Noram Receives Results for CVZ-70: High of 1930 ppm Intersection of 443 ft (135.0 m) Averaging 968 ppm Lithium
Noram Lithium Corp. announced the successful completion of core hole CVZ-70 in their Clayton Valley Lithium Project, reaching a depth of 463 feet and intersecting a total thickness of 443 feet of lithium-bearing material. The weighted average lithium concentration was reported at 968.0 ppm, with higher values in certain intervals. This accomplishment marks the first hole in their 12-hole Phase VI drilling program, aimed at upgrading resources. CEO Sandy MacDougall emphasized the commitment to sustainability and shareholder value as the company progresses towards a Pre-Feasibility Study in 2022.
- Total thickness of 443 ft intersected with 968.0 ppm weighted average lithium concentration.
- First successful hole of the 12-hole Phase VI drilling program.
- Intended upgrade of substantial Inferred Resource to Indicated category.
- None.
VANCOUVER, BC / ACCESSWIRE / April 14, 2022 / Sandy MacDougall, CEO of Noram Lithium Corp. ("Noram" or the "Company") (TSXV:NRM)(OTCQB:NRVTF)(Frankfurt:N7R) is pleased to announce the successful completion of CVZ-70 and release of the final assay results. The Company completed core hole CVZ-70 at a depth of 463 feet (141.1 m). An interval thickness of 443 ft (135.0 m) was intersected from 20 ft (6.1 m) to 463 ft (141.1 m) which encompasses the entire core hole. The weighted average lithium values present were as follows:
Depth of Interval Intersection | Total thickness | Weighted Average Lithium (ppm) |
20 ft to 462 ft (6.1 m to 141.1 m) | 443.0 ft (135.0 m) | 968.0 ppm |
110 ft to 330 ft (33.5 m to 100.6 m) | 220.0 ft (67.1 m) | 1267.3 ppm |
110 ft to 463 ft (33.5 m to 141.1 m) | 363.0 ft (110.6 m) | 1067.9 ppm |
"CVZ-70 is the first hole in Noram's 12-hole Phase VI drilling program. The hole clearly shows the consistently high lithium grades across this blanket-like mineral deposit." comments Brad Peek, VP of Exploration and geologist on all six phases of Noram's Clayton Valley exploration drilling.
Hole ID | From | To | From | To | Li |
CVZ-70 | 20 | 30 | 6.1 | 9.1 | 710 |
CVZ-70 | 30 | 40 | 9.1 | 12.2 | 910 |
CVZ-70 | 40 | 50 | 12.2 | 15.2 | 580 |
CVZ-70 | 50 | 60 | 15.2 | 18.3 | 710 |
CVZ-70 | 60 | 70 | 18.3 | 21.3 | 690 |
CVZ-70 | 70 | 80 | 21.3 | 24.4 | 940 |
CVZ-70 | 80 | 90 | 24.4 | 27.4 | 810 |
CVZ-70 | 90 | 100 | 27.4 | 30.5 | 940 |
CVZ-70 | 100 | 110 | 30.5 | 33.5 | 830 |
CVZ-70 | 110 | 120 | 33.5 | 36.6 | 1930 |
CVZ-70 | 120 | 130 | 36.6 | 39.6 | 1240 |
CVZ-70 | 130 | 140 | 39.6 | 42.7 | 1050 |
CVZ-70 | 140 | 150 | 42.7 | 45.7 | 1430 |
CVZ-70 | 150 | 160 | 45.7 | 48.8 | 1270 |
CVZ-70 | 160 | 170 | 48.8 | 51.8 | 1450 |
CVZ-70 | 170 | 180 | 51.8 | 54.9 | 1410 |
CVZ-70 | 180 | 190 | 54.9 | 57.9 | 1400 |
CVZ-70 | 190 | 200 | 57.9 | 61.0 | 1240 |
CVZ-70 | 200 | 210 | 61.0 | 64.0 | 1530 |
CVZ-70 | 210 | 220 | 64.0 | 67.1 | 1560 |
CVZ-70 | 220 | 230 | 67.1 | 70.1 | 1500 |
CVZ-70 | 230 | 240 | 70.1 | 73.2 | 1230 |
CVZ-70 | 240 | 250 | 73.2 | 76.2 | 1120 |
CVZ-70 | 250 | 260 | 76.2 | 79.2 | 1150 |
CVZ-70 | 260 | 270 | 79.2 | 82.3 | 990 |
CVZ-70 | 270 | 280 | 82.3 | 85.3 | 1010 |
CVZ-70 | 280 | 290 | 85.3 | 88.4 | 1120 |
CVZ-70 | 290 | 300 | 88.4 | 91.4 | 1110 |
CVZ-70 | 300 | 310 | 91.4 | 94.5 | 1000 |
CVZ-70 | 310 | 320 | 94.5 | 97.5 | 1070 |
CVZ-70 | 320 | 330 | 97.5 | 100.6 | 1070 |
CVZ-70 | 330 | 340 | 100.6 | 103.6 | 880 |
CVZ-70 | 340 | 350 | 103.6 | 106.7 | 690 |
CVZ-70 | 350 | 360 | 106.7 | 109.7 | 660 |
CVZ-70 | 360 | 370 | 109.7 | 112.8 | 730 |
CVZ-70 | 370 | 380 | 112.8 | 115.8 | 760 |
CVZ-70 | 380 | 390 | 115.8 | 118.9 | 880 |
CVZ-70 | 390 | 400 | 118.9 | 121.9 | 750 |
CVZ-70 | 400 | 410 | 121.9 | 125.0 | 770 |
CVZ-70 | 410 | 420 | 125.0 | 128.0 | 570 |
CVZ-70 | 420 | 430 | 128.0 | 131.1 | 470 |
CVZ-70 | 430 | 440 | 131.1 | 134.1 | 510 |
CVZ-70 | 440 | 450 | 134.1 | 137.2 | 560 |
CVZ-70 | 450 | 457 | 137.2 | 139.3 | 1410 |
CVZ-70 | 457 | 463 | 139.3 | 141.1 | 1000 |
Table 1 - Summary of sample results from CVZ-70 from surface to depth of 463 ft.
