Pan American Silver Reports Additional High-Grade Drill Results From the La Colorada Skarn Project
La Colorada Skarn drill holes May 2023 (Graphic: Business Wire)
The most recent drill results include eight holes that were drilled to follow up on high-grade drill results reported in news releases dated July 21, 2022 and November 1, 2022. Hole D-96-10-22 returned two broad zones of mineralisation over 64 metres at 391 g/t Ag,
"These new drill hole results both extend the 902 zone and confirm that there are multiple zones of higher grade within the limestone and skarn, which align with surrounding porphyry intrusives and epithermal veins," said Christopher Emerson, Pan American's Vice President Exploration and Geology. "We have now drilled over 20 holes into this area, which remains open to the west and northwest. The 2023 infill and exploration program of 28,000 metres from surface and underground drilling stations is currently underway.”
Drill highlights include:
-
D-96-10-22: 64.30 m at 391 g/t Ag,
0.13% Cu,10.83% Pb and8.50% Zn, including 23.25 m at 914 g/t Ag,0.19% Cu,25.19% Pb and16.73% Zn and 135.70 m at 37 g/t Ag,0.14% Cu,1.13% Pb and6.42% Zn -
D-96-12-23: 109.55 m at 233 g/t Ag,
0.10% Cu,6.62% Pb and7.32% Zn, including 44.20 m at 487 g/t Ag,0.15% Cu,15.46% Pb and10.12% Zn -
D-96-09-22: 72.60 m at 98 g/t Ag,
0.07% Cu,0.85% Pb and4.11% Zn and 26.95 m at 162 g/t Ag,0.05% Cu,3.51% Pb and3.52% Zn and 21.20 m at 123 g/t Ag,0.11% Cu,3.53% Pb and8.63% Zn -
D-96-11-22: 17.05 m at 165 g/t Ag,
0.12% Cu,4.37% Pb and9.33% Zn -
U-138-22: 71.35 m at 193 g/t Ag,
0.15% Cu,10.82% Pb and9.27% Zn, including 57.95 m at 231 g/t Ag,0.17% Cu,13.11% Pb and11.01% Zn -
U-112-22: 53.15 m at 141 g/t Ag,
0.06% Cu,5.84% Pb and5.46% Zn, including 15.15 m at 243 g/t Ag,0.08% Cu,11.31% Pb and8.28% Zn -
D-15-02-22: 16.85 m at 121 g/t Ag,
0.28% Cu,4.60% Pb and9.58% Zn -
D-93-06-23: 21.45 m at 304 g/t Ag,
0.17% Cu,4.75% Pb and2.55% Zn and 143.3 m at 27 g/t Ag,0.10% Cu,2.93% Pb and4.68% Zn and 74.20 m at 49 g/t Ag,0.25% Cu,1.50% Pb and4.36% Zn
Eight of the 15 drill holes reported in this news release are recent infill and extension holes that add definition to the high-grade areas, which are now drilled at roughly 30 metre spacing. Five infill drill holes: U-112-22, U-138-22, D-96-09-22, D-96-10-22 and D-93-06-23, confirm internal continuity of grade, similar to previously reported drill holes. The high-grade footprint has been extended approximately 50 metres to the northwest from the limit of prior drilling with recent holes D-96-11-22 and D-96-12-23 returning significant silver and base metal grades. This area remains open to the northwest where the ongoing drill program will continue to test further extension of the zone over the next few months from surface and underground drilling stations.
Exploration drilling in the 903 East mineralised zone was reduced in the fourth quarter of 2022 with a new focus on the high-grade area to the west. Recent results from S-101-22, the most southeast drill hole in the 903 zone, intercepts skarn mineralisation approximately 250 metres south of previous drilling. Drill hole D-09-04-22 intercepted mineralisation to the southeast of the central zone.
Plan view of the La Colorada Skarn drill holes referenced in this news release
La Colorada Skarn - summary of drill results
The following table provides the drill results for the La Colorada Skarn deposit included in this news release.
