STOCK TITAN

Patriot Battery Metals Commences 2025 Winter Drill Program at the Shaakichiuwaanaan Property

Rhea-AI Impact
(Moderate)
Rhea-AI Sentiment
(Neutral)
Tags

Patriot Battery Metals has initiated its 2025 winter drill program at the Shaakichiuwaanaan Property in Quebec, targeting 15,000 meters of drilling from January to April. The program focuses on three main objectives: extending the high-grade Vega Zone westward, testing the CV5 to CV13 pegmatite corridor, and completing condemnation drilling for waste rock pile locations.

The property hosts a consolidated Mineral Resource of 80.1 Mt at 1.44% Li2O Indicated and 62.5 Mt at 1.31% Li2O Inferred. Up to four drill rigs will be deployed, with two already operational. The company has partnered with Cree-owned Forage Construction Muskw for drilling services.

Core assay results for 98 drill holes (31,513 m) from fall 2024 are pending, with results expected in the coming weeks. The company remains on track to deliver a Feasibility Study and maiden Ore Reserve Estimate in Q3 2025.

Patriot Battery Metals ha avviato il suo programma di perforazione invernale 2025 presso il Shaakichiuwaanaan Property in Quebec, puntando a 15.000 metri di perforazione da gennaio ad aprile. Il programma si concentra su tre obiettivi principali: estendere verso ovest l'alta qualità della Vega Zone, testare il corridoio di pegmatite CV5 a CV13 e completare le perforazioni di condanna per le posizioni delle pile di roccia di scarto.

La proprietà ospita una Risorsa Minerale consolidata di 80,1 Mt al 1,44% Li2O Indicato e 62,5 Mt al 1,31% Li2O Inferred. Fino a quattro trivelle saranno schierate, con due già operative. L'azienda ha collaborato con la Crees Forage Construction Muskw per i servizi di perforazione.

I risultati delle analisi dei campioni di nucleo per 98 fori di perforazione (31.513 m) dell'autunno 2024 sono in attesa, con risultati previsti nelle prossime settimane. L'azienda è ancora sulla buona strada per fornire uno Studio di Fattibilità e una Stima di Riserva Mineraria pregiata nel Q3 2025.

Patriot Battery Metals ha iniciado su programa de perforación invernal 2025 en la Shaakichiuwaanaan Property en Quebec, con un objetivo de 15,000 metros de perforación desde enero hasta abril. El programa se centra en tres objetivos principales: extender hacia el oeste la alta ley de la Vega Zone, probar el corredor de pegmatita CV5 a CV13 y completar la perforación de condena para los lugares de pilas de roca de desecho.

La propiedad alberga un Recurso Mineral consolidado de 80.1 Mt al 1.44% Li2O Indicado y 62.5 Mt al 1.31% Li2O Inferido. Se desplegarán hasta cuatro equipos de perforación, con dos ya en funcionamiento. La empresa se ha asociado con la Constructora Forage Muskw de propiedad Cree para los servicios de perforación.

Los resultados de los ensayos de núcleo para 98 agujeros de perforación (31,513 m) del otoño de 2024 están pendientes, y se esperan resultados en las próximas semanas. La empresa sigue en camino de entregar un Estudio de Viabilidad y una Estimación de Reserva Mineraria inaugural en el Q3 de 2025.

Patriot Battery Metals는 퀘벡의 Shaakichiuwaanaan Property에서 2025년 겨울 시추 프로그램을 시작했으며, 1월부터 4월까지 15,000미터의 시추를 목표로 하고 있습니다. 이 프로그램은 세 가지 주요 목표에 초점을 맞추고 있습니다: 고품질의 베가 존을 서쪽으로 연장하기, CV5에서 CV13까지의 페그마타이트 복도 테스트, 그리고 폐기물 바위 더미 위치에 대한 종결 시추를 완료하는 것입니다.

해당 부지는 80.1 Mt at 1.44% Li2O Indicated62.5 Mt at 1.31% Li2O Inferred의 통합 자원을 보유하고 있습니다. 최대 네 대의 시추 장비가 배치되며, 그 중 두 대는 이미 운영 중입니다. 회사는 크리 소속의 포리지 건설 뭇크와 협력하여 시추 서비스를 제공하고 있습니다.

