Argentina Lithium Announces Accelerated Exploration Plan
- Accelerated exploration plans for 2024
- Major financing agreement with Stellantis N.V.
- Expansion of exploration program for pipeline projects
- CEO expects transformative year
- Funding secured for all planned activities
- None.
Miles Rideout, VP of Exploration for the Company stated, "Our 2023 field work focused on drilling Rincon West and was extremely successful in identifying lithium-rich brines and advancing the project. At the same time, we assembled the large Antofalla North property package adjacent and to the north of Albemarle Corp's lithium project and now that we are funded we will be as aggressive as possible to advance the project alongside Rincon West. While Antofalla North is undrilled, our previous CSAMT geophysics show conductive units in horizontal bedding, extending to approximately 500 m depth. Based on these results and historic prospective results reported from elsewhere on the salar, we hope to delineate another major source of lithium in brines at Antofalla. Our property package at Antofalla is more than twice as large as Rincon West, and exploration success here would be a breakthrough."
[Argentina Lithium cautions that proximity to a discovery, mineral resource, or mining operation does not indicate that mineralization will occur on the Company's property, and if mineralization does occur, that it will occur in sufficient quantity or grade that would result in an economic extraction scenario.]
The Company has also expanded the exploration program plans for its pipeline projects, Pocitos and Incahuasi. These are earlier stage and are generally expected to be advanced behind the work at the Rincon and Antofalla salars. However, with permits and funding secured, the Company is in the process of mobilizing a geophysics crew to the Pocitos Salar to begin a reconnaissance program of 170 line-km of TEM (Transient Electromagnetic) surveying on the 26,221 hectares of properties. This program at Pocitos is an increase of approximately
Nikolaos Cacos, CEO of Argentina Lithium commented, "We expect 2024 to be a transformative year for the Company, one in which we can significantly advance towards resource delineation at our two primary projects. We have cleared the biggest hurdle for any junior today, which is having financing secured for all the planned exploration activity, to the tune of up to
Rincon West Project
Following the completion of a successful 9-hole drill program on the Villanoveño II property earlier this year, the Company launched a new 5-hole exploration drill program (~ 1,700 m total) at the Rinconcita II property, where the second hole is now in progress. Permitting is underway for the third property, Paso de Sico, and once received the Company plans to execute a program of at least 6 drill holes (~2,100m). The Company is confident in the permitting process, having completed applications and successfully been awarded new permits for the Rinconcita II property of Rincon West as recently as this summer.
Following the drill programs at the Rincon West properties a series of rotary wells will be completed and pump tests executed, to provide high-quality data on porosity and permeability to support a mineral resource estimate. This work will require additional permits, which have been submitted. The exact number and timing of wells and tests will be determined based on the results of the drilling programs.
Antofalla North Project
Argentina Lithium plans to complete 110 line-km of TEM geophysics at Antofalla North Project covering approximately 16,620 hectares. This work will further map the basin and provide final targets for drilling of an initial 6 broadly spaced reconnaissance holes totaling approximately 2,400 metres to test for lithium brines. With positive results, the Company now envisages following this work with as many as 24 infill holes or approximately 7,200 m of drilling to fully test the property holdings.
Argentina Lithium is currently awaiting the issuance of environmental permits at Antofalla which will allow work to commence. The review process is well underway and the Company does not foresee any issues with its applications.
Pocitos and Incahuasi Projects
As indicated above, the Company is currently mobilizing a geophysics crew to the Pocitos Salar to execute 170 line-km of TEM surveys, to map the subsurface of properties for future drill program targeting.
In 2024, the Company expects to follow the Pocitos geophysics work with a survey at its Incahuasi salar properties. The planned program has been expanded by nearly
Frits Reidel, CPG is a Qualified Person as defined in National Instrument 43-101, and the Principal of Atacama Water, and is independent of Argentina Lithium. The disclosure in this news release has been reviewed and approved by Mr. Reidel.
Argentina Lithium & Energy Corp is focused on acquiring high quality lithium projects in
ON BEHALF OF THE BOARD
"Nikolaos Cacos"
_______________________________
Nikolaos Cacos, President, CEO and Director
Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.
This news release may contain forward-looking statements. Forward-looking statements address future events and conditions and therefore involve inherent risks and uncertainties. All statements, other than statements of historical fact, that address activities, events or developments the Company believes, expects or anticipates will or may occur in the future, including, without limitation, statements about the Company's plans for its mineral properties; the Company's business strategy, plans and outlooks; the future financial or operating performance of the Company; and future exploration and operating plans are forward-looking statements.
Forward-looking statements are subject to a number of risks and uncertainties that may cause the actual results of the Company to differ materially from those discussed in the forward-looking statements and, even if such actual results are realized or substantially realized, there can be no assurance that they will have the expected consequences to, or effects on, the Company. Factors that could cause actual results or events to differ materially from current expectations include, among other things: the impact of COVID-19; risks and uncertainties related to the ability to obtain, amend, or maintain licenses, permits, or surface rights; risks associated with technical difficulties in connection with mining activities; and the possibility that future exploration, development or mining results will not be consistent with the Company's expectations. Actual results may differ materially from those currently anticipated in such statements. Readers are encouraged to refer to the Company's public disclosure documents for a more detailed discussion of factors that may impact expected future results. The Company undertakes no obligation to publicly update or revise any forward-looking statements, unless required pursuant to applicable laws. We advise U.S. investors that the SEC's mining guidelines strictly prohibit information of this type in documents filed with the SEC. U.S. investors are cautioned that mineral deposits on adjacent properties are not indicative of mineral deposits on our properties.
View original content to download multimedia:https://www.prnewswire.com/news-releases/argentina-lithium-announces-accelerated-exploration-plan-301992909.html
SOURCE Argentina Lithium & Energy Corp.
FAQ
What are Argentina Lithium's accelerated exploration plans for 2024?
What is the significance of the financing agreement with Stellantis N.V.?
What are the expansion plans for the Pocitos and Incahuasi projects?
What does CEO Nikolaos Cacos expect for 2024?