Previous drill results not included in this table have been disclosed in Pan American’s news releases, which are available, together with cross sections, plans and images of the skarn mineralised core, on our website at: https://www.panamericansilver.com/operations/north-and-central-america/la-colorada-skarn/
Hole No. |
From (m) |
To (m) |
Interval (m)(1) |
Ag g/t |
Cu % |
Pb % |
Zn % |
D-09-04-22 |
576.20 |
642.45 |
66.25 |
23 |
0.13 |
0.22 |
2.01 |
And |
742.50 |
755.10 |
12.60 |
29 |
0.27 |
1.28 |
2.54 |
And |
828.00 |
857.95 |
29.95 |
47 |
0.15 |
2.16 |
3.91 |
D-15-02-22 |
739.20 |
757.35 |
18.15 |
59 |
0.46 |
1.29 |
3.53 |
And |
794.80 |
801.65 |
6.85 |
46 |
0.46 |
1.50 |
4.92 |
And |
1281.00 |
1293.75 |
12.75 |
57 |
0.30 |
1.99 |
2.44 |
And |
1494.40 |
1504.95 |
10.55 |
33 |
0.18 |
2.63 |
3.41 |
And |
1543.35 |
1560.20 |
16.85 |
121 |
0.28 |
4.60 |
9.58 |
And |
1593.05 |
1617.70 |
24.65 |
30 |
0.11 |
3.23 |
4.80 |
And |
1664.00 |
1698.95 |
34.95 |
39 |
0.23 |
0.47 |
3.39 |
And |
1772.65 |
1791.60 |
18.95 |
68 |
0.32 |
1.04 |
5.43 |
D-96-09-22 |
979.30 |
984.30 |
5.00 |
106 |
0.03 |
1.28 |
2.65 |
And |
1104.10 |
1125.30 |
21.20 |
123 |
0.11 |
3.53 |
8.63 |
And |
1172.70 |
1199.65 |
26.95 |
162 |
0.05 |
3.51 |
3.52 |
And |
1275.05 |
1347.65 |
72.60 |
98 |
0.07 |
0.85 |
4.11 |
Include |
1275.05 |
1294.50 |
19.45 |
141 |
0.08 |
2.53 |
9.81 |
And |
1382.95 |
1392.00 |
9.05 |
71 |
0.09 |
1.01 |
2.60 |
And |
1404.65 |
1426.80 |
22.15 |
43 |
0.15 |
2.25 |
2.82 |
And |
1472.55 |
1516.10 |
43.55 |
55 |
0.17 |
1.11 |
3.48 |
D-96-10-22 |
1122.45 |
1186.75 |
64.30 |
391 |
0.13 |
10.83 |
8.50 |
Include |
1144.30 |
1167.55 |
23.25 |
914 |
0.19 |
25.19 |
16.73 |
And |
1209.70 |
1232.45 |
22.75 |
154 |
0.03 |
2.23 |
0.95 |
And |
1314.00 |
1327.30 |
13.30 |
27 |
0.23 |
2.47 |
5.03 |
And |
1357.90 |
1493.60 |
135.70 |
37 |
0.14 |
1.13 |
6.42 |
D-96-11-22 |
1103.55 |
1120.60 |
17.05 |
165 |
0.12 |
4.37 |
9.33 |
And |
1152.80 |
1159.20 |
6.40 |
134 |
0.05 |
5.27 |
6.92 |
And |
1221.75 |
1231.65 |
9.90 |
56 |
0.05 |
1.63 |
4.18 |
And |
1371.95 |
1392.45 |
20.50 |
152 |
0.02 |
0.90 |
2.80 |
And |
1412.35 |
1426.90 |
14.55 |
79 |
0.06 |
0.59 |
1.88 |
S-101-22 |
748.05 |
775.15 |
27.10 |
125 |
0.06 |
0.99 |
2.70 |
S-92-22 |
641.20 |
655.70 |
14.50 |
279 |
0.06 |
0.61 |
0.58 |
U-112-22 |
420.90 |
436.15 |
15.25 |
80 |
0.03 |
1.34 |
1.21 |
And |
742.90 |
796.05 |
53.15 |
141 |
0.06 |
5.84 |
5.46 |
Includes |
749.15 |
764.30 |
15.15 |
243 |
0.08 |
11.31 |
8.28 |
And |
828.75 |
853.45 |
24.70 |
66 |
0.07 |
0.56 |
3.46 |
And |
946.10 |
979.05 |
32.95 |
25 |
0.08 |
1.68 |
3.85 |
U-138-22 |
580.60 |
584.65 |
4.05 |
122 |
0.08 |
2.67 |
5.32 |
And |
710.75 |
782.10 |
71.35 |
193 |
0.15 |
10.82 |
9.27 |
Includes |
718.95 |
776.90 |
57.95 |
231 |
0.17 |
13.11 |
11.01 |
And |
955.55 |
995.85 |
40.30 |
49 |
0.14 |
0.41 |
1.09 |
U-96-22 |
49.30 |
65.30 |
16.00 |
215 |
0.29 |
2.39 |
5.08 |
And |
518.75 |
569.90 |
51.15 |
28 |
0.14 |
1.12 |
