STOCK TITAN

TRILLION ENERGY COMMENCES SASB 3D SEISMIC REPROCESSING PROJECT

Rhea-AI Impact
(Moderate)
Rhea-AI Sentiment
(Positive)
Tags
Rhea-AI Summary

Trillion Energy International has announced the start of a 3D seismic reprocessing project for the SASB natural gas field, covering 223 km2 of previously obtained data. This reprocessing will utilize advanced pre-stack depth migration (PSDM) techniques to enhance geological insights, targeting gas reservoir units and unexplored stratigraphic prospects. The project is set to begin in early March 2023 and is expected to take five to six months. CEO Arthur Halleran noted that the initiative is crucial for understanding gas potential and discovering new gas pools at SASB, which is one of the largest-scale natural gas developments in the Black Sea.

Positive
  • Initiation of 3D seismic reprocessing to enhance geological understanding of SASB.
  • Use of advanced PSDM techniques promises improved mapping of gas reservoirs.
  • Potential to identify new gas pools and exploration prospects in deeper formations.
Negative
  • None.

Reprocessing will assist in further exploration and development of Gas Pools

Vancouver, B.C, Jan. 31, 2023 (GLOBE NEWSWIRE) -- Trillion Energy International Inc. (“Trillion” or the “Company”) (CSE: TCF) (OTCQB: TRLEF) (Frankfurt: Z62). Trillion is pleased to announce the commencement of it’s 3D seismic reprocessing project for SASB.

The existing 3D seismic data covers 223 km2 and includes the SASB block. This old 3D seismic shot by WesternGeco in 2004 is good quality and was processed in 2004 with pre-stack time migration (PSTM). Since 2004, vast improvements in seismic data processing algorithms have occurred. As SASB has very complex geology, reprocessing with advanced pre-stack depth migration (PSDM) and incorporating time depth data from wells drilled since the old PSTM model was created will create a superior model.   

Uses of the new PSDM seismic velocity model will include:

  • Obtain a more detailed and accurate mapping of individual gas reservoir units, provide better imaging of the gas trapping faults and superior structural maps;
  • Further identify and define stratigraphic exploration gas prospects (to which there are many on SASB), but which have never been drilled;
  • Mapping the deeper Cretaceous Akveren Formation “CAF”, which has never been explored, but which contains tantalizing deeper anomalies based on the old PSTM model. Onshore proximate to SASB, there are many oil and gas seeps originating and contained within the Cretaceous sediments. The data reprocessing is scheduled to commence early March 2023 and is anticipated to take five to six months to complete.

Arthur Halleran CEO of Trillion stated:

“Reprocessing the 3D seismic data using modern cutting-edge technology will increase our understanding of the gas potential at SASB and is the first step to making significant new discoveries. The cost of reprocessing is infinitesimal compared a new 3D shoot of this size. The reprocessing will allow mapping of extensions to existing structurally trapped gas pools, discover new gas pools and improve resolution of the stratigraphic exploration prospects. I am excited about what we will also see in the deeper Cretaceous age formations, where onshore oil and gas seeps have been found 20 to 30 km from SASB.”

About the Company

Trillion is an oil and gas producing company with multiple assets throughout Turkiye and Bulgaria. The Company is 49% owner of the SASB natural gas field, one of the Black Sea’s first and largest-scale natural gas development projects; a 19.6% (except three wells with 9.8%) interest in the Cendere oil field; and in Bulgaria, the Vranino 1-11 block, a prospective unconventional natural gas property. More information may be found on www.sedar.com, and our website.

Phone: 1-778-819-1585
E-mail: info@trillionenergy.com
Website: www.trillionenergy.com

Cautionary Statement Regarding Forward-Looking Statements

This news release may contain certain forward-looking information and statements, including without limitation, statements pertaining to the Company's ability to obtain regulatory approval of the executive officer and director appointments. All statements included herein, other than statements of historical fact, are forward-looking information and such information involves various risks and uncertainties. Trillion does not undertake to update any forward-looking information except in accordance with applicable securities laws.

These statements are not guaranteeing of future performance and are subject to certain risks, uncertainties, and assumptions that are difficult to predict. Accordingly, actual results could differ materially and adversely from those expressed in any forward-looking statements as a result of various factors. These factors include unforeseen securities regulatory challenges, COVID, oil and gas price fluctuations, operational and geological risks, the ability of the Company to raise necessary funds for development; the outcome of commercial negotiations; changes in technical or operating conditions; the cost of extracting gas and oil may be too costly so that it is uneconomic and not profitable to do so and other factors discussed from time to time in the Company’s filings on www.sedar.com, including the most recently filed Annual Report on Form 20-F and subsequent filings for the first quarter of 2022. For a full summary of our oil and gas reserves information for Turkey, please refer to our Forms F-1,2,3 51-101 filed on www.sedar.com, and or request a copy of our reserves report effective December 31, 2021 and our Prospective Resource report effective October 31, 2021.


FAQ

What is the focus of Trillion Energy's recent press release dated January 31, 2023?

Trillion Energy's press release focuses on the commencement of a 3D seismic reprocessing project for the SASB natural gas field.

What technology is being utilized in Trillion Energy's seismic reprocessing project?

The project will utilize advanced pre-stack depth migration (PSDM) techniques for improved geological insights.

How long is Trillion Energy's seismic reprocessing project expected to take?

The seismic reprocessing project is anticipated to take five to six months to complete.

What benefits does Trillion Energy expect from the reprocessing of seismic data?

The company expects better mapping of gas reservoirs, identification of new gas pools, and improved resolution of exploration prospects.

What is the significance of the SASB natural gas field for Trillion Energy?

The SASB field is one of the largest-scale natural gas development projects in the Black Sea, where Trillion Energy holds a 49% interest.

TRILLION ENERGY INTL INC

OTC:TRLEF

TRLEF Rankings

TRLEF Latest News

TRLEF Stock Data

9.67M
156.67M
4.13%
Oil & Gas E&P
Energy
Link
United States of America
Vancouver