STOCK TITAN

Myriad Announces Acquisition of Historic Bonanza and Kermac/Day Uranium Mines at Copper Mountain

Rhea-AI Impact
(Neutral)
Rhea-AI Sentiment
(Neutral)
Myriad Uranium Corp. acquires historic Bonanza and Kermac/Day uranium mines at Copper Mountain through its earn-in partner Rush Rare Metals Corp. The Bonanza Mine produced 780,000 lbs from 30,000 tons of ore at 1.3% eU3O8, while the Day Mine mined 1,152 tons of ore at grades between 0.12% and 0.56% eU3O8 in the early 1960's. The acquisition expands Myriad's interest to 3,886 acres from 3,605 acres, showing promising potential for uranium mineralization.
Myriad Uranium Corp. ha acquisito le storiche miniere di uranio Bonanza e Kermac/Day a Copper Mountain tramite il suo partner Rush Rare Metals Corp. La miniera di Bonanza ha prodotto 780.000 libbre da 30.000 tonnellate di minerale al tasso del 1,3% di eU3O8, mentre la miniera di Day ha estratto 1.152 tonnellate di minerale con una purezza tra lo 0,12% e lo 0,56% di eU3O8 nei primi anni '60. L'acquisizione ha aumentato gli interessi di Myriad a 3.886 acri rispetto ai 3.605 acri precedenti, dimostrando un potenziale promettente per la mineralizzazione dell'uranio.
Myriad Uranium Corp. ha adquirido las históricas minas de uranio Bonanza y Kermac/Day en Copper Mountain a través de su socio Rush Rare Metals Corp. La mina Bonanza produjo 780,000 libras de 30,000 toneladas de mineral al 1.3% eU3O8, mientras que la mina Day extrajo 1,152 toneladas de mineral con grados entre 0.12% y 0.56% eU3O8 a principios de los años 60. La adquisición ha ampliado el interés de Myriad a 3,886 acres de 3,605 acres, mostrando un potencial prometedor para la mineralización de uranio.
다양한 우라늄 코퍼레이션이 러시 래어 메탈스 코퍼레이션의 파트너를 통해 카퍼 산에서 역사적인 보난자 및 커맥/데이 우라늄 광산을 인수했습니다. 보난자 광산은 30,000톤의 광석에서 1.3% eU3O8로 780,000파운드를 생산했고, 데이 광산은 1960년대 초에 0.12%에서 0.56% eU3O8 등급의 광석 1,152톤을 채굴하였습니다. 이번 인수로 미리어드의 관심사가 3,605 에이커에서 3,886 에이커로 확장되었으며, 우라늄 광물화에 대한 유망한 잠재력을 보여줍니다.
Myriad Uranium Corp. a acquis les mines d'uranium historiques de Bonanza et Kermac/Day à Copper Mountain par l'intermédiaire de son partenaire Rush Rare Metals Corp. La mine de Bonanza a produit 780 000 livres à partir de 30 000 tonnes de minerai à 1,3% eU3O8, tandis que la mine de Day a extrait 1 152 tonnes de minerai avec des teneurs entre 0,12% et 0,56% eU3O8 au début des années 60. L'acquisition étend les intérêts de Myriad à 3 886 acres, contre 3 605 acres précédemment, démontrant un potentiel prometteur pour la minéralisation de l'uranium.
Myriad Uranium Corp. hat durch ihren Partner Rush Rare Metals Corp. die historischen Uranminen Bonanza und Kermac/Day am Copper Mountain erworben. Die Bonanza Mine produzierte 780.000 Pfund aus 30.000 Tonnen Erz mit einem Gehalt von 1,3% eU3O8, während die Day Mine in den frühen 1960ern 1.152 Tonnen Erz mit Gehalten zwischen 0,12% und 0,56% eU3O8 abbau. Der Erwerb erweitert Myriads Interessen von 3.605 auf 3.886 Acres, was ein vielversprechendes Potenzial für die Uranmineralisierung zeigt.
Positive
  • Acquisition of historic Bonanza and Kermac/Day uranium mines at Copper Mountain.
  • Bonanza Mine produced 780,000 lbs at 1.3% eU3O8, Day Mine mined 1,152 tons at 0.12%-0.56% eU3O8.
  • Increase in Myriad's interest from 3,605 acres to 3,886 acres.
  • Promising potential for uranium mineralization at the new acquisition area.
Negative
  • None.