2.08 |
D-96-12-23 |
1185.90 |
1295.45 |
109.55 |
233 |
0.10 |
6.62 |
7.32 |
Includes |
1185.90 |
1230.10 |
44.20 |
487 |
0.15 |
15.46 |
10.12 |
And |
1371.50 |
1389.50 |
18.00 |
54 |
0.03 |
1.35 |
2.56 |
U-73-22 |
193.40 |
215.95 |
22.55 |
48 |
0.14 |
2.25 |
8.82 |
And |
255.10 |
264.15 |
9.05 |
21 |
0.10 |
1.15 |
5.54 |
And |
321.55 |
362.35 |
40.80 |
22 |
0.08 |
1.46 |
3.01 |
And |
382.30 |
401.70 |
19.40 |
34 |
0.09 |
1.46 |
2.77 |
U-87-22 |
422.65 |
454.85 |
32.20 |
36 |
0.13 |
2.89 |
5.35 |
D-93-06-23 |
963.5 |
984.95 |
21.45 |
304 |
0.17 |
4.75 |
2.55 |
And |
1001.6 |
1006.65 |
5.05 |
17 |
0.07 |
1.74 |
3.77 |
And |
1009.55 |
1040.75 |
31.2 |
40 |
0.02 |
2.66 |
3.48 |
And |
1170.2 |
1313.5 |
143.3 |
27 |
0.10 |
2.93 |
4.68 |
And |
1369.55 |
1374.65 |
5.1 |
22 |
0.06 |
3.68 |
5.93 |
And |
1482 |
1556.2 |
74.2 |
49 |
0.25 |
1.50 |
4.36 |
U-13-23 |
540.25 |
547.15 |
6.9 |
44 |
0.01 |
2.75 |
2.41 |
And |
562 |
569.1 |
7.1 |
60 |
0.03 |
3.25 |
5.33 |
And |
635.15 |
653 |
17.85 |
120 |
0.02 |
1.99 |
2.62 |
(1) True widths of the mineralised intervals are unknown at this time. |
La Colorada Skarn - drill hole collar information
Drill Hole ID |
Type |
East Local |
North Local |
Elevation |
Length (m) |
Azimuth Avg (0) |
Dip Avg |
D-09-04-22 |
Exploration |
5490.2 |
4962.7 |
2517.2 |
612.0 |
330.6 |
-81.5 |
D-15-02-22 |
Infill |
5227.9 |
5223.1 |
2559.4 |
1093.4 |
335.6 |
-67.4 |
D-96-09-22 |
Infill |
4654.7 |
5286.4 |
2506.4 |
751.7 |
103.6 |
-84.9 |
D-96-10-22 |
Infill |
4654.7 |
5286.4 |
2506.4 |
811.3 |
51.4 |
-78.3 |
D-96-11-22 |
Infill |
4654.7 |
5286.4 |
2506.4 |
809.5 |
342.0 |
-83.4 |
D-96-12-23 |
Infill |
4654.7 |
5286.4 |
2506.4 |
901.4 |
21.0 |
-78.4 |
S-101-22 |
Exploration |
6019.3 |
5160.0 |
2489.7 |
1781.9 |
140.1 |
-89.6 |
S-92-22 |
Infill |
5807.2 |
5769.5 |
2590.8 |
1716.0 |
106.2 |
-84.6 |
U-112-22 |
Infill |
4496.3 |
5331.6 |
2070.0 |
1179.2 |
77.2 |
-74.7 |
U-138-22 |
Infill |
4495.9 |
5331.7 |
2070.0 |
1006.4 |
74.4 |
-75.3 |
U-73-22 |
Geotech |
5258.4 |
5416.2 |
2001.9 |
456.0 |
7.4 |
-67.6 |
U-87-22 |
Geotech |
5258.4 |
5416.6 |
2002.6 |
461.7 |
29.5 |
-73.9 |
U-96-22 |
Geotech |
5259.7 |
5417.0 |
1999.0 |
728.6 |
50.8 |
-69.0 |
D-93-06-23 |
Infill |
4926.28 |
5166.06 |
2469.65 |
842.0 |
305.5 |
-77.0 |
U-13-23 |
Infill |
4842.62 |
5323.92 |
1995.97 |
971.3 |
127.1 |
-79.0 |
Total metres |
14,122.2 |
|
|
General Notes with Respect to Technical Information
Grades are shown as contained metal before mill recoveries are applied. All samples provided in this news release were assayed by ALS Global,
See the Company's Annual Information Form dated February 22, 2023, available at www.sedar.com for further information concerning QAQC and data verification matters, and for a detailed description of known legal, political, environmental, and other risks that could materially affect the Company's business and the potential development of the Company's mineral reserves and mineral resources.
