Trigon Provides Additional Details of Kombat Trend Drilling, Namibia

Figure 1: Map of the East 400 Program Area Showing Location of Holes 4C, 4D, 5C and 6C in East 400 Program Area Verification holes 4C, 4D, 5C and 6C are in the heart of the East 400 mineralized zone and should be considered infill holes confirming mineralization between holes previously drilled. The results reported here are notable because of the length of the intercepts above the projected reserve grade.
Highlights of the Drill Results
Hole 4C (358 azimuth, -58 dip)
- 13m,
Hole 4D (356 azimuth, -55 dip)
- 3m,
Hole 5C (2 azimuth, -85 dip)
- 10m,
Hole 6C (352 azimuth, -52 dip)
- 12m,
The holes reported are from drilling testing gaps in the known mineralization previously thought to be barren. Holes 4C, 4D, 5C and 6C are verification holes testing continuity between areas previously drilled. The results are some of the longest intercepts drilled from surface and with both sulfide and oxide mineralization.
The assays have been prepared and classified by Trigon Mining (
Table of Drilling Highlights
Hole ID |
X |
Y |
Depth |
Azimuth |
Dip |
Significant and Selected Intersections |
Date of News Release |
CenMid01 |
74588.147 |
253430.329 |
36.20 |
350.1 |
-77.0
|
5.1m of
6.9m of
|
|
CenMid01A |
74759.065 |
253547.147 |
41.69 |
180.0 |
-76.8 |
11.0m of
|
|
CenMid02 |
74649.512 |
253475.398 |
58.08 |
201.6 |
-67.4 |
9.0m of
|
|
CenMid04 |
74679.864 |
253481.351 |
77.65 |
177.8 |
-61.7 |
6.0m of
2m of
|
|
Infill05 |
74813.689 |
253508.664 |
76.00 |
186.6 |
-70.7 |
2m of
4.0m of 0.8 copper from 28.0m
7.0m of
|
|
Infill06 |
74829.500 |
253512.902 |
79.15 |
181.0 |
-73.2 |
6.0m of
10.0m of
|
|
E400-5B |
74965.000 |
253526.000 |
83.19 |
180.0 |
-50.0 |
4.0 m at 7.67 % copper and 10.73 g/t silver from 35.0m
3.0 m at 0.98 % Cu from 67.0 m.
|
|
E400-07A |
74995.713 |
253539.191 |
88.23 |
180.0 |
-70.0 |
2.0 m at 1.19 % copper and 9.98g/t silver from 33.0m.
|
|
E400-07B |
74994.991 |
253524.036 |
72.85 |
167.9 |
-49.0 |
4.0m of
3.0m or 1.02 copper and 4.19g/t silver from 42.0m.
|
|
E400-07C |
74995.000 |
253545.000 |
93.85 |
180.0 |
-55.0 |
6.0m of
|
|
CenEast 00 |
74752.736 |
253494.518 |
112.38 |
184.8 |
-71.1 |
19m at
3m at
|
|
Hole V01 |
74989.941 |
253533.340 |
78.30 |
172.7 |
-58.8 |
7m at
|
|
Hole V03 |
74974.992 |
253535.389 |
114.30 |
183.5 |
-53.3 |
47m at
|
|
E400-02A |
74917.375 |
253527.117 |
112.35 |
181 |
-71.8
|
8m,
|
|
E400-02B |
74917.444 |
253526.135 |
114.85 |
172.7 |
-58.8 |
9m at
11m at
|
|
E400-04A |
74949.328 |
253533.278 |
73.20 |
184 |
-43.2 |
5m at
|
|
E400-04B |
74950.352 |
253518.725 |
84.85 |
172 |
-49.4
|
17m at
|
|
E400-04C |
253,476 |
1,603 |
61.2 |
358 |
-58 |
13m,
|
|
E400-04D |
253,503 |
1,608 |
51.9 |
356 |
-55 |
3m,
|
|
E400-05C |
253,489 |
1,609 |
76.0 |
2 |
-85 |
10m,
|
|
E400-06C |
253,477 |
1,607 |
87.8 |
352 |
-52 |
12m,
|
|
Quality Assurance & Quality Control (QA/QC):
All sample assay results have been monitored through the Company's quality assurance / quality control (QA / QC) program following E2941 − 21 Standard Practices for Extraction of Elements from Ores and Related Metallurgical Materials by 4 acid Digestion with ICP-OES finish. Drill core was sent to an independent laboratory, African Laboratory Specialists Namibia (“ALS”), for analysis. ALS is an independent laboratory, located in Kombat,
Qualified Person
The technical information presented in this press release has been reviewed and approved for disclosure by
Renmark Financial to Host Virtual Non-Deal Roadshows this Week
Trigon will be participating in two live Virtual Non-Deal Roadshow sessions on
The presentation will feature
Click a link below to register:
Please access this link using the latest version of
Trigon is a publicly traded Canadian exploration and development company with its core business focused on copper and silver holdings in mine-friendly African jurisdictions. Currently the company has operations in
Cautionary Notes
Neither
This news release may contain forward-looking statements. These statements include statements regarding the Project, the mineralization of the Project, the Company’s exploration plans and results thereof, the prospectivity of the Project, the economic viability of the Project, the Company’s ability to restart operations and the Company’s future plans and objectives. These statements are based on current expectations and assumptions that are subject to risks and uncertainties. Actual results could differ materially because of factors discussed in the management discussion and analysis section of our interim and most recent annual financial statements or other reports and filings with the
View source version on businesswire.com: https://www.businesswire.com/news/home/20230222005633/en/
For further information:
+1 647 276 6002
jed.richardson@trigonmetals.com
Website: www.trigonmetals.com
Source: