Over 2 km of high priority target potential has been identified on the newly staked BLM ground that follows the northwest mineralized trend from the Apex Mine
- Newly defined and previously undrilled target area with projected target depths ranging from 50 m to 200 m (164 ft to 656 ft)
- Notice of Intent (NOI) has been submitted to the BLM to drill up to 2,200 m (7217 ft) in 24 holes from 8 pads with an objective to commence drilling before the end of 2023
Matthew Schwab, CEO of Kraken, stated, "Our team's application of modern, detailed geophysical surveys and radon surveying at the Apex Property has identified an exceptional multi-layered and high priority drill target area located northwest and along trend from the historic Apex Uranium Mine. It's clear that past operators missed this potential 2.0 km long mineralized extension from the Apex Mine, which has been offset to the north as indicated by the geophysical data. The combination of geophysics and radon data is a powerful targeting tool as radon gas is a direct product from the radioactive decay of uranium.
"The fact that this new high priority drill target area is within BLM land is also very positive as the permitting timeline with the BLM should have us drilling before the end of 2023."
Figure 1: Radon Anomalies at Apex Uranium Property on BLM Ground
To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/8684/184212_f905dda494caa885_001full.jpg
About the Apex Property:
The Apex Uranium Mine was Nevada's largest past-producing uranium mine which produced ~106,000 pounds of U3O8 in the 1950s at an average mining grade of ~
References
1 Uranium Deposits of the World USA and Latin America, by Franz J. Dahlkamp (1965, pg 291).
2 Nevada Bureau Mines File 60000269, Report on Mines of Apex Minerals Corporation 1957, by Harry H. Hughes, Mining Geologist.
3 EPRI Report EA-498 "Uranium Price Formation" (1977, pg 2-19).
4 Nevada Bureau Mines File 38900096, Transverse Section Through Drilled Orebody, Apex Minerals Corp 1959, by Harry Hughes, Mining Geologist.
5 Nevada Bureau Mines File 38900084, Plan map of underground workings, sampling, and drill holes at the Apex mine 1959, by Harry Hughes, Mining Geologist.
Technical Information:
All scientific and technical information in this news release has been prepared by or reviewed and approved by Matthew Schwab, P.Geo., President and CEO of the Company, and Garrett Ainsworth, P.Geo., Chairman of the Company. Each of Mr. Schwab and Mr. Ainsworth is a Qualified Person for the purposes of National Instrument 43-101 - Standards of Disclosure for Mineral Projects.
The data disclosed in this news release is related to historical drilling results. Kraken has not undertaken any independent investigation of the sampling, nor has it independently analyzed the results of the historical exploration work in order to verify the results. Kraken considers these historical drill results relevant as the Company is using this data as a guide to plan exploration programs. The Company's current and future exploration work includes verification of the historical data through drilling.
About Kraken Energy Corp.:
Kraken Energy Corp. is a new energy company advancing its portfolio of high-grade uranium properties in the Unites States. The Company is advancing its
For more information about the Company, please visit; www.krakenenergycorp.com.
On Behalf of the Board of Kraken Energy Corp.:
Matthew Schwab
President & Chief Executive Officer
Corporate Office:
Suite 907 - 1030 West Georgia Street
Vancouver, British Columbia
V6E 2Y3
T: (604) 628-2669
For investor relations inquiries, contact:
Kin Communications Inc.
T: (604) 684-6730
E: uusa@kincommunications.com
This news release contains forward-looking information which is subject to a variety of risks and uncertainties and other factors that could cause actual events or results to differ from those projected in the forward-looking statements. Forward-looking statements in this press release include our plans for exploration at the properties. These forward-looking statements are subject to a variety of risks and uncertainties and other factors that could cause actual events or results to differ materially from those projected in the forward-looking information. Risks that could change or prevent these statements from coming to fruition include changing costs for mining and processing; increased capital costs; the timing and content of upcoming work programs; geological interpretations based on drilling that may change with more detailed information; potential process methods and mineral recoveries assumption based on limited test work and by comparison to what are considered analogous deposits that with further test work may not be comparable; the availability of labour, equipment and markets for the products produced; and despite the current expected viability of the project, conditions changing such that the minerals on our property cannot be economically mined, or that the required permits to build and operate the envisaged mine can be obtained. The forward-looking information contained herein is given as of the date hereof and the Company assumes no responsibility to update or revise such information to reflect new events or circumstances, except as required by law.
To view the source version of this press release, please visit https://www.newsfilecorp.com/release/184212
FAQ
What is the significance of the radon anomalies?
How much high priority target potential has been identified?
What is the objective of the drilling?
When will drilling commence?