McEwen Copper Announces Completion of the Feasibility Drilling Program
McEwen Copper completed a 70,000-meter feasibility drilling program at their Los Azules project in Argentina. Key highlights include intercepts of 349 m of 0.77% Cu and 382.5 m of 0.54% Cu. The season's infill drilling campaign aimed to confirm deposit size and grade, test for mineralization extensions, and explore new areas. Initial results suggest an increase in Measured and Indicated resources, with successful mineralization extensions both north and south of the current pit shell. Exploration identified a large porphyry system 3 km east of Los Azules. The results will support the Los Azules Feasibility Study, expected to be completed by early 2025.
- Completed 70,000 meters of feasibility drilling, achieving a significant milestone.
- Intercepts include high-grade copper zones: 349 m of 0.77% Cu and 232 m of 0.86% Cu.
- Initial results indicate an increase in Measured and Indicated resources.
- Successful extension of mineralization north and south of the current pit shell.
- Discovery of a new porphyry system 3 km east of Los Azules, indicating further exploration potential.
- Infill drilling suggests the mineral inventory will align closely with the PEA estimate.
- Ongoing geotechnical, metallurgical, and hydrogeological work to support feasibility study completion by early 2025.
- Pending assay results for several exploratory holes, creating uncertainty until final data is available.
- Some intercepts outside the current pit shell showed low-grade mineralization, which may affect economic viability.
Insights
The completion of the feasibility drilling program at McEwen Copper's Los Azules project offers promising results for the company and its stakeholders. The assay results show significant intercepts with high copper grades, which are critical for the economic viability of the project. For instance, Hole AZ23292 returned an intercept of 349 m at 0.77% Cu, including 232 m at 0.86% Cu. Such findings indicate a robust resource base.
Converting a significant portion of the mineralization to Measured and Indicated resources can enhance investor confidence, particularly for the first five years of mining. It ensures a more predictable revenue stream during the critical payback period.
The discovery of additional mineralized zones beyond the current pit design suggests potential for expanding the resource base, which could lead to extended mine life and enhanced project profitability. The identification of a large porphyry system east of the deposit further adds to the future exploration potential.
However, investors should remain cautious. The feasibility study's completion timeline, set for early 2025, indicates that substantial additional work is required. Potential risks include geological uncertainties, regulatory approvals and fluctuations in copper prices.
The positive assay results from Los Azules could significantly impact McEwen Mining's (NYSE: MUX) valuation. The reported intercepts and mineralization grades support the potential for a high-value copper project. For instance, the intercept of 382.5 meters at 0.54% Cu in Hole AZ23277, including 74 meters at 0.86% Cu, points to a high-quality resource.
In terms of financial performance, the increase in Measured and Indicated resources may lead to a more favorable feasibility study, positively affecting McEwen Copper's market perception. This could translate into increased share prices and potentially lower financing costs for the project. Investors might view this as a de-risking event, knowing that the resource base is solidifying.
Yet, the market's reaction will depend on several factors, including commodity price trends and broader economic conditions. The capital expenditure required to bring Los Azules into production is considerable and the timeline to first production remains a key consideration for stakeholders.
70,000 meters completed, highlights include:
349.0 m of
382.5 m of
TORONTO, May 16, 2024 (GLOBE NEWSWIRE) -- McEwen Copper Inc.,
Based on the assay results received to date, our first objective appears to have been met. Initial interpretation suggests that our infill drilling will result in an increase in Measured and Indicated resources and an overall mineral inventory within
Exploration over our property has produced an intriguing target, late in the season. Initial results of a concession-wide regional mapping and sampling campaign have identified strong evidence of a large porphyry system 3 kilometers east of the Los Azules deposit. Porphyry-style veining and quartz vein stockworks with copper oxide mineralization have been recognized within this new target, with assay results pending.
Additionally, this news release covers all results from the first half of the 2023-24 drill program (see Table 1). Final results will be published when all the geochemistry is completed.