"We are very happy with Noram's progress to date. This phase of drilling will upgrade a substantial amount of the Inferred Resource to the Indicated category. While we move aggressively forward towards the completion of our PFS in 2022, we remain focused on our green mandate by exploring new ingenuitive solutions. Noram will stay aligned with its values and be a leader in this field while bringing immense value to the shareholders as it takes the Zeus Project to the next level", commented Sandy MacDougall, CEO and Director.
The samples were analyzed by the ALS laboratory in Reno, Nevada. QA/QC samples were included in the sample batch and returned values that were within their expected ranges.
The technical information contained in this news release has been reviewed and approved by Brad Peek., M.Sc., CPG, who is a Qualified Person with respect to Noram's Clayton Valley Lithium Project as defined under National Instrument 43-101.
About Noram Lithium Corp.
Noram Lithium Corp. (TSXV: NRM | OTCQB: NRVTF | Frankfurt: N7R) is a well-financed Canadian based advanced Lithium development stage company with less than 90 million shares issued and a fully funded treasury. Noram is aggressively advancing its Zeus Lithium Project in Nevada from the development-stage level through the completion of a Pre-Feasibility Study in 2022.
The Company's flagship asset is the Zeus Lithium Project ("Zeus"), located in Clayton Valley, Nevada. The Zeus Project contains a current 43-101 measured and indicated resource estimate* of 363 million tonnes grading 923 ppm lithium, and an inferred resource of 827 million tonnes grading 884 ppm lithium utilizing a 400 ppm Li cut-off. In December 2021, a robust PEA** indicated an After-Tax NPV(8) of US
Please visit our web site for further information: www.noramlithiumcorp.com.
ON BEHALF OF THE BOARD OF DIRECTORS
Sandy MacDougall
Chief Executive Officer and Director
C: 778.999.2159
For additional information please contact:
Peter A. Ball
President and Chief Operating Officer
peter@noramlithiumcorp.com
C: 778.344.4653
Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release. This news release may contain forward-looking information which is not comprised of historical facts. Forward-looking information involves risks, uncertainties and other factors that could cause actual events, results, performance, prospects and opportunities to differ materially from those expressed or implied by such forward-looking information. Forward-looking information in this news release includes statements regarding, among other things, the completion transactions completed in the Agreement. Factors that could cause actual results to differ materially from such forward-looking information include, but are not limited to, regulatory approval processes. Although Noram believes that the assumptions used in preparing the forward-looking information in this news release are reasonable, including that all necessary regulatory approvals will be obtained in a timely manner, undue reliance should not be placed on such information, which only applies as of the date of this news release, and no assurance can be given that such events will occur in the disclosed time frames or at all. Noram disclaims any intention or obligation to update or revise any forward-looking information, whether as a result of new information, future events or otherwise, other than as required by applicable securities laws. *Updated Lithium Mineral Resource Estimate, Zeus Project, Clayton Valley, Esmeralda County, Nevada, USA (August 2021) **Preliminary Economic Assessment Zeus Project, ABH Engineering (December 2021).
SOURCE: Noram Lithium Corp.
View source version on accesswire.com:
https://www.accesswire.com/697318/Noram-Receives-Results-for-CVZ-70-High-of-1930-ppm-Intersection-of-443-ft-1350-m-Averaging-968-ppm-Lithium
FAQ
What were the lithium values found in the CVZ-70 drill hole by Noram Lithium Corp. on April 14, 2022?
What is the significance of the CVZ-70 core hole completion for Noram Lithium Corp.?
How deep was the CVZ-70 core hole drilled by Noram Lithium Corp.?
When did Noram Lithium Corp. announce the completion of CVZ-70?