PAN GLOBAL INTERSECTS 1.6% COPPER OVER 9.7 METERS CONFIRMING CONTINUITY OF LA ROMANA COPPER-TIN-SILVER DISCOVERY OVER 1.4KM
- None.
- None.
TSXV: PGZ | OTCQX: PGZFF | FSE: 2EU
The significance of these drill results:
- The near surface copper mineralization is extended more than 50m west and is now continuous for a total strike length of 1.4km, remaining open for further expansion along strike to the northwest and down-dip
- A new higher grade (
1% -plus copper) sector has been identified with grades ranging as high as7.7% copper over 1.7m. This mineralization is coincident with a 290m x 90m down-hole electromagnetic (DHEM) target, providing a strong guide to potential extensions for future drilling
Drilling Highlights:
- LRD173: 9.7m at
1.69% CuEq1 (1.61% Cu,0.02% Sn, 3.8 g/t Ag) from 99m, including 5.7m at2.70% CuEq1 (2.58% Cu,0.03% Sn, 6.2 g/t Ag); - LRD177: 8m at
1.48% CuEq1 (1.21% Cu,0.10% Sn, 1.5 g/t Ag) from 55m, including 3.4m at2.85% CuEq1 (2.72% Cu,0.04% Sn, 3.2 g/t Ag); - LRD179: 18.1m at
0.65% CuEq1 (0.61% Cu,0.01% Sn, 1.5g/t Ag) from 108m, including 6.1m at1.50% CuEq1 (1.42% Cu,0.02% Sn, 3.5g/t Ag); - LRD172: 12m at
0.74% CuEq1 (0.60% Cu,0.05% Sn, 1.4 g/t Ag) from 76m, including 6m at1.36% CuEq1 (1.09% Cu,0.10% Sn, 2.6 g/t Ag); - Drilling to resume in 2024, including five holes in the current plan at La Romana
"These drill results highlight a significant new zone of higher-grade copper at La Romana that remains wide open to the northwest. Drilling continues to grow the La Romana deposit, demonstrating good continuity of the mineralization over 1.4 kilometers strike length, and from surface to more than 200m down-dip. We look forward to resuming drilling shortly and advancing the growing pipeline of high priority exploration targets in the Escacena Project, particularly the copper/gold discovery at Cañada Honda and high-priority Bravo target following access," said Tim Moody, President and CEO of Pan Global.
"Ongoing exploration continues to demonstrate multi-discovery potential with numerous targets not yet tested. The Project is located in a tier one mining jurisdiction, in close proximity with producing copper mines and advanced development projects, and excellent infrastructure," said Mr. Moody.
Drillhole locations are shown in Figure 1 below. Drillhole assay results are summarized in Table 1 and collar details are presented in Table 2 below.
The main La Romana copper mineralization occurs in two highly continuous layers, Zone B and Zone C, commencing from surface or directly below a thin cover of post-mineral sediments. The mineralization includes primary chalcopyrite and minor bornite, overprinted at shallow depths by secondary/supergene copper sulphide (chalcocite) and an overlying oxide zone with local native copper and copper oxides. The tin mineralization is cassiterite, the preferred mineral for commercial extraction.
