STOCK TITAN

Uranium Energy Corp Intersects 12.7% eU3O8 over 7.2 metres, 850 m northeast of Roughrider Deposit

Rhea-AI Impact
(Neutral)
Rhea-AI Sentiment
(Neutral)
Tags

Uranium Energy Corp (NYSE American: UEC) reports significant drill results from its Roughrider Project in Northern Saskatchewan, Canada. The company intersected 6.96% eU3O8 over 13.5 m with a higher-grade sub-interval of 12.7% eU3O8 over 7.2 metres in drill hole RR-940, located 850 m northeast of the Roughrider Deposit. This represents the best hole to date outside the resource area.

UEC is advancing Roughrider through a three-pronged approach: expanding resources with additional drilling, completing an Initial Assessment Technical Report, and conducting Environmental Assessment baseline studies. The company is utilizing new Ambient Noise Tomography (ANT) survey technology to identify new targets along existing exploration corridors.

Uranium Energy Corp (NYSE American: UEC) riporta risultati significativi dei sondaggi dal suo Progetto Roughrider nel Saskatchewan settentrionale, Canada. L'azienda ha intercettato 6.96% eU3O8 su 13.5 m con un sub-intervallo di grado superiore di 12.7% eU3O8 su 7.2 metri nel foro di sondaggio RR-940, situato a 850 m a nord-est del Deposito Roughrider. Questo rappresenta il miglior foro fino ad oggi al di fuori dell'area delle risorse.

UEC sta avanzando con Roughrider attraverso un approccio a tre fronti: espansione delle risorse con sondaggi aggiuntivi, completamento di un Rapporto Tecnico di Valutazione Iniziale e conduzione di studi di base di Valutazione Ambientale. L'azienda sta utilizzando una nuova tecnologia di sondaggio chiamata Tomografia del Rumore Ambientale (ANT) per identificare nuovi obiettivi lungo i corridoi di esplorazione esistenti.

Uranium Energy Corp (NYSE American: UEC) informa sobre resultados de perforación significativos de su Proyecto Roughrider en el Saskatchewan del Norte, Canadá. La empresa intersectó 6.96% eU3O8 sobre 13.5 m con un subintervalo de mayor grado de 12.7% eU3O8 sobre 7.2 metros en el agujero de perforación RR-940, ubicado a 850 m al noreste del Depósito Roughrider. Esto representa el mejor agujero hasta la fecha fuera del área de recursos.

UEC está avanzando con Roughrider a través de un enfoque de tres vías: expansión de recursos con perforaciones adicionales, completando un Informe Técnico de Valoración Inicial, y llevando a cabo estudios de línea base para la Evaluación Ambiental. La empresa está utilizando una nueva tecnología de encuesta de Tomografía de Ruido Ambiental (ANT) para identificar nuevos objetivos a lo largo de los corredores de exploración existentes.

우라늄 에너지 코퍼레이션 (NYSE American: UEC)은 캐나다 노던 사스캐처원에 위치한 러프라이더 프로젝트에서 중요한 시추 결과를 보고했습니다. 이 회사는 러프라이더 매장지의 북동쪽 850m 지점에 위치한 시추홀 RR-940에서 13.5m에서 6.96% eU3O8을 교차하며, 7.2미터에서 12.7% eU3O8의 고그레이드 서브 인터벌로 확인했습니다. 이는 자원 지역 외부에서 현재까지 최고의 시추 결과를 나타냅니다.

UEC는 추가 시추를 통한 자원 확장, 초기 평가 기술 보고서 완료, 환경 평가 기초 조사 수행을 통해 러프라이더를 발전시키고 있습니다. 이 회사는 기존 탐사 통로를 따라 새로운 목표를 식별하기 위해 새로운 환경 소음 탐사 (ANT) 기술을 사용하고 있습니다.

Uranium Energy Corp (NYSE American: UEC) rapporte des résultats de forage significatifs de son Projet Roughrider dans le Saskatchewan Nord, Canada. L'entreprise a intercepté 6.96% eU3O8 sur 13.5 m avec un sous-intervalle de qualité supérieure de 12.7% eU3O8 sur 7.2 mètres dans le trou de forage RR-940, situé à 850 m au nord-est du Dépôt Roughrider. Cela représente le meilleur trou à ce jour en dehors de la zone de ressources.

