Noram Completes Cvz-70 At 463ft (141.1m) With Near Surface Mineralization and Over 350ft (106.7m) Of Visually Rich Clays
Noram Lithium Corp. has completed its CVZ-70 drill hole at the Zeus lithium clay deposit in Nevada, reaching a depth of 463 ft (141.1m). The drilling revealed a significant intersection of mineralization from surface to 387 ft (116m), comparable to previous successful holes. This is part of a 12-hole Phase VI drilling program aimed at upgrading an estimated 175 million tonnes of an 827 million tonne Inferred Resource. Results from the core samples are pending, while the company has a strong financial position with over US$18 million in treasury.
- Completion of CVZ-70 drill hole revealed a significant mineralization intersection of 380 ft (116m).
- The Phase VI drilling program aims to upgrade approximately 175 million tonnes of the current Inferred Resource.
- Noram Lithium has an estimated 43-101 measured and indicated resource of 363 million tonnes with a strong lithium grade.
- Robust Preliminary Economic Assessment indicates a potential After-Tax NPV of US$2.6 Billion at long-term forecast lithium prices.
- None.
VANCOUVER, BC / ACCESSWIRE / March 31, 2022 / Sandy MacDougall, CEO of Noram Lithium Corp. ("Noram" or the "Company") (TSXV:NRM | OTCQB:NRVTF | Frankfurt:N7R) is pleased to report that the Company has completed hole CVZ-70 on its Zeus lithium clay deposit in Nevada to a total depth of 463 ft (141.1m). When logging and visual inspection of the core was completed, it was noted that mineralization appeared immediately near surface and extended down to approximately 387.0 ft (138m) for a total intersection of 380ft (116m).
Figure 1 shows the Zeus project drilling to date with the various drilling phases color coded. The arrow points to the recently completed CVZ-70 hole. Other planned Phase VI holes are indicated in purple.
Figure 1 - Location of all past drill holes (Phase I to Phase V) previously completed in addition to the 12 proposed holes for Phase V1 currently underway. CVZ-70 and other planned Phase VI holes are indicated in purple.
"Drill hole CVZ-70 is an incredibly encouraging hole for Noram. Figure 2 below shows a cross section with CVZ-70 and two adjacent, previously drilled, holes. The blue, green, black and magenta layers in the figure indicate claystone layers that have been shown to host the higher lithium assays from past drilling. The 380-foot (116-meter) intersection in CVZ-62 was one of the thickest claystone intersections by far. CVZ-70 appears to likely rival this and prior holes from prior programs. Thicker intersections such as this one will have profound implications on future resource tonnage calculations" commented Brad Peek M.Sc. CPG., VP of Exploration and Qualified Person for this and all 5 of the previous drilling phases of Noram's Zeus lithium property.
Figure 2. Comparative stratigraphy for drill holes CVZ-70 as compared to CVZ-61 and CVZ-62, which were drilled as part of the Phase V program. CVZ-61 and CVZ-62 were two of the longest intercepts drilled on the property to date. All of the claystone units except the brown silty claystone have relatively high lithium concentrations in previous drill holes on the property. The histogram on the sides of CVZ-61 and CVZ-62 are the composited lithium grades in ppm Li.
CVZ-70 is the first of the 12-hole Phase VI drilling program which is expected to upgrade approximately 175 million tonnes of the current 827 million tonne Inferred Resource to the Indicated category. Core samples from CVZ-70 have been shipped to ALS Laboratory in Reno, Nevada for assay processing on a "rush" basis. Assay results are pending.
The technical information contained in this news release has been reviewed and approved by Brad Peek., M.Sc., CPG, who is a Qualified Person with respect to Noram's Clayton Valley Lithium Project as defined under National Instrument 43-101.
About Noram Lithium Corp.
Noram Lithium Corp. (TSXV: NRM | OTCQB: NRVTF | Frankfurt: N7R) is a well-financed Canadian based advanced Lithium development stage company with less than 90 million shares issued and treasury exceeding US
The Company's flagship asset is the Zeus Lithium Project ("Zeus"), located in Clayton Valley, Nevada. The Zeus Project contains a current 43-101 measured and indicated resource estimate* of 363 million tonnes grading 923 ppm lithium, and an inferred resource of 827 million tonnes grading 884 ppm lithium utilizing a 400 ppm Li cut-off. In December 2021, a robust PEA** indicated an After-Tax NPV(8) of US
Please visit our web site for further information: www.noramlithiumcorp.com.
ON BEHALF OF THE BOARD OF DIRECTORS
Sandy MacDougall
Chief Executive Officer and Director
C: 778.999.2159
For additional information please contact:
Peter A. Ball
President and Chief Operating Officer
peter@noramlithiumcorp.com
C: 778.344.4653
Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release. This news release may contain forward-looking information which is not comprised of historical facts. Forward-looking information involves risks, uncertainties and other factors that could cause actual events, results, performance, prospects and opportunities to differ materially from those expressed or implied by such forward-looking information. Forward-looking information in this news release includes statements regarding, among other things, the completion transactions completed in the Agreement. Factors that could cause actual results to differ materially from such forward-looking information include, but are not limited to, regulatory approval processes. Although Noram believes that the assumptions used in preparing the forward-looking information in this news release are reasonable, including that all necessary regulatory approvals will be obtained in a timely manner, undue reliance should not be placed on such information, which only applies as of the date of this news release, and no assurance can be given that such events will occur in the disclosed time frames or at all. Noram disclaims any intention or obligation to update or revise any forward-looking information, whether as a result of new information, future events or otherwise, other than as required by applicable securities laws. *Updated Lithium Mineral Resource Estimate, Zeus Project, Clayton Valley, Esmeralda County, Nevada, USA (August 2021) **Preliminary Economic Assessment Zeus Project, ABH Engineering (December 2021).
SOURCE: Noram Lithium Corp.
View source version on accesswire.com:
https://www.accesswire.com/695434/Noram-Completes-Cvz-70-At-463ft-1411m-With-Near-Surface-Mineralization-and-Over-350ft-1067m-Of-Visually-Rich-Clays
FAQ
What were the results from the CVZ-70 drill hole completed by Noram Lithium (NRVTF)?
How does drill hole CVZ-70 impact the resource estimate for Noram Lithium (NRVTF)?
What is the current financial status of Noram Lithium (NRVTF)?