O3 Mining Confirms Auriferous Corridors In The Sediments At The Ludovick Sector, Horizon Project
O3 Mining has announced assay results from its 3,053-meter winter drill campaign at the Ludovick Sector of the Horizon Project. Key intercepts include 0.8 g/t Au over 9.1 meters, 4.6 g/t Au over 1.5 meters, and 4.5 g/t Au over 1.2 meters. The campaign focused on auriferous corridors along the Parfouru Fault corridor. CEO José Vizquerra emphasized the sector's exploration potential due to its proximity to established mining sites. The drill program identified two gold-bearing horizons, suggesting a correlation between gold grades and sulfide content, opening further exploration opportunities. The results align with historical data, highlighting significant exploration potential.
- 3,053-meter winter drill campaign completed.
- Key intercepts: 0.8 g/t Au over 9.1 meters, 4.6 g/t Au over 1.5 meters, 4.5 g/t Au over 1.2 meters.
- Drill campaign focused on auriferous corridors along a five-kilometer stretch of the Parfouru Fault corridor.
- Two gold-bearing horizons identified, suggesting correlation between gold grades and sulfide content.
- Proximity to established mining sites enhances exploration potential.
- Potential for geophysical-induced polarization surveys to identify best areas for next drilling.
- Results show narrow intercepts with variable gold grades.
- Minimal historical drilling conducted along the five-kilometer stretch of the Parfouru Fault, indicating prior exploration data.
- Uncertainty remains as intercepts have not been correlated to individual vein domains.
Highlights:
- 0.8 g/t Au over 9.1 metres in hole O3HR-24-016 at a vertical depth of 233.0 metres, including 5.3 g/t over 0.5 metres on SW-1 sector;
- 4.6 g/t Au over 1.5 metres in hole O3HR-24-010 at a vertical depth of 71.0 metres, in the Ludovick zone;
- 4.5 g/t Au over 1.2 metres in hole O3HR-24-013 at a vertical depth of 131.0 metres, on SW-2 sector.
O3 Mining's President and Chief Executive Officer, Mr. José Vizquerra commented: "The winter drill campaign at the Ludovick Sector was an opportunity for us to follow up on historic auriferous drill intercepts along a five kilometres long segment of the Parfouru Fault corridor. The results from the drill campaign are encouraging and highlight the significant exploration potential of the Ludovick Sector. We believe that the Ludovick Sector is strategically positioned for potential development due to its proximity and similarities in mineralization with established mining sites in the Timiskaming Group. We will continue advancing our exploration efforts at the Horizon Project to support our diverse pipeline of exploration projects."
O3 Mining's initial drill program at the Ludovick Sector supports the presence of gold in two northwest-south-east trending horizons approximately 300 metres apart. Both horizons dip 70 to 80 degrees to the north-east. The first zone relates to the historical Ludovick showing, which is associated with the regional Parfouru fault zone at the contact between the mafic volcanics of the Hébécourt Formation (Blake River Group) and the wackes of the Cadillac Group. The structure consists of a narrow, well-defined, and continuous shear containing 2
Evidence of gold mineralization along the Parfouru Fault zone within the sedimentary basin opens up promising exploration potential within the sector, beyond the historical Ludovick zone itself. There has been minimal historical drilling conducted along the five kilometres stretch of the Parfouru Fault present on the Horizon Project. The mineralization within the Temiskaming Conglomerates is of particular interest because of the width of the mineralized envelope and the correlation between gold grades and the amount of sulfides. This characteristic offers the possibility to conduct a geophysical-induced polarization survey along the five kilometres trend to rapidly identify the best areas to focus on during the next drilling program.
Table 1: Drill Hole Intercepts. See Table 2 below for full technical parameters.