UEC fait avancer Roughrider selon une approche en trois volets : expansion des ressources par des forages supplémentaires, réalisation d'un Rapport Technique d'Évaluation Initiale, et réalisation d'études de base d'Évaluation Environnementale. L'entreprise utilise une nouvelle technologie de sondage appelée Tomographie du Bruit Ambiant (ANT) pour identifier de nouveaux cibles le long des corridors d'exploration existants.

Uranium Energy Corp (NYSE American: UEC) berichtet über bedeutende Bohrergebnisse aus seinem Roughrider-Projekt im nordlichen Saskatchewan, Kanada. Das Unternehmen hat 6.96% eU3O8 über 13.5 m mit einem höhergradigen Unterabschnitt von 12.7% eU3O8 über 7.2 Meter im Bohrloch RR-940 erbohrt, das sich 850 m nordöstlich des Roughrider-Vorkommens befindet. Dies stellt das beste Bohrloch außerhalb des Ressourcenbereichs bis heute dar.

UEC entwickelt Roughrider mit einem dreigleisigen Ansatz: Ressourcenerweiterung durch zusätzliche Bohrungen, Erstellung eines Erstbewertungsberichtes und Durchführung von Umweltbewertungsbasisstudien. Das Unternehmen nutzt neue Ambient Noise Tomography (ANT)-Umfrage-Technologie, um neue Ziele entlang bestehender Erschließungsflure zu identifizieren.

Positive
  • Intersected high-grade uranium mineralization: 6.96% eU3O8 over 13.5 m with 12.7% eU3O8 over 7.2 metres
  • Best drill hole to date outside the resource area, potentially expanding the project's resources
  • Utilization of new ANT survey technology to identify new exploration targets
  • Accelerated project work with three drills operating simultaneously
  • Advancing Initial Assessment Technical Report, expected in the coming months
Negative
  • None.

The recent drilling results from UEC's Roughrider Project are highly significant. The intersection of 12.7% eU3O8 over 7.2 metres in drill hole RR-940 is exceptional, representing the best hole to date outside the resource area. This high-grade mineralization, located 850m northeast of the main deposit, suggests potential for substantial resource expansion.

The use of Ambient Noise Tomography (ANT) technology is a game-changer, enabling more precise target identification. This could lead to more efficient exploration and potentially faster resource growth. The three-pronged approach, combining aggressive drilling, economic studies and environmental assessments, indicates a well-rounded development strategy.

From an engineering perspective, these results could significantly impact project economics. High-grade intersections like this often translate to lower mining costs and higher profitability. However, further drilling is needed to confirm the continuity and extent of this mineralization.

These drilling results are likely to have a positive impact on UEC's valuation. The high-grade intersection of 12.7% eU3O8 over 7.2 metres is substantially above the average grades typically seen in uranium deposits. This could potentially lead to an increase in the project's resource estimate and improve its economic viability.

The ongoing three-pronged approach suggests a comprehensive development strategy. The completion of the Initial Assessment Technical Report Summary in the coming months could be a significant catalyst for the stock, providing investors with a clearer picture of the project's economic potential.

However, it's important to note that uranium prices and regulatory environment play important roles in the project's ultimate profitability. Investors should monitor these factors alongside the company's exploration progress. The accelerated pace of work and positive results could potentially lead to increased investor interest and support for UEC's stock price.

The advancement of Environmental Assessment (EA) baseline studies alongside exploration activities demonstrates UEC's commitment to responsible development. This proactive approach to environmental considerations is important in the uranium mining sector, which faces intense scrutiny.

The use of Ambient Noise Tomography (ANT) technology is noteworthy from an environmental perspective. This non-invasive exploration method could potentially reduce the environmental footprint of exploration activities compared to traditional methods.

However, the high-grade nature of the mineralization (12.7% eU3O8) also raises potential environmental concerns. Such high-grade deposits require careful handling and stringent safety measures during mining and processing to prevent any radiological hazards. The company's approach to these challenges will be critical as the project advances.

The ongoing community engagement is a positive sign, as local support is important for the successful development of uranium projects. Continued transparency and engagement will be essential as the project progresses through the permitting stages.

NYSE American: UEC

CORPUS CHRISTI, Texas, Aug. 20, 2024 /PRNewswire/ - Uranium Energy Corp (NYSE American: UEC) the "Company" or "UEC") is pleased to report drill results from its Roughrider Project located in Northern Saskatchewan, Canada. Drilling 850 m northeast of the Roughrider Deposit has intersected the best hole to date outside of the resource area on a parallel trend to Roughrider.

