Skyharbour Commences Winter 2022 Drilling Program at High Grade Moore Uranium Project, Saskatchewan
Skyharbour Resources Ltd. (TSX-V: SYH, OTCQB: SYHBF) has initiated its winter 2022 diamond drilling program at the Moore Uranium Project in Saskatchewan. This program aims to complete a minimum of 2,500 metres across 7 to 9 drill holes, targeting the Maverick East Zone and Grid 19. Previous successful drilling revealed significant uranium mineralization. The project covers 35,705 hectares and is well-positioned to capitalize on the recovering uranium market, benefiting from regional infrastructure and strong discovery potential.
- Initiation of winter 2022 diamond drilling program with a minimum of 2,500 metres planned.
- Successful previous drilling highlighted significant uranium mineralization, including 0.54% U3O8 over 19.5 metres.
- Strong discovery potential in the Maverick Structural Corridor with substantial areas still untested.
- Strategically located in a geopolitically favourable region for mining, enhancing operational benefits.
- None.
Vancouver, BC, March 01, 2022 (GLOBE NEWSWIRE) -- Skyharbour Resources Ltd. (TSX-V: SYH) (OTCQB: SYHBF) (Frankfurt: SC1P) (the “Company”) is pleased to announce that the Company has begun its winter 2022 diamond drilling program at its
Moore Uranium Project Claims Map:
http://skyharbourltd.com/_resources/maps/MooreLakeRegionalTenure.jpg
Winter 2022 Diamond Drilling Program:
The Company has begun a minimum 2,500 metre winter drilling program consisting of an estimated seven to nine diamond drill holes. The program will test targets at the Grid 19 area, Maverick East Zone and the Viper area. At the Grid 19 target area, a regional target approx. 9.5 km NE of the Main Maverick Zone, drilling will follow-up on the first two holes drilled on the Slice Pond Conductor. Both holes intersected geochemically anomalous, altered, graphitic and sulphide-bearing basement lithologies accompanied by elevated uranium values below the unconformity. At the Maverick East Zone, follow-up drilling is planned where previously reported hole ML21-19 intersected a broad interval of uranium mineralization including
Moore Uranium Project Regional Grid Targets Map:
http://skyharbourltd.com/_resources/maps/Moore-Lake-Property-Wide.jpg
Jordan Trimble, President and CEO of Skyharbour Resources, states: “We are excited to be able to drill test some of our more regional targets facilitated by winter drilling conditions, as well as to follow up on further discoveries associated with the high grade Maverick structural corridor. Skyharbour offers strong discovery potential at its project base coupled with substantial upcoming news flow from the continued drilling at Moore as well as at partner-funded projects. Several of these partner companies have recently commenced drill programs including Azincourt Energy at the East Preston Project and Valor Resources at the Hook Lake Project, which brings the combined total drilling metreage being carried out currently by Skyharbour and partner companies to over 11,000 metres. With its project portfolio strategically located in one of the most geopolitically favourable mining jurisdictions globally in northern Saskatchewan, Skyharbour is well-positioned to benefit from the accelerating uranium market recovery with increasing demand in the backdrop of a strained supply side.”
Grid 19 Area - Slice Pond Target:
At the regional Grid 19 area, drilling has commenced on the north trending Slice Pond Conductor where an initial two holes (holes ML21-07 and -09) intersected highly encouraging altered, graphitic and sulphide-bearing basement lithologies in the summer of 2021. Drill hole ML21-07 was drilled in the central portion of the conductor and intersected a variably bleached and locally faulted sandstone column overlying a significant package of cordierite-bearing graphitic pelitic gneiss accompanied by faulting and sulphide-rich intervals. The sandstone and basement are enriched in B (=< 1,290 ppm), and there was an intercept of
Maverick East Target:
Drilling is planned for the northern edge of the Maverick East Zone as a follow up to hole ML21-19, which intersected a mineralized interval comprising 19.5 metres of
Moore Uranium Project Maverick East Zone Drilling Map:
https://www.skyharbourltd.com/_resources/images/Moore-2021-Maverick-East-Main-Maverick-Drilling.jpg
Viper Target Area:
Drilling is planned at the 525 target along the middle conductor trace in a portion of the Viper area which is located approx. 1.5 km NE of the Main Maverick Zone. Drill hole ML-525, drilled in 2005, intersected an interval of
Moore Uranium Project Overview:
In June 2016, Skyharbour secured an option to acquire Denison Mine's Moore Uranium Project, on the southeastern side of the Athabasca Basin, in northern Saskatchewan and has fulfilled its earn in. The project consists of 12 contiguous claims totaling 35,705 hectares located 42 kilometres northeast of the Key Lake mill, approx. 15 kilometres east of Denison’s Wheeler River project, and 39 kilometres south of Cameco’s McArthur River uranium mine. Unconformity-type uranium mineralization was discovered on the Moore Project at the Maverick Zone in April 2001. Historical drill highlights include
Moore Lake Uranium Project Geophysics Map:
http://skyharbourltd.com/_resources/maps/MooreLake-Basic-geo-revamp.jpg
Qualified Person:
The technical information in this news release has been prepared in accordance with the Canadian regulatory requirements set out in National Instrument 43-101 and reviewed and approved by David Billard, P.Geo., a Consulting Geologist for Skyharbour as well as a Qualified Person.