2024년 가을에 98개의 시추 홀(31,513 m)에 대한 핵심 분석 결과가 대기 중이며, 결과는 향후 몇 주 내에 발표될 예정입니다. 이 회사는 2025년 3분기에 타당성 연구와 최초의 광산 매장량 추정을 제공할 계획입니다.

Patriot Battery Metals a lancé son programme de forage d'hiver 2025 sur la Shaakichiuwaanaan Property au Québec, visant 15 000 mètres de forage de janvier à avril. Le programme se concentre sur trois objectifs principaux : étendre la zone de haute qualité Vega vers l'ouest, tester le corridor de pegmatite CV5 à CV13 et compléter le forage de condamnation pour les emplacements des tas de roches de déchets.

La propriété abrite une ressource minérale consolidée de 80,1 Mt à 1,44 % Li2O indiquée et 62,5 Mt à 1,31 % Li2O inférée. Jusqu'à quatre foreuses seront déployées, dont deux sont déjà opérationnelles. L'entreprise s'est associée à Forage Construction Muskw, propriété des Cris, pour les services de forage.

Les résultats des analyses de cœur pour 98 forages (31 513 m) de l'automne 2024 sont en attente, avec des résultats attendus dans les semaines à venir. L'entreprise reste sur la bonne voie pour livrer une étude de faisabilité et une première estimation des réserves minérales au troisième trimestre 2025.

Patriot Battery Metals hat sein Winterbohrprogramm 2025 im Shaakichiuwaanaan Property in Quebec gestartet und plant, von Januar bis April 15.000 Meter zu bohren. Das Programm konzentriert sich auf drei Hauptziele: die hochgradige Vega Zone nach Westen auszudehnen, den Pegmatitkorridor von CV5 bis CV13 zu testen und die Verdachtsbohrungen für die Standorte der Abfallhalden abzuschließen.

Das Grundstück beherbergt eine konsolidierte Mineralressource von 80,1 Mt bei 1,44% Li2O angezeigter Resourcen und 62,5 Mt bei 1,31% Li2O geschätzter Resourcen. Es werden bis zu vier Bohranlagen eingesetzt, von denen bereits zwei in Betrieb sind. Das Unternehmen hat sich mit dem von den Cree betriebenen Forage Construction Muskw für Bohrdienstleistungen zusammengetan.

Die Ergebnisse der Kernanalysen für 98 Bohrlöcher (31.513 m) aus dem Herbst 2024 stehen noch aus, die Ergebnisse werden in den kommenden Wochen erwartet. Das Unternehmen liegt weiterhin im Zeitplan, um im 3. Quartal 2025 eine Machbarkeitsstudie und eine erste Schätzung der Erzmassen zu liefern.

Positive
  • Substantial mineral resource base of 80.1 Mt at 1.44% Li2O Indicated and 62.5 Mt at 1.31% Li2O Inferred
  • Strategic location with year-round access and proximity to hydroelectric power
  • Feasibility Study and maiden Ore Reserve Estimate on track for Q3 2025
  • Extensive drilling program (15,000m) targeting resource expansion
Negative
  • Reduced drilling intensity compared to 2024
  • 98 drill holes from fall 2024 still pending assay results

Highlights

  • The 2025 winter drill program at the Shaakichiuwaanaan Property is well underway, targeting a minimum of 15,000 m over the January to April period.
  • The winter drill program has three primary objectives:
    • Extend the high-grade Vega Zone (CV13 Pegmatite) westward along an interpreted structural corridor toward the CV12 Pegmatite,
    • Test the highly prospective CV5 to CV13 pegmatite corridor, and
    • Complete condemnation drilling at two proposed waste rock pile locations in support of the ongoing Feasibility Study at the CV5 Pegmatite.
  • Up to four (4) drill rigs are anticipated to support the winter program.
  • Majority of the drill program anticipated to be ground supported, through a combination of all-season and winter road.
  • Core assay results remain to be reported for 98 drill holes (31,513 m) from the CV5 Pegmatite completed in fall 2024.
  • The Company is on track to provide a Feasibility Study and maiden Ore Reserve Estimate to the market in the third quarter of 2025.

Darren L. Smith, Executive and Vice President of Exploration for the Company, comments: "2025 will be a less drill intensive year compared to 2024; however, exploration drilling along the CV Trend remains a key component of the Company's flowthrough spend strategy as the CV5 Pegmatite advances through development. The primary focus for the winter drill program will be further delineation and extension of the CV13 Spodumene Pegmatite, including the high-grade Vega Zone, and supporting the Feasibility and development needs for the CV5 Spodumene Pegmatite."