  • Exploration Drilling: UEC's ongoing drill program has intersected basement-hosted uranium mineralization in drill hole RR-940 that grades 6.96% eU3O8 over 13.5 m with a higher-grade sub-interval that grades 12.7% eU3O8 over 7.2 metres. UEC will continue drilling in this area to evaluate the potential for additional resources.

  • Regional drilling benefits from new ANT survey technology: In April of this year, UEC conducted an Ambient Noise Tomography ("ANT") survey. This new exploration technology is being applied to Roughrider for the first time and has identified new targets along existing exploration corridors.

  • Roughrider next steps: UEC has a three-prong approach to advancing Roughrider,

    • continue growing the project's resources with an additional 25 holes this summer to further investigate the Roughrider north exploration corridor,

    • advance the Initial Assessment ("IA") Technical Report Summary ("TRS") that is based on the existing project resources, this work is substantially complete and is anticipated in the coming months,

    • EA baseline studies, along with community engagement to advance licensing and permitting.

Chris Hamel, Vice President Exploration, Canada stated: "We have accelerated the pace of project work at Roughrider this summer by utilizing three drills and the results thus far have exceeded our expectations. We have been able to successfully follow-up on results that Rio Tinto had intersected northeast of Roughrider with the best hole on the project outside the deposit area. We have intersected uranium mineralization in multiple drill holes between the East and Far East Zones, further demonstrating there is likely continuity between these zones. The north exploration corridor is largely untested and our team, with the help of the ANT survey, has been able to develop priority drill targets along the trend. UEC continues to advance the project on parallel tracks by working on an economic study for the project while also updating the Environmental Assessment baseline work and conducting an aggressive drilling campaign."

Table 1, outlined below, details the equivalent uranium intersections (eU3O8) from select drill holes from the 2024 summer campaign. Figure 1 shows the immediate Roughrider project area in the Northern part of Athabasca Basin, and Figure 2 illustrates a wider picture of where the Roughrider project is located within the Athabasca Basin.


From
(m)

To
(m)

Width
(m)

Avg.
Grade
(eU3O8)

Cut-off
Grade
(eU3O8)

GT





RR-909


244.3

264.8

20.6

0.07

0.05

1.4



RR-910


250.3

305.5

55.2

0.52

0.05

28.8



incl.

250.3

255.4

5.1

1.63

0.05

8.3



incl.

297.6

305.5

7.9

2.53

0.05

20.0



RR-913


262.8

310.3

47.5

0.47

0.05

22.1



incl.

307.8

309.9

2.1

6.81

1.00

14.3



RR-919


304.1

307.1

3.0

2.23

0.05

6.7



incl.

304.4

306.2

1.8

3.51

1.00

6.3



RR-925


239.8

313.0

73.3

0.11

0.05

7. 8



incl.

244.3

246.1

1.9

1.83

1.00

3.5



RR-929


291.1

300.2

9.1

0.79

0.05

7.2



incl.

291.5

292.3

0.8

1.38

1.00

1.1



incl.

294.2

295.0

0.8

2.76

1.00

2.2



RR-930


282.8

288.4

5.6

0.18

0.05

1.0



RR-933


242.2

244.7

2.5

0.094

0.05

0.2




230.6

231.1

0.5

0.08

0.05

0.0




249.9

264.2

14.3

3.00

0.05

42.8



incl.

251.9

262.2

10.3

4.06

1.00

41.8



incl.

260.4

260.8

0.4

14.68

10.00

5.9



RR-934


316.2

318.1

1.9

0.22

0.05

0.4




327.1

328.4

1.3

0.07

0.05

0.1



RR-935


319.1

320.2

1.1

0.05

0.05

0.1




324.1

327.9

3.8

0.10

0.05

0.4



RR-937


313.8

315.7

1.9

0.64

0.05

1.2



incl.

314.8

315.4

0.6

1.44

1.00

0.9



RR-938


322.4

323.2

0.8

0.32

0.05

0.3



RR-940


271.1

284.6

13.5

6.96

0.05

93.9



incl.

271.2

283.4

12.2

7.69

0.10

93.8



incl.

273.2

280.4

7.2

12.71

1.00

91.5



incl.

281.9

282.5

0.6

1.99

1.00

1.2



RR-945


270.8

281.3

10.5

3.17

0.05

33.2



incl.

271.7

280.8

9.1

3.61

1.00

32.9



incl.

273.6

273.9

0.3

10.62

10.00

3.2



incl.

277.6

278.2

0.6

15.18

10.00

9.1



RR-948


292.4

293.5

1.1

0.62

0.05

0.7



incl.

292.9

293.1

0.2

1.10

1.00

0.2



RR-949-1


255.6

261.6

6.0

0.14

0.05

0.8



incl.

255.6

257.3

1.7

0.14

0.05

0.2



incl.

259.8

261.6

1.8

0.33

0.05

0.6



RR-950


266.7

268.1

1.4

0.27

0.05

0.4



Table 1: Roughrider Drilling Equivalent Grades

About Canada's Athabasca Basin

The Athabasca Basin is a world-class uranium district in the northern portion of the provinces of Saskatchewan and Alberta in Canada, occupying an area of about 100,000 square kilometres. The unique geology of the Athabasca Basin often results in deposit grades that exceed the world average of uranium deposits of 0.2% U3O8 by up to 100 times.

All of Canada's current uranium production occurs from the mines located in the Athabasca Basin. According to the World Nuclear Association, the Athabasca Basin was responsible for producing 15% of the world's uranium production in 2022.

Uranium mineralization in the Athabasca Basin occurs in fault structures that penetrate the interface between the sandstone and underlying basement rocks. Uranium can be found at the interface, known as the unconformity, or up to several hundreds of metres below the unconformity surface in the underlying basement rock and fault structures.

The uranium concentrations in the holes presented above from the radiometric equivalent uranium grade ("REG"), denoted as eU3O8, were determined in-situ within the drill hole. For more information on REGs please see the "About Radiometric Equivalent Grades" section below.

About Radiometric Equivalent Grades

The eU3O8 grades were estimated in-situ within the drill holes using calibrated down-hole radiometric gamma probes lowered down into the hole. The probe records the amount of radioactivity present in the rock adjacent to the probe as it moves up and down the hole. The radiometric equivalent grade of uranium oxide (eU3O8) is then calculated.

The standard and shielded probes were calibrated prior to the commencement of the current drill program at the Saskatchewan Research Council's ("SRC") test pit facility in Saskatoon, Saskatchewan, and the Hi-Flux probes are calibrated at Alpha Nuclear in Saskatoon. Using down-hole probes to calculate radiometric equivalent grades is a common practice used by uranium mining companies in the Athabasca Basin. Down-hole probes can accurately measure uranium concentration by measuring the light flashes that occur every time the probe's scintillator is struck by a gamma radiation particle emitted from uranium crystals. The number of light flashes are 'counted' by a photomultiplier tube. Due to a process called 'saturation' that occurs when light emitted by the probe's scintillator overwhelms the photomultiplier tube's ability to 'count' individual light flashes, it can sometimes be difficult to accurately determine radiometric equivalent grades in high-grade intervals.

Samples from all holes have been collected for assay analysis to confirm these equivalent grades. The samples will be analyzed at SRC's Geoanalytical Laboratory in Saskatoon, with results expected in the coming weeks.

About the Roughrider Uranium Project

The Roughrider Project is a uranium project located in the eastern Athabasca Basin of northern Saskatchewan, Canada; one of the world's premier uranium mining jurisdictions. The project is located approximately 13 kilometres west of Orano's McClean Lake Mill, near UEC's existing Athabasca Basin properties. The depth to mineralization at the project is approximately 200 m and hosted primarily in the basement rocks below the unconformity.

Qualified Persons and Data Acquisition

The technical information in this news release has been reviewed and approved by Chris Hamel, P.Geo., UEC's Vice President Exploration, Canada, who is a Qualified Person for the purposes of SEC Regulation S-K 1300.