Vancouver, British Columbia--(Newsfile Corp. - April 19, 2024) - Myriad Uranium Corp. (CSE: M) (OTCQB: MYRUF) (FSE: C3Q) ("Myriad" or the "Company") is pleased to announce that its earn-in partner Rush Rare Metals Corp. ("Rush"), again guided by proprietary data, has acquired the historic Bonanza and Kermac/Day uranium mines at Copper Mountain (See Figure 1 below). Various proprietary documents in Myriad's possession indicate that the Bonanza Mine produced around 780,000 lbs from 30,000 tons of ore at a grade of 1.3% eU3O8, while at the Day Mine, 1,152 tons of ore were mined at grades of between 0.12% and 0.56% eU3O8 in the early 1960's (see Figure 2 below).

"Bonanza-Kermac" aggregates 280 acres, and its acquisition increases the area subject to Myriad's 75% earnable interest under the property option agreement between Myriad and Rush from 3,605 acres to 3,886 acres.

Cannot view this image? Visit: https://images.newsfilecorp.com/files/6301/206089_47decf06b46b3b87_002.jpg

Figure 1: Current Copper Mountain Project Area including Bonanza-Kermac

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/6301/206089_47decf06b46b3b87_002full.jpg

Myriad's CEO Thomas Lamb commented, "We continue to add highly prospective acreage at Copper Mountain."

Production during the late 1950's and 1960's from the Bonanza Mine Area came from siltstones of the Wind River Formation overlying the pre-Cambrian basement granitic rocks. Mineralization in these areas formed by basinward migration of uranium in channel sediments with precipitation occurring at roll-front boundaries or fault/hydrocarbon redox areas. The deposit lies downstream of the old Little Mo (Arrowhead) Mine which was the first area of production (around 500,000 lbs U3O8) before final shutdown in 1971 (Figure 2).

Cannot view this image? Visit: https://images.newsfilecorp.com/files/6301/206089_47decf06b46b3b87_003.jpg

Figure 2: Extracts from 1975 and 1968 charts of Copper Mountain
indicating the Bonanza Mine's estimated uranium endowment and grade.

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/6301/206089_47decf06b46b3b87_003full.jpg

Mineralization in the Kermac/Day Mine Area follows a similar configuration and was investigated by RME as a site for potential shallow uranium mineralization in the late 1970's. Previous production was from Tertiary bentonitic clay sediments overlying the basement granite.

A qualified person (as defined under NI 43-101) has not done sufficient work to classify the historical target estimates reported in this news release as current mineral resources or mineral reserves, and Myriad is not treating the historical target estimates as current mineral resources or mineral reserves. In particular, the Company considers that insufficient work has been done to estimate a resource at the Bonanza-Kermac property and the potential cannot be relied upon until further work is done.

Qualified Person

The scientific or technical information in this news release respecting the Company's Copper Mountain Project has been approved by George van der Walt, MSc., Pr.Sci.Nat., MGSSA, a Qualified Person as defined in National Instrument 43-101 – Standards of Disclosure for Mineral Projects. It is based on the Qualified Person's initial review of historical reports which were recently obtained by the Company. The Qualified Person considers the information to be relevant based on the amount and quality of work undertaken and reported historically. However, the information did not include original data such as drilling records, sampling, analytical or test data underlying the information or opinions contained in the written documents. Therefore, the Qualified Person has not reviewed or otherwise verified the information and has not done sufficient work to classify the historical estimates as current mineral resources or mineral reserves. A more thorough review of any available original data will be undertaken and reported on in more detail in future releases.

About Myriad Uranium Corp.