VANCOUVER, BC, Feb. 9, 2025 /PRNewswire/ - February 10, 2025 – Sydney, Australia

Patriot Battery Metals Inc. (the "Company" or "Patriot") (TSX: PMET) (ASX: PMT) (OTCQX: PMETF) (FSE: R9GA) is pleased to announce it has commenced the 2025 winter drill program at its wholly owned Shaakichiuwaanaan Property (the "Property" or "Project"), located in the Eeyou Istchee James Bay region of Quebec, Canada.

The Shaakichiuwaanaan Property hosts a consolidated (CV5 &) Mineral Resource Estimate1 of 80.1 Mt at 1.44% Li2O Indicated and 62.5 Mt at 1.31% Li2O Inferred. The CV5 Spodumene Pegmatite is accessible year-round by all-season road and is situated approximately 14 km from a major hydroelectric powerline corridor. The CV13 Spodumene Pegmatite is situated <3 km along geological trend of the CV5 Spodumene Pegmatite.

The 2025 winter drill program commenced in late January and is planned to continue through mid-April for an estimated total of 15,000 m of NQ size coring. The program will have three primary objectives (Figure 1):

  1. Extend the high-grade Vega zone westward, along an interpreted structural corridor, toward the CV12 Pegmatite.
  2. Test the highly prospective CV13 to CV5 pegmatite corridor.
  3. Complete condemnation drilling at two proposed waste rock pile locations in support of the ongoing Feasibility Study at the CV5 Pegmatite.

A total of two (2) drill rigs will target the westward extension of the high-grade Vega-Zone and the <3 km corridor between the CV13 and CV5 spodumene pegmatites that remains to be drill tested. Both rigs commenced drilling in late January and are ground supported using a combination of all-season and winter road (Figure 2, Figure 3, and Figure 4). The overarching objective is mineral resource expansion and to demonstrate connectivity between spodumene pegmatite clusters.

An additional two (2) rigs will commence drilling later in February and target condemnation (eliminating the potential for mineralisation) within the area north of the CV5 Pegmatite at the proposed locations of two waste rock piles (Figure 1). The Company has already completed surface sampling and mapping over these areas and anticipate the condemnation drilling to conclude both sites are suitable for such infrastructure development.

The Company has engaged Forage Construction Muskw Inc. ("Muskw"), a Cree owned enterprise, to carry out the diamond drilling services. Muskw was formed in 2024 as a Joint Venture between Forage Fusion Drilling and Saskounan Construction.  

The Company remains on track to provide a Feasibility Study and maiden Ore Reserve Estimate to the market in the third quarter of 2025, in addition to an updated Mineral Resource Estimate. Additionally, core assay results remain to be reported for 98 drill holes (31,513 m) from the CV5 Pegmatite completed in fall 2024. Announcement of these results, as well as that of the 2024 summer surface field program, are anticipated to be reported in the coming weeks.

_________________________________

1 Shaakichiuwaanaan (CV5 & CV13) Mineral Resource Estimate (80.1 Mt at 1.44% Li2O and 163 ppm Ta2O5 Indicated, and 62.5 Mt at 1.31% Li2O and 147 ppm Ta2O5 ppm Inferred) is reported at a cut-off grade of 0.40% Li2O (open-pit), 0.60% Li2O (underground CV5), and 0.80% Li2O (underground CV13) with an Effective Date of August 21, 2024 (through drill hole CV24-526). Mineral Resources are not Mineral Reserves as they do not have demonstrated economic viability.

Figure 1: Highly prospective lithium pegmatite corridors anticipated to be drill tested in 2025, as well as primary areas for condemnation drilling. (CNW Group/Patriot Battery Metals Inc.)

Figure 2: Mobilizing drill rig at the start of the winter road (western end of the CV5 Pegmatite). (CNW Group/Patriot Battery Metals Inc.)

Figure 3: Mobilization of equipment along the winter road connecting the CV5 and CV13 pegmatites. (CNW Group/Patriot Battery Metals Inc.)

Figure 4: Drill rig on pad and ready to commence coring. (CNW Group/Patriot Battery Metals Inc.)