Hole ID | From | To | Interval | CuEq1 | Cu | Sn | Ag | Au | Pb | Zn | True | |
m | m | m | % | % | % | g/t | g/t | ppm | ppm | (m) | ||
LRD172 | 76.00 | 88.00 | 12.00 | 0.74 | 0.60 | 0.05 | 1.4 | 0.02 | 8 | 86 | 12.0 | |
including | 82.00 | 88.00 | 6.00 | 1.36 | 1.09 | 0.10 | 2.6 | 0.03 | 14 | 109 | 6.0 | |
including | 84.00 | 87.00 | 3.00 | 1.55 | 1.28 | 0.09 | 3.3 | 0.03 | 9 | 116 | 3.0 | |
and | 123.00 | 135.00 | 12.00 | 0.20 | 0.15 | 0.02 | 0.3 | 0.01 | 4 | 75 | 12.0 | |
LRD173 | 99.00 | 108.70 | 9.70 | 1.69 | 1.61 | 0.02 | 3.8 | 0.02 | 10 | 112 | 7.9 | |
including | 103.00 | 108.70 | 5.70 | 2.70 | 2.58 | 0.03 | 6.2 | 0.02 | 14 | 147 | 4.6 | |
Including | 107.00 | 108.70 | 1.70 | 7.93 | 7.73 | 0.04 | 19.1 | 0.08 | 35 | 313 | 1.4 | |
and | 142.00 | 146.00 | 4.00 | 0.36 | 0.29 | 0.03 | 0.7 | 0.02 | 8 | 68 | 3.3 | |
LRD174 | 86.00 | 94.00 | 8.00 | 0.55 | 0.52 | 0.01 | 1.1 | 0.01 | 2.5 | 63 | 7.5 | |
including | 91.00 | 93.00 | 2.00 | 1.33 | 1.26 | 0.02 | 2.3 | 0.01 | 4 | 90 | 1.9 | |
and | 134.00 | 139.00 | 5.00 | 0.49 | 0.27 | 0.08 | 0.5 | 0.04 | 10 | 76 | 4.7 | |
and | 165.00 | 166.00 | 1.00 | 1.99 | 1.95 | 0.01 | 3.5 | 0.02 | 31 | 202 | 0.94 | |
LRD175 | 55.00 | 68.00 | 13.00 | 0.14 | 0.11 | 0.01 | 0.4 | 0.0 | 3 | 62 | 13.0 | |
LRD176 | 27.00 | 30.00 | 3.00 | 0.47 | 0.44 | 0.01 | 0.9 | 0.01 | 42 | 91 | 2.1 | |
and | 95.00 | 101.30 | 6.30 | 0.39 | 0.35 | 0.01 | 0.5 | 0.02 | 10 | 69 | 4.5 | |
LRD177 | 4.00 | 12.00 | 8.00 | 0.25 | 0.23 | 0.0 | 0.2 | 0.0 | 1 | 112 | 3.4 | |
and | 55.00 | 63.00 | 8.00 | 1.48 | 1.21 | 0.10 | 1.5 | 0.02 | 16 | 93 | 3.4 | |
including | 56.00 | 59.4 | 3.40 | 2.85 | 2.72 | 0.04 | 3.2 | 0.04 | 23 | 118 | 1.4 | |
Including | 58.20 | 59.4 | 1.20 | 7.50 | 7.24 | 0.08 | 7.7 | 0.08 | 42 | 198 | 0.5 | |
LRD178 | 114.20 | 115.10 | 0.90 | 2.20 | 1.95 | 0.08 | 5.6 | 0.08 | 63 | 120 | 0.64 | |
LRD179 | 43.00 | 44.00 | 1.00 | 0.17 | 0.10 | 0.01 | 8.4 | 0.03 | 1.55 % | 3.37 % | 0.7 | |
and | 108.00 | 126.10 | 18.10 | 0.65 | 0.61 | 0.01 | 1.5 | 0.01 | 6 | 76 | 12.8 | |
including | 120.00 | 126.10 | 6.10 | 1.50 | 1.42 | 0.02 | 3.5 | 0.01 | 9 | 102 | 4.3 | |
and | 162.00 | 166.00 | 4.00 | 0.23 | 0.21 | 0.01 | 0.5 | 0.01 | 4 | 41 | 2.8 | |
and | 171.00 | 173.00 | 2.00 | 0.74 | 0.63 | 0.04 | 1.9 | 0.02 | 26 | 79 | 1.4 | |
and | 206.00 | 207.00 | 1.00 | 0.99 | 0.75 | 0.09 | 1.2 | 0.05 | 16 | 93 | 0.7 | |
LRD180 | 119.00 | 132.00 | 13.00 | 0.66 | 0.60 | 0.02 | 1.2 | 0.01 | 10 | 86 | 9.8 | |
including | 127.00 | 131.00 | 4.00 | 1.55 | 1.45 | 0.03 | 2.8 | 0.02 | 17 | 122 | 3.0 |
1 Copper Equivalent = CuEq. CuEq is calculated using Cu, Sn, and Ag grades. Metallurgical recoveries include |
Hole ID | Easting 2 | Northing 2 | Azimuth (o) | Dip (o) | Depth (m) |
LRD172 | 735839 | 4152864 | 210 | -45 | 203.4 |
LRD173 | 735840 | 4152867 | 190 | -75 | 200.8 |
LRD174 | 735839 | 4152868 | 230 | -50 | 182.7 |
LRD175 | 735721 | 4152836 | 210 | -45 | 89.5 |
LRD176 | 735722 | 4152837 | 0 | -90 | 159 |
LRD177 | 735719 | 4152837 | 100 | -50 | 109.7 |
LRD178 | 735704 | 4152871 | 0 | -90 | 190.5 |
LRD179 | 735870 | 4152842 | 0 | -90 | 224.7 |
LRD180 | 735829 | 4152904 | 180 | -75 | 229.8 |
2 Coordinate system: UTM29N ERTS89 |
The Escacena Project comprises a large, contiguous, 5,760-hectare land package controlled
