Nevada Silver Corporation Commences Drilling at the Emily Manganese Project, Minnesota, USA
Nevada Silver Corporation (OTCQB: NVDSF) has announced that its Minnesota subsidiary, North Star Manganese Inc., has received all necessary approvals and commenced drilling at the Emily Manganese Project in Minnesota. This project covers 291 acres with potential access to over 500 acres, situated in the Cuyuna Iron Range, known for its rich manganese deposits. The estimated mineral resources include 5.68 million tonnes of manganese with grades of 19.2% Mn and 23.02% Fe. A total of 27 drill holes are planned to verify previous mineralized intersections. The company aims to become a key domestic producer of high-purity manganese.
- Commencement of drilling at the Emily Manganese Project, indicating progress in project development.
- Estimated Indicated Mineral Resource of 5.68 million tonnes with 19.2% manganese, showcasing high-quality deposits.
- Potential for significant production of manganese, critical for lithium-ion batteries, offering a strategic market opportunity.
- None.
TORONTO, ON / ACCESSWIRE / February 14, 2023 / Nevada Silver Corporation ("NSC" or the "Company") (TSXV:NSC)(OTCQB:NVDSF) a US-based mineral development company with manganese and silver projects geared to supporting the transition to clean energy, is pleased to announce that the Company's Minnesota subsidiary, North Star Manganese Inc ("NSM") has received all necessary approvals and has commenced drilling at its Emily Manganese Project ("Emily" or the "Project"), Minnesota, USA.
The Emily Project is located in the Cuyuna Iron Range of central Minnesota, USA (Figure 1), an area with a rich mining history and supported by well-established local infrastructure, a skilled mining workforce and abundant power and gas.
Figure 1. The Emily Project is part of the Emily District of the Cuyuna Iron Range in Crow Wing County, Central Minnesota. The Emily District contains the highest-grade source of Manganese in North America.

The Emily Manganese Project is comprised of two blocks of private lands totaling 291 acres of mineral rights with potential access to contiguous land within a footprint exceeding 500 acres, as shown in Figure 2 overleaf. The Project area has been previously drilled by Pickands Mather and US Steel in the 1950s and 1960s, and by Cooperative Mineral Resources in 2012 and 2013.
The estimated Indicated Mineral Resource of 5.68Mt of
Figure 2. Location map showing current land under NSC control, bedrock in and around the Emily Project area, as well as historic drill holes by various parties (Peterson 2019). The Emily Project resources (Table 1) are based on drill holes located within the red circle.

Table 1. NI 43-101 compliant Indicated and Inferred Mineral Resource estimate.

The resource estimate includes drilling results from seven (7) diamond core drill holes completed during two separate drilling programs (2011 and 2012), these holes are located within the red circled area in Figure 1.
Planned Drilling Program
Twenty-seven diamond core verification drill holes are planned. The program is intended to confirm Mn-Fe mineralized drill intersections reported by other companies2 within the Emily Project area and to extend the area of known mineralization.
Historical reported drill intersections within the planned program include:
- PM 303 (22.9m @
21.34% Mn) including (10.7m @29.83% Mn) - USS 18709 (114.3m @
19.74% Mn) including (24.4m @35.11% Mn) and (15.2m @43.16% Mn) - USS 18712 (65.5m @
17.96% Mn) including (19.8m @35.34% Mn) - CMR AC-02-11 (10.2m @
29.84% Mn) - CMR VC-01-11 (32.0m @
17.71% Mn) including (15.8m @25.77% Mn) and (9.0m @34.59% Mn)
NSC's drilling will investigate extensions to the deposit and provide fresh samples for metallurgy and mineralogy studies as well as material and data for groundwater, geotechnical and processing investigations.
Timberline Drilling Inc. (Virginia, MN) has mobilized a drill rig to Emily and drilling is expected to commence this month. Access and site preparation for 27 drill pads has been completed by Radotich Enterprises. Geologic work is being managed by Big Rock Exploration LLC (Minneapolis, MN) and environmental work is being managed by Barr Engineering Company (Minneapolis, MN).
1The Emily Manganese Project's NI 43-101 Mineral Resource Estimate is available on SEDAR at www.SEDAR.com and is posted on the Company's website at www.nevadasilvercorp.com. The Mineral Resource Estimate incorporates drilling results from two separate drilling programs in 2011 and 2012 for seven diamond drill core holes using an inverse distance squared method and evaluated at
2 Pickands Mather Company (PM); US Steel company Oliver Mining Company (USS); and Cooperative Mineral Resources (CMR).
Qualified Person
The scientific and technical data contained in this news release was reviewed and approved by Ian James Pringle PhD, who is a Qualified Person under National Instrument 43-101 Standards of Disclosure for Mineral Projects.
About Nevada Silver Corporation
Nevada Silver Corporation (TSXV:NSC) (OTCQB:NVDSF) is a U.S.-based mineral development company with manganese and silver projects geared to supporting the transition to clean energy. NSC's principal asset is the Emily Manganese Project in Minnesota, which has been the subject of considerable technical studies, with US
NSC will seek shareholder approval to change its name to Electric Metals USA Limited at the Company's Annual General Meeting in May 2023.
Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.
For further Information please contact:
Gary Lewis, Group CEO & Director: (647) 846 5299 - gl@nevadasilvercorp.com
Forward-Looking Statements: Information set forth in this news release may involve forward-looking statements under applicable securities laws. The forward-looking statements contained herein are expressly qualified in their entirety by this cautionary statement. The forward-looking statements included in this document are made as of the date of this document and Nevada Silver Corporation disclaims any intention or obligation to update or revise any forward-looking statements, whether as a result of new information, future events or otherwise, except as expressly required by applicable securities legislation. Although management believes that the expectations represented in such forward-looking statements are reasonable, there can be no assurance that such expectations will prove to be correct. This news release does not constitute an offer to sell or solicitation of an offer to buy any securities that may be described herein and accordingly undue reliance should not be put on such.
SOURCE: Nevada Silver Corporation
View source version on accesswire.com:
https://www.accesswire.com/739244/Nevada-Silver-Corporation-Commences-Drilling-at-the-Emily-Manganese-Project-Minnesota-USA
FAQ
What are the recent developments for Nevada Silver Corporation (NVDSF)?
What is the estimated mineral resource at the Emily Manganese Project?
How many drill holes are planned for the Emily Manganese Project?