Qualified/Competent Person

The information in this news release that relates to exploration results for the Shaakichiuwaanaan Property is based on, and fairly represents, information compiled by Mr. Darren L. Smith, M.Sc., P.Geo., who is a Qualified Person as defined by National Instrument 43-101 – Standards of Disclosure for Mineral Projects, and member in good standing with the Ordre des Géologues du Québec (Geologist Permit number 01968), and with the Association of Professional Engineers and Geoscientists of Alberta (member number 87868). Mr. Smith has reviewed and approved the technical information in this news release.

Mr. Smith is an Executive and Vice President of Exploration for Patriot Battery Metals Inc. and holds common shares and options in the Company.

Mr. Smith has sufficient experience, which is relevant to the style of mineralization, type of deposit under consideration, and to the activities being undertaken to qualify as a Competent Person as described by the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (the JORC Code). Mr. Smith consents to the inclusion in this news release of the matters based on his information in the form and context in which it appears.

About Patriot Battery Metals Inc.

Patriot Battery Metals Inc. is a hard-rock lithium exploration company focused on advancing its district-scale 100%-owned Shaakichiuwaanaan Property (formerly known as Corvette) located in the Eeyou Istchee James Bay region of Quebec, Canada, which is accessible year-round by all-season road and is proximal to regional powerline infrastructure. The Shaakichiuwaanaan Mineral Resource1, which includes the CV5 & CV13 spodumene pegmatites, totals 80.1 Mt at 1.44% Li2O Indicated, and 62.5 Mt at 1.31% Li2O Inferred, and ranks as the largest lithium pegmatite resource in the Americas, and the 8th largest lithium pegmatite resource in the world.

A Preliminary Economic Assessment ("PEA") was announced for the CV5 Pegmatite August 21, 2024, and highlights it as a potential North American lithium raw materials powerhouse. The PEA outlines the potential for a competitive and globally significant high-grade lithium project targeting up to ~800 ktpa spodumene concentrate using a simple Dense Media Separation ("DMS) only process flowsheet.

1 Shaakichiuwaanaan (CV5 & CV13) Mineral Resource Estimate (80.1 Mt at 1.44% Li2O and 163 ppm Ta2O5 Indicated, and 62.5 Mt at 1.31% Li2O and 147 ppm Ta2O5 ppm Inferred) is reported at a cut-off grade of 0.40% Li2O (open-pit), 0.60% Li2O (underground CV5), and 0.80% Li2O (underground CV13) with an Effective Date of August 21, 2024 (through drill hole CV24-526). Mineral Resources are not Mineral Reserves as they do not have demonstrated economic viability.

For further information, please contact us at info@patriotbatterymetals.com or by calling +1 (604) 279-8709, or visit www.patriotbatterymetals.com. Please also refer to the Company's continuous disclosure filings, available under its profile at www.sedarplus.ca and www.asx.com.au, for available exploration data.

This news release has been approved by the Board of Directors.

"KEN BRINSDEN"                                          

Kenneth Brinsden, President, CEO, & Managing Director

Disclaimer for Forward-looking Information

This news release contains "forward-looking information" or "forward-looking statements" within the meaning of applicable securities laws and other statements that are not historical facts. Forward-looking statements are included to provide information about management's current expectations and plans that allows investors and others to have a better understanding of the Company's business plans and financial performance and condition.

All statements, other than statements of historical fact included in this news release, regarding the Company's strategy, future operations, technical assessments, prospects, plans and objectives of management are forward-looking statements that involve risks and uncertainties. Forward-looking statements are typically identified by words such as "plan", "expect", "estimate", "intend", "anticipate", "believe", or variations of such words and phrases or statements that certain actions, events or results "may", "could", "would", "might" or "will" be taken, occur or be achieved. Forward-looking statements in this release include, but are not limited to, statements on the Feasibility Study, including the timing of its release and the content thereof, the maiden ore reserve, the unreported results from the 2024 summer-fall drill campaign, and the objectives and anticipated results of the 2025 drill program.

Forward-looking information is based upon certain assumptions and other important factors that, if untrue, could cause the actual results, performance or achievements of the Company to be materially different from future results, performance or achievements expressed or implied by such information or statements. There can be no assurance that such information or statements will prove to be accurate. Key assumptions upon which the Company's forward-looking information is based include, without limitation, that proposed exploration and mineral resource estimate work on the Property will continue as expected, the accuracy of reserve and resource estimates, the classification of resources between inferred and indicated and the assumptions on which the reserve and resource estimates are based, long-term demand for spodumene supply, and that exploration and development results continue to support management's current plans for Property development and expectations for the Project.