About Skyharbour Resources Ltd.:
Skyharbour holds an extensive portfolio of uranium exploration projects in Canada's Athabasca Basin and is well positioned to benefit from improving uranium market fundamentals with fourteen projects, nine of which are drill-ready, covering over 385,000 hectares of land. Skyharbour has acquired from Denison Mines, a large strategic shareholder of the Company, a
Skyharbour has a joint-venture with industry-leader Orano Canada Inc. at the Preston Project whereby Orano has earned a
Skyharbour has several active option partners including: ASX-listed Valor Resources on the Hook Lake Uranium Project whereby Valor can earn-in
Skyharbour's goal is to maximize shareholder value through new mineral discoveries, committed long-term partnerships, and the advancement of exploration projects in geopolitically favourable jurisdictions.
Skyharbour’s Uranium Project Map in the Athabasca Basin:
https://www.skyharbourltd.com/_resources/maps/SKY_SaskProject_Locator_20211126.jpg
To find out more about Skyharbour Resources Ltd. (TSX-V: SYH) visit the Company’s website at www.skyharbourltd.com.
SKYHARBOUR RESOURCES LTD.
“Jordan Trimble”
Jordan Trimble
President and CEO
For further information contact myself or:
Riley Trimble
Corporate Development and Communications
Skyharbour Resources Ltd.
Telephone: 604-687-3376
Toll Free: 800-567-8181
Facsimile: 604-687-3119
Email: info@skyharbourltd.com
NEITHER THE TSX VENTURE EXCHANGE NOR ITS REGULATION SERVICES PROVIDER ACCEPTS RESPONSIBILITY FOR THE ADEQUACY OR ACCURACY OF THE CONTENT OF THIS NEWS RELEASE.
The securities offered have not been, and will not be, registered under the United States Securities Act of 1933, as amended (the "U.S. Securities Act") or any U.S. state securities laws, and may not be offered or sold in the United States or to, or for the account or benefit of, United States persons absent registration or an applicable exemption from the registration requirements of the U.S. Securities Act and applicable U.S. state securities laws. This press release does not constitute an offer to sell or the solicitation of an offer to buy securities in the United States, nor in any other jurisdiction.
This release includes certain statements that may be deemed to be "forward-looking statements". All statements in this release, other than statements of historical facts, that address events or developments that management of the Company expects, are forward-looking statements, including the Private Placement. Although management believes the expectations expressed in such forward-looking statements are based on reasonable assumptions, such statements are not guarantees of future performance, and actual results or developments may differ materially from those in the forward-looking statements. The Company undertakes no obligation to update these forward-looking statements if management's beliefs, estimates or opinions, or other factors, should change. Factors that could cause actual results to differ materially from those in forward-looking statements, include market prices, exploration and development successes, regulatory approvals, continued availability of capital and financing, and general economic, market or business conditions. Please see the public filings of the Company at www.sedar.com for further information.
FAQ
What is the focus of Skyharbour Resources' winter 2022 drilling program?
How many drill holes are included in the winter 2022 program for Skyharbour?
What significant uranium mineralization has been found at the Maverick East Zone?
Is the Moore Uranium Project large?