The objective of the 2023-2024 drilling campaign is to collect all the necessary information to support the completion of the Los Azules Feasibility Study by early 2025. This information continues to arrive and will be processed in the following months. Resource drilling is focused on converting all the mineralization to be mined in the first 5 years to Measured and Indicated resource, to increase confidence during the payback period. Geotechnical, metallurgical, hydrogeological, exploration, and condemnation drilling are also being performed.
Highlights
- Hole AZ23292 returned an intercept of 349 m of
0.77% Cu (approx. true thickness). The Enriched zone portion of this hole extends over 346 meters and includes an intercept of 232 m of0.86% Cu. - Hole AZ23277 has an intercept of 382.5 m of
0.54% Cu (approx. true thickness). The Enriched zone portion of this hole extends over 306 meters with a grade of0.61% Cu and includes an intercept of 74 m of0.86% Cu.
Results
Results are summarized in two schematic cross sections (Figures 2 and 3), which include simplified interpretations of the Overburden, Leached, Enriched and Primary zones. The Enriched mineral zone refers to the enrichment of a copper deposit by precipitation-derived water circulation that carries copper minerals downward through the rocks to accumulate in a thick, often horizontal “blanket”. Immediately above the Enriched zone is the Leached zone, from which copper was removed and transported. Weathering and oxidation often aid in this process. Below the Enriched zone, the Primary (or Hypogene) zone is formed by ascending copper-rich fluids having a much deeper magmatic origin. The green line on the sections indicates the pit floor of the 30-year pit shell from the 2023 NI 43-101 Preliminary Economic Assessment (PEA).
Figure 1 presents a plan view of the location of two sections and the holes reported. Adjacent cross sections are located 50 m apart from each other, starting with the lowest numbered section at the south end of the deposit and progressing to the north.
Figure 1 – Plan View Location of Cross-sections and Drill Holes Reported in this News Release
Figure 2 displays an intercept of 349 m grading
Figure 2 - Section 40 - Drilling, Mineralized Zones and 30-year PEA Pit (Looking North)
Figure 3 highlights a 382.5 m interval grading
Figure 3 - Section 52 - Drilling, Mineralized Zones and 30-year PEA Pit (Looking North)
Growing the Deposit
Exploration hole AZ23241 (Figure 4) intersected a long interval of low-grade mineralization in the Primary Zone (202.0 m of
A comprehensive structural model for the deposit has been completed that will provide a better understanding of structural controls on the deposit and aid in future exploration work. Field verification of a previous property-wide structural study using satellite information was carried out in January and has refined the identification of nearby exploration targets.
Figure 4 – North-South Longitudinal Section (Looking East) With Deep Exploration Holes to the North and Exploration Holes to the South With Early Mineral Porphyry Shown in Red
Indications of Another Porphyry Copper System Nearby
To date, geological mapping and geochemical sampling has been focused primarily near the Los Azules deposit and only covers roughly
Early results of this work have identified a large new porphyry system 3 kilometers east of Los Azules. Preliminary work has identified porphyry-style veining and alteration, indicating the presence of a porphyry copper system. Areas with strong quartz vein stockworking and the recognition of copper oxides at surface add to the prospectiveness of this newly identified area (Figure 5).
Figure 5 – Quartz Stockwork Veining and Copper Oxides Identified at Surface in Porphyry Copper System 3 Kilometers East of Los Azules
Table 1 summarizes copper (Cu), gold (Au) and silver (Ag) assay results received from October 2023 to December 31, 2023.