Readers are cautioned that the foregoing list is not exhaustive of all factors and assumptions which may have been used. Forward-looking statements are also subject to risks and uncertainties facing the Company's business, any of which could have a material adverse effect on the Company's business, financial condition, results of operations and growth prospects. Some of the risks the Company faces and the uncertainties that could cause actual results to differ materially from those expressed in the forward-looking statements include, among others, the ability to execute on plans relating to the Company's Project, including the timing thereof. In addition, readers are directed to carefully review the detailed risk discussion in the Company's most recent Annual Information Form filed on SEDAR+, which discussion is incorporated by reference in this news release, for a fuller understanding of the risks and uncertainties that affect the Company's business and operations.

Although the Company believes its expectations are based upon reasonable assumptions and has attempted to identify important factors that could cause actual actions, events or results to differ materially from those described in forward-looking statements, there may be other factors that cause actions, events or results not to be as anticipated, estimated or intended. There can be no assurance that forward-looking information will prove to be accurate, as actual results and future events could differ materially from those anticipated in such information. As such, these risks are not exhaustive; however, they should be considered carefully. If any of these risks or uncertainties materialize, actual results may vary materially from those anticipated in the forward-looking statements found herein. Due to the risks, uncertainties and assumptions inherent in forward-looking statements, readers should not place undue reliance on forward-looking statements.

Forward-looking statements contained herein are presented for the purpose of assisting investors in understanding the Company's business plans, financial performance and condition and may not be appropriate for other purposes.

The forward-looking statements contained herein are made only as of the date hereof. The Company disclaims any intention or obligation to update or revise any forward-looking statements, whether as a result of new information, future events or otherwise, except to the extent required by applicable law. The Company qualifies all of its forward-looking statements by these cautionary statements.

Competent Person Statement (ASX Listing Rule 5.23)

The mineral resource estimate in this release was reported by the Company in accordance with ASX Listing Rule 5.8 on August 5, 2024. The Company confirms that, as of the date of this announcement, it is not aware of any new information or data verified by the competent person that materially affects the information included in the announcement and that all material assumptions and technical parameters underpinning the estimates in the announcement continue to apply and have not materially changed. The Company confirms that, as at the date of this announcement, the form and context in which the competent person's findings are presented have not been materially modified from the original market announcement. 

The production target referred to in this release was reported by the Company in accordance with ASX Listing Rule 5.16 on August 21, 2024. The Company confirms that, as of the date of this announcement, all material assumptions and technical parameters underpinning the production target in the original announcement continue to apply and have not materially changed.

Cision View original content to download multimedia:https://www.prnewswire.com/news-releases/patriot-battery-metals-commences-2025-winter-drill-program-at-the-shaakichiuwaanaan-property-302371841.html

SOURCE Patriot Battery Metals Inc.

FAQ

What are the key objectives of PMETF's 2025 winter drill program?

The program has three main objectives: extending the high-grade Vega Zone westward, testing the CV5 to CV13 pegmatite corridor, and completing condemnation drilling at two proposed waste rock pile locations.

What is the current mineral resource estimate for PMETF's Shaakichiuwaanaan Property?

The property has a consolidated mineral resource of 80.1 Mt at 1.44% Li2O Indicated and 62.5 Mt at 1.31% Li2O Inferred, with an effective date of August 21, 2024.

When will PMETF release its Feasibility Study and maiden Ore Reserve Estimate?

The company plans to release its Feasibility Study and maiden Ore Reserve Estimate in the third quarter of 2025.

How many drill holes from PMETF's fall 2024 program are awaiting assay results?

98 drill holes totaling 31,513 meters from the CV5 Pegmatite completed in fall 2024 are still awaiting assay results.

How many drill rigs will PMETF deploy for the 2025 winter program?

Up to four drill rigs will be deployed, with two initially targeting the Vega Zone extension and two more starting in February for condemnation drilling.

PATRIOT BATTERY METALS

OTC:PMETF

PMETF Rankings

PMETF Latest News

PMETF Stock Data

337.86M
89.74M
2.09%
4.11%
Other Industrial Metals & Mining
Basic Materials
Link
Canada
Vancouver