Technical information contained in this news release with respect to Pan American has been reviewed and approved by Christopher Emerson, FAusIMM, Vice President Business Development and Geology, and Martin Wafforn, P.Eng., Senior Vice President Technical Services and Process Optimization, each of whom is a Qualified Person for the purposes of National Instrument 43-101 - Standards of Disclosure for Mineral Projects (“NI 43-101”).
Pan American Silver Corp. is authorized by The Association of Professional Engineers and Geoscientists of the Province of
About Pan American Silver
Pan American is a leading producer of precious metals, operating silver and gold mines in
Cautionary Note Regarding Forward-Looking Statements and Information
Certain of the statements and information in this news release constitute "forward-looking statements" within the meaning of the United States Private Securities Litigation Reform Act of 1995 and "forward-looking information" within the meaning of applicable Canadian provincial securities laws. All statements, other than statements of historical fact, are forward-looking statements or information. Forward-looking statements or information in this news release relate to, among other things: the extent of, and success related to any future exploration or development programs, including with respect to the Skarn exploration program at
These forward-looking statements and information reflect Pan American’s current views with respect to future events and are necessarily based upon a number of assumptions that, while considered reasonable by Pan American, are inherently subject to significant operational, business, economic and regulatory uncertainties and contingencies. These assumptions include: the world-wide economic and social impact of COVID-19 and the extent of any impacts related to the COVID-19 pandemic; tonnage of ore to be mined and processed; ore grades and recoveries; prices for silver, gold and base metals remaining as estimated; currency exchange rates remaining as estimated; capital, decommissioning and reclamation estimates; our mineral reserve and resource estimates and the assumptions upon which they are based; prices for energy inputs, labour, materials, supplies and services (including transportation); no labour-related disruptions at any of our operations; no unplanned delays or interruptions in scheduled production; all necessary permits, licenses and regulatory approvals for our operations are received in a timely manner; our ability to secure and maintain title and ownership to properties and the surface rights necessary for our operations; and our ability to comply with environmental, health and safety laws. The foregoing list of assumptions is not exhaustive.
Pan American cautions the reader that forward-looking statements and information involve known and unknown risks, uncertainties and other factors that may cause actual results and developments to differ materially from those expressed or implied by such forward-looking statements or information contained in this news release and Pan American has made assumptions and estimates based on or related to many of these factors. Such factors include, without limitation: the duration and effects of COVID-19, and any other pandemics on our operations and workforce, and the effects on global economies and society; fluctuations in silver, gold and base metal prices; fluctuations in prices for energy inputs, labour, materials, supplies and services (including transportation); fluctuations in currency markets (such as the PEN, MXN, ARS, BOB, GTQ, CAD, CLP, and BRL versus the USD); operational risks and hazards inherent with the business of mining (including environmental accidents and hazards, industrial accidents, equipment breakdown, unusual or unexpected geological or structural formations, cave-ins, flooding and severe weather); risks relating to the credit worthiness or financial condition of suppliers, refiners and other parties with whom Pan American does business; inadequate insurance, or inability to obtain insurance, to cover these risks and hazards; employee relations; relationships with, and claims by, local communities and indigenous populations; our ability to obtain all necessary permits, licenses and regulatory approvals in a timely manner; changes in laws, regulations and government practices in the jurisdictions where we operate, including environmental, export and import laws and regulations; changes in national and local government, legislation, taxation, controls or regulations and political, legal or economic developments in
View source version on businesswire.com: https://www.businesswire.com/news/home/20230502006278/en/
Siren Fisekci
VP, Investor Relations & Corporate Communications
604-806-3191
ir@panamericansilver.com
Source: Pan American Silver