Myriad Uranium Corp. is a uranium exploration company with an earnable 75% interest in the Copper Mountain Uranium Project in Wyoming, USA. Copper Mountain hosts several known uranium deposits and historic uranium mines, including the Arrowhead Mine which produced 500,000 lbs of eU3O8. Copper Mountain saw extensive drilling and development by Union Pacific, which developed a mine plan and built a leach pad for one of the deposits at Copper Mountain. Operations ceased in 1980 before mining could commence due to falling uranium prices. Approximately 2,000 boreholes have been drilled at Copper Mountain and the project area has significant exploration upside. Union Pacific is estimated to have spent C$117 million (2023 dollars) exploring and developing Copper Mountain, generating significant historical resource estimates which are detailed here.

Myriad also holds 80% ownership of over 1,800 km2 of uranium exploration licenses in the Tim Mersoï Basin, Niger, with the option to earn up to 100%. These licenses are surrounded by many of the most significant uranium deposits in Africa, including Orano's 384 Mlbs eU3O8 Imouraren, Global Atomic's 236 Mlbs Dasa, and Goviex's 100 Mlbs Madaouela, and on the same fault structures. Myriad also has a 50% interest in the Millen Mountain Property in Nova Scotia, Canada, with the other 50% held by Probe Metals Inc. For further information, please refer to Myriad's disclosure record on SEDAR+ (www.sedarplus.ca), contact Myriad by telephone at +1.604.418.2877, or refer to Myriad's website at www.myriaduranium.com.

Recent interviews with Crux Investor and VSA are here and here. A video overview of the Copper Mountain Project is here.

Myriad Contacts:
Thomas Lamb
President and CEO
tlamb@myriaduranium.com

Forward-Looking Statements

Mineralization hosted on adjacent or nearby properties is not necessarily indicative of mineralization hosted on the Company's properties. This news release contains "forward-looking information" that is based on the Company's current expectations, estimates, forecasts and projections. This forward-looking information includes, among other things, the Company's business, plans, outlook and business strategy. The words "may", "would", "could", "should", "will", "likely", "expect," "anticipate," "intend", "estimate", "plan", "forecast", "project" and "believe" or other similar words and phrases are intended to identify forward-looking information. The reader is cautioned that assumptions used in the preparation of any forward-looking information may prove to be incorrect, including with respect to the Company's business plans respecting the exploration and development of the Company's mineral properties, the proposed work program on the Company's mineral properties and the potential and economic viability of the Company's mineral properties. Forward-looking information is subject to known and unknown risks, uncertainties and other factors that may cause the Company's actual results, level of activity, performance or achievements to be materially different from those expressed or implied by such forward-looking information. Such factors include, but are not limited to: changes in economic conditions or financial markets; increases in costs; litigation; legislative, environmental and other judicial, regulatory, political and competitive developments; and technological or operational difficulties. This list is not exhaustive of the factors that may affect our forward-looking information. These and other factors should be considered carefully, and readers should not place undue reliance on such forward-looking information. The Company does not intend, and expressly disclaims any intention or obligation to, update or revise any forward-looking information whether as a result of new information, future events or otherwise, except as required by applicable law.

The CSE has not reviewed, approved or disapproved the contents of this news release.

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/206089

FAQ

What mines did Myriad Uranium Corp. acquire at Copper Mountain?

Myriad Uranium Corp. acquired the historic Bonanza and Kermac/Day uranium mines at Copper Mountain.

How much uranium was produced from the Bonanza Mine?

The Bonanza Mine produced approximately 780,000 lbs from 30,000 tons of ore at a grade of 1.3% eU3O8.

What is the grade range of uranium mined at the Day Mine?

The Day Mine mined 1,152 tons of ore at grades between 0.12% and 0.56% eU3O8 in the early 1960's.

What is the total acreage of Myriad's interest after the acquisition?

The acquisition increased Myriad's interest from 3,605 acres to 3,886 acres.

What is the potential for uranium mineralization at the new acquisition area?

The new acquisition area shows promising potential for uranium mineralization.

MYRIAD URANIUM CORP

OTC:MYRUF

MYRUF Rankings

MYRUF Latest News

MYRUF Stock Data

11.29M
26.91M
30.47%
Other Industrial Metals & Mining
Basic Materials
Link
United States of America
Vancouver