About Uranium Energy Corp

Uranium Energy Corp is the fastest growing supplier of fuel for the green energy transition to a low carbon future. UEC is the largest, diversified North American focused uranium company, advancing the next generation of low-cost, environmentally friendly In-Situ Recovery ("ISR") uranium projects in the United States and high-grade conventional projects in Canada. The Company has one producing ISR production hub and spoke platform in Wyoming and one ISR production-ready ISR hub and spoke platform located in South Texas. These two production platforms are anchored by fully operational central processing plants and served by seven U.S. ISR uranium projects with all their major licenses and permits in place. Additionally, the Company has diversified uranium holdings including: (1) one of the largest physical uranium portfolios of North American warehoused U3O8; (2) a major equity stake in Uranium Royalty Corp., the only royalty company in the sector; and (3) a Western Hemisphere pipeline of resource stage uranium projects. The Company's operations are managed by professionals with decades of hands-on experience in the key facets of uranium exploration, development and mining.

Figure 1: Roughrider Location Map (CNW Group/Uranium Energy Corp)

Figure 2: Athabasca Project Map (CNW Group/Uranium Energy Corp)

X (formerly known as Twitter): @UraniumEnergy

Stock Exchange Information:
NYSE American: UEC
WKN: AØJDRR
ISN: US916896103

Safe Harbor Statement

Except for the statements of historical fact contained herein, the information presented in this news release constitutes "forward-looking statements" as such term is used in applicable United States and Canadian securities laws. These statements relate to analyses and other information that are based on forecasts of future results, estimates of amounts not yet determinable and assumptions of management. Any other statements that express or involve discussions with respect to predictions, expectations, beliefs, plans, projections, objectives, assumptions or future events or performance (often, but not always, using words or phrases such as "expects" or "does not expect", "is expected", "anticipates" or "does not anticipate", "plans, "estimates" or "intends", or stating that certain actions, events or results "may", "could", "would", "might" or "will" be taken, occur or be achieved) are not statements of historical fact and should be viewed as "forward-looking statements". Such forward looking statements involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of the Company to be materially different from any future results, performance or achievements expressed or implied by such forward-looking statements. Such risks and other factors include, among others, the actual results of exploration activities, variations in the underlying assumptions associated with the estimation or realization of mineral resources, the availability of capital to fund programs and the resulting dilution caused by the raising of capital through the sale of shares, accidents, labor disputes and other risks of the mining industry including, without limitation, those associated with the environment, delays in obtaining governmental approvals, permits or financing or in the completion of development or construction activities, title disputes or claims limitations on insurance coverage. Although the Company has attempted to identify important factors that could cause actual actions, events or results to differ materially from those described in forward-looking statements, there may be other factors that cause actions, events or results not to be as anticipated, estimated or intended. Many of these factors are beyond the Company's ability to control or predict. There can be no assurance that such statements will prove to be accurate as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking statements contained in this news release and in any document referred to in this news release. Important factors that may cause actual results to differ materially and that could impact the Company and the statements contained in this news release can be found in the Company's filings with the Securities and Exchange Commission. For forward-looking statements in this news release, the Company claims the protection of the safe harbor for forward-looking statements contained in the Private Securities Litigation Reform Act of 1995. The Company assumes no obligation to update or supplement any forward-looking statements whether as a result of new information, future events or otherwise. This news release shall not constitute an offer to sell or the solicitation of an offer to buy securities.

Cision View original content to download multimedia:https://www.prnewswire.com/news-releases/uranium-energy-corp-intersects-12-7-eu3o8-over-7-2-metres-850-m-northeast-of-roughrider-deposit-302226191.html

SOURCE Uranium Energy Corp

FAQ

What were the key uranium intersections in UEC's Roughrider Project drilling?

UEC intersected 6.96% eU3O8 over 13.5 m with a higher-grade sub-interval of 12.7% eU3O8 over 7.2 metres in drill hole RR-940, located 850 m northeast of the Roughrider Deposit.

How is UEC advancing the Roughrider Project?

UEC is advancing Roughrider through a three-pronged approach: expanding resources with additional drilling, completing an Initial Assessment Technical Report, and conducting Environmental Assessment baseline studies.

What new technology is UEC using for exploration at the Roughrider Project?

UEC is utilizing Ambient Noise Tomography (ANT) survey technology to identify new targets along existing exploration corridors at the Roughrider Project.

When is UEC expecting to complete the Initial Assessment Technical Report for Roughrider?

UEC anticipates completing the Initial Assessment Technical Report for the Roughrider Project in the coming months.

Uranium Energy Corp.

NYSE:UEC

UEC Rankings

UEC Latest News

UEC Stock Data

2.29B
408.78M
1.99%
79.23%
11.25%
Uranium
Miscellaneous Metal Ores
Link
United States of America
VANCOUVER