Pan Global Resources Inc. is actively targeting copper-rich mineral deposits, given copper's compelling supply-demand fundamentals and outlook for strong long-term prices as a critical metal for global electrification and energy transition. The Company's flagship Escacena Project is located in the prolific Iberian Pyrite Belt in southern
Core size was HQ (63mm) and all samples were ½ core. Nominal sample size was 1m core length and ranged from 0.5 to 2m. Sample intervals were defined using geological contacts with the start and end of each sample physically marked on the core. Diamond blade core cutting and sampling was supervised at all times by Company staff. Duplicate samples of ¼ core were taken approximately every 30 samples and Certified Reference materials inserted every 25 samples in each batch.
Samples were delivered to ALS laboratory in
James Royall, Vice President Exploration for Pan Global Resources and a qualified person as defined by National Instrument 43-101, has approved the scientific and technical information for this media release. Mr. Royall is not independent of the Company.
Statements which are not purely historical are forward-looking statements, including any statements regarding beliefs, plans, expectations, or intentions regarding the future. It is important to note that actual outcomes and the Company's actual results could differ materially from those in such forward-looking statements. The Company believes that the expectations reflected in the forward-looking information included in this media release are reasonable, but no assurance can be given that these expectations will prove to be correct and such forward-looking information should not be unduly relied upon. Risks and uncertainties include, but are not limited to, economic, competitive, governmental, environmental, and technological factors that may affect the Company's operations, markets, products, and prices. Readers should refer to the risk disclosures outlined in the Company's Management Discussion and Analysis of its audited financial statements filed with the British Columbia Securities Commission.
The forward-looking information contained in this media release is based on information available to the Company as of the date of this media release. Except as required under applicable securities legislation, the Company does not intend, and does not assume any obligation, to update this forward-looking information.
NEITHER TSX VENTURE EXCHANGE NOR ITS REGULATION SERVICES PROVIDER (AS THAT TERM IS DEFINED IN THE POLICIES OF THE TSX VENTURE EXCHANGE) ACCEPTS RESPONSIBILITY FOR THE ADEQUACY OR ACCURACY OF THIS RELEASE.
View original content to download multimedia:https://www.prnewswire.com/news-releases/pan-global-intersects-1-6-copper-over-9-7-meters-confirming-continuity-of-la-romana-copper-tin-silver-discovery-over-1-4km-302028139.html
SOURCE Pan Global Resources Inc.
FAQ
What are the recent drillhole results announced by Pan Global Resources Inc. (PGZ)?
What is the significance of the recent drill results for Pan Global Resources Inc. (PGZ)?
What are the drilling highlights from the recent results announced by Pan Global Resources Inc. (PGZ)?
What are the future plans for drilling by Pan Global Resources Inc. (PGZ)?