Hole | From | To | Grade | Core | Vertical | Metal Factor | Zone |
O3HR-24-008 | 118.0 | 119.0 | 2.9 | 1.0 | 82.0 | 2.9 | Ludovick |
O3HR-24-009 | 22.5 | 24.0 | 1.2 | 1.5 | 15.0 | 1.8 | SW-1 |
O3HR-24-010 | 81.0 | 82.5 | 4.6 | 1.5 | 71.0 | 6.9 | Ludovick |
O3HR-24-011 | 132.2 | 136.7 | 1.2 | 4.5 | 120.0 | 5.3 | SW-1 |
O3HR-24-013 | 202.8 | 204.0 | 4.5 | 1.2 | 131.0 | 5.4 | SW-2 |
and | 224.4 | 227.5 | 0.9 | 3.1 | 144.0 | 2.8 | |
and | 233.5 | 235.0 | 1.5 | 1.5 | 149.0 | 2.3 | |
O3HR-24-016 | 316.1 | 325.2 | 0.8 | 9.1 | 233.0 | 7.2 | SW-1 |
Including | 316.1 | 316.6 | 5.3 | 0.5 | 230.0 | 2.7 |
Table 2: Technical parameters of holes of the 2024 campaign at Ludovick Sector
Hole | Azimuth | Dip (°) | Start Depth (m) | End Depth (m) | Length | UTM Zone 18 | UTM Zone18 |
O3HR-24-006 | 206 | -46 | 0 | 234 | 234 | 270656 | 5337882 |
O3HR-24-007 | 210 | -53 | 0 | 300 | 300 | 270743 | 5337844 |
O3HR-24-008 | 209 | -45 | 0 | 216 | 216 | 271678 | 5337691 |
O3HR-24-009 | 14 | -45 | 0 | 327 | 327 | 270484 | 5337748 |
O3HR-24-010 | 208 | -64 | 0 | 237 | 237 | 271678 | 5337691 |
O3HR-24-011 | 14 | -66 | 0 | 357 | 357 | 270484 | 5337748 |
O3HR-24-012 | 208 | -45 | 0 | 285 | 285 | 271680 | 5337819 |
O3HR-24-013 | 199 | -45 | 0 | 288 | 288 | 271483 | 5337343 |
O3HR-24-014 | 199 | -45 | 0 | 264 | 264 | 270546 | 5337700 |
O3HR-24-015 | 201 | -45 | 0 | 180 | 180 | 271342 | 5337261 |
O3HR-24-016 | 24 | -50 | 0 | 365 | 365 | 270546 | 5337700 |
Qualified Person
The scientific and technical content of this news release has been reviewed and approved by Mrs. Élise Bourgault, P.Geo (OGQ #894), Project Geologist of O3 Mining, who is a "qualified person" within the meaning of National Instrument 43-101 – Standards of Disclosure for Mineral Projects ("NI 43-101").
Quality Assurance/Quality Control
Intercepts occur within geological confines of major zones but have not been correlated to individual vein domains at this time. Half-core samples are shipped to Agat laboratory in
Commercial certified standard material and blanks are systematically inserted by O3 Mining's geologists into the sample chain after every 18 core samples as part of the quality assurance and quality control ("QA/QC") program. Third-party assays are submitted to other designated laboratories for
Cautionary Note Regarding Forward-Looking Information
This news release contains "forward-looking information" within the meaning of the applicable Canadian securities legislation that is based on expectations, estimates, projections, and interpretations as at the date of this news release. Forward-looking statements include, but are not limited to, statements with respect to planned and ongoing drilling, the exploration potential of the Ludovick Sector, the ability to further development the Ludovick Sector, the significance of drill results, the ability to continue drilling, the impact of drilling on the definition of any resource, the ability to incorporate new drilling in an updated technical report and resource modelling. Any statement that involves discussions with respect to predictions, expectations, interpretations, beliefs, plans, projections, objectives, assumptions, future events or performance (often but not always using phrases such as "expects", or "does not expect", "is expected", "interpreted", "management's view", "anticipates" or "does not anticipate", "plans", "budget", "scheduled", "forecasts", "estimates", "believes" or "intends" or variations of such words and phrases or stating that certain actions, events or results "may" or "could", "would", "might" or "will" be taken to occur or be achieved) are not statements of historical fact and may be forward-looking information and are intended to identify forward-looking information. Except for statements of historical fact relating to the Corporation, certain information contained herein constitutes forward-looking statements Forward-looking information is based on estimates of management of the Corporation, at the time it was made, involves known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of the companies to be materially different from any future results, performance or achievements expressed or implied by such forward-looking information. Such factors include, among others, risks relating to the drill results at the Horizon Project; the significance of drill results; the ability of drill results to accurately predict mineralization; the ability of any material to be mined in a matter that is economic. Although the forward-looking information contained in this news release is based upon what management believes, or believed at the time, to be reasonable assumptions, the parties cannot assure shareholders and prospective purchasers of securities that actual results will be consistent with such forward-looking information, as there may be other factors that cause results not to be as anticipated, estimated or intended, and neither the Corporation nor any other person assumes responsibility for the accuracy and completeness of any such forward-looking information. The Corporation believes that this forward-looking information is based on reasonable assumptions, but no assurance can be given that these expectations will prove to be correct and such forward-looking statements included in this press release should not be unduly relied upon. The Corporation does not undertake, and assumes no obligation, to update or revise any such forward-looking statements or forward-looking information contained herein to reflect new events or circumstances, except as may be required by law. These statements speak only as of the date of this news release.
Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this news release. No stock exchange, securities commission or other regulatory authority has approved or disapproved the information contained herein.
View original content to download multimedia:https://www.prnewswire.com/news-releases/o3-mining-confirms-auriferous-corridors-in-the-sediments-at-the-ludovick-sector-horizon-project-302154690.html
SOURCE O3 Mining Inc.
FAQ
What were the key assay results of O3 Mining's drill campaign at Ludovick Sector?
When did O3 Mining announce the results from the Ludovick Sector drill campaign?
What is the significance of the Parfouru Fault corridor for O3 Mining's exploration?
What does the proximity of Ludovick Sector to established mining sites imply?
What future exploration methods did O3 Mining indicate for the Ludovick Sector?