American Pacific Mining Corp’s Constantine Joint Venture Commences 9,000-Metre Drill Program at Palmer Project
VANCOUVER, British Columbia, June 19, 2023 (GLOBE NEWSWIRE) -- American Pacific Mining Corp (CSE: USGD / OTCQX: USGDF / FWB: 1QC) (“American Pacific” or the “Company”) is pleased to announce its 2023 drill program has commenced at the Palmer Project (“Palmer” or the “Project”), an advanced-stage, high-grade volcanogenic massive sulphide-sulphate (“VMS”) located in the Porcupine Mining District of the Haines Borough, Alaska. The drill program, which will focus on several high priority targets, is a central component of the Company’s US
The 9,000 metre (“m”) resource infill drill program at the Southwall Zone is designed to begin the process of upgrading mineral resources from Inferred to Measured and Indicated. The Palmer Deposit (Southwall and RW Zones) hosts an Indicated mineral resource of 4.68 million tonnes grading
“Our drill program this year has been designed with two primary goals: to delineate the high-grade portion of the deposit to further define the mineral resource estimation methodology as we look to convert mineral resources into mineral reserves in future feasibility studies; and to expand our mineral resource base with step-out and directional drilling in the Southwall Zone,” said Peter Mercer, Senior Vice President, Advanced Projects. “This year’s programs will lay the foundation for the engineering and evaluation work ahead. In addition, the knowledge gained from these programs will provide new insights into the potential for new high-grade discoveries throughout the mineralized district.”
The Company’s joint venture partner, Dowa, has committed to fund the US
Qualified Person Statement
The technical information in this news release has been reviewed and approved by Michael Vande Guchte, P.Geo., VP Exploration for the Palmer Project and a qualified person as defined by National Instrument 43-101, Standards of Disclosure for Mineral Projects.
About the Palmer Project
The Palmer Project is a promising advanced-stage high-grade VMS project located within the Porcupine Mining District of the Haines Borough, Alaska. The Project is operated in a joint venture partnership between American Pacific, through its wholly owned subsidiary, Constantine North Inc. as the manager (operator), with
As of December 31, 2022, US
About American Pacific Mining Corp.
American Pacific Mining Corp. is a precious and base metals explorer and developer focused on opportunities in the Western United States. The Company has two flagship assets: the Palmer Project, a Volcanic Massive Sulfide (VMS) project in Alaska, under joint-venture partnership with Dowa Metals & Mining, owner of Japan’s largest zinc smelter; and the Madison Project, a past-producing copper-gold project in Montana partnered with Kennecott Exploration, a division of the Rio Tinto Group. For the Madison transaction, American Pacific was selected as a finalist in both 2021 and 2022 for ‘Deal of the Year’ at the S&P Global Platts Global Metals Awards, an annual program that recognizes exemplary accomplishments in 16 performance categories. Also, in American Pacific’s asset portfolio are three high-grade, precious metals projects located in key mining districts of Nevada, USA: the Ziggerat Gold project, partnered with Centerra Gold; the Gooseberry Silver-Gold project; and the Tuscarora Gold-Silver project. The Company’s mission is to grow by the drill bit and by acquisition.
On behalf of the American Pacific Mining Corp Board of Directors:
Warwick Smith, CEO & Director
Corporate Office: Suite 910 – 510 Burrard Street
Vancouver, BC, V6C 3A8 Canada
Investor relations contact:
Kristina Pillon, High Tide Consulting Corp.
604.908.1695 / Kristina@americanpacific.ca
Media relations contact:
Adam Bello, Primoris Group Inc.
416.489.0092 / media@primorisgroup.com
¹Amended NI 43-101 Technical Report Palmer Project Alaska, USA, JDS Energy and Mining Inc. 2019
The CSE has neither approved nor disapproved the contents of this news release. Neither the CSE nor its Regulation Services Provider (as that term is defined in the policies of the CSE) accepts responsibility for the adequacy or accuracy of this release.