Table 1 – Recent Los Azules Drilling Results
Hole-ID | Section | Predominant Mineral Zone | From (m) | To (m) | Length (m) | Cu % | Au (g/t) | Ag (g/t) | Comment |
AZ23238 | 50-51 | Total | 102.0 | 201.0 | 99.0 | 1.02 | 0.07 | 2.75 | |
Enriched | 102.0 | 201.0 | 99.0 | 1.02 | 0.07 | 2.75 | |||
AZ23239 | 35 | Total | 48.0 | 225.5 | 177.5 | 0.61 | 0.07 | 1.61 | |
Enriched | 48.0 | 225.5 | 177.5 | 0.61 | 0.07 | 1.61 | Incl. 86.0m of | ||
AZ23240 | 41 | Total | 104.0 | 224.5 | 120.5 | 0.98 | 0.11 | 1.53 | |
Enriched | 104.0 | 224.5 | 120.5 | 0.98 | 0.11 | 1.53 | Incl. 112.5m of | ||
AZ23241 | 71 | Total | 18.0 | 740.0 | 722.0 | 0.11 | 0.01 | 0.63 | |
Enriched | 18.0 | 300.0 | 282.0 | 0.07 | 0.01 | 0.60 | |||
Primary | 538.0 | 740.0 | 202.0 | 0.20 | 0.01 | 0.72 | Incl. 12.0m of | ||
AZ23242 | 45 | Total | 86.0 | 200.0 | 114.0 | 0.92 | 0.08 | 1.77 | |
Enriched | 86.0 | 200.0 | 114.0 | 0.92 | 0.08 | 1.77 | |||
AZ23243 | 46 | Total | 82.0 | 150.0 | 68.0 | 0.53 | 0.04 | 1.26 | |
Enriched | 82.0 | 150.0 | 68.0 | 0.53 | 0.04 | 1.26 | |||
AZ23244A | 43-44 | Total | 92.0 | 230.3 | 138.3 | 0.54 | 0.05 | 1.66 | |
Enriched | 92.0 | 230.3 | 138.3 | 0.54 | 0.05 | 1.66 | Incl. 112.0m of | ||
AZ23245 | 43 | Total | 86.0 | 220.7 | 134.7 | 0.99 | 0.06 | 1.74 | |
Enriched | 86.0 | 220.7 | 134.7 | 0.99 | 0.06 | 1.74 | |||
AZ23246 | 39-38 | Total | 123.0 | 235.1 | 112.1 | 1.04 | 0.11 | 2.34 | |
Enriched | 123.0 | 235.1 | 112.1 | 1.04 | 0.11 | 2.34 | Incl. 81.1m of | ||
AZ23248 | 42 | Total | 98.0 | 227.0 | 129.0 | 0.87 | 0.08 | 1.71 | |
Enriched | 98.0 | 227.0 | 129.0 | 0.87 | 0.08 | 1.71 | Incl. 93.0m of | ||
AZ23249 | 40 | Total | 88.0 | 219.6 | 131.6 | 0.37 | 0.05 | 1.08 | |
Enriched | 88.0 | 219.6 | 131.6 | 0.37 | 0.05 | 1.08 | Incl. 52.0m of | ||
AZ23250 | 38 | Total | 114.0 | 210.0 | 96.0 | 0.69 | 0.06 | 1.05 | |
Enriched | 114.0 | 210.0 | 96.0 | 0.69 | 0.06 | 1.05 | |||
AZ23251 | 56 | Total | 82.0 | 430.8 | 348.8 | 0.37 | 0.05 | 1.65 | |
Enriched | 82.0 | 198.0 | 116.0 | 0.40 | 0.03 | 1.10 | Incl. 40.0m of | ||
Primary | 198.0 | 430.8 | 232.8 | 0.36 | 0.06 | 1.93 | |||
AZ23252 | 54 | Total | 86.0 | 172.1 | 86.1 | 0.52 | 0.07 | 1.22 | |
Enriched | 86.0 | 172.1 | 86.1 | 0.52 | 0.07 | 1.22 | |||
AZ23253 | 36 | Total | 96.0 | 307.0 | 211.0 | 0.28 | 0.01 | 0.35 | |
Enriched | 96.0 | 290.0 | 194.0 | 0.29 | 0.01 | 0.36 | |||
Primary | 290.0 | 307.0 | 17.0 | 0.19 | 0.02 | 0.25 | |||
AZ23254 | 41 | Total | 147.5 | 200.0 | 52.5 | 0.27 | 0.05 | 2.23 | |
Enriched | 147.5 | 200.0 | 52.5 | 0.27 | 0.05 | 2.23 | Incl. 18.5m of | ||
AZ23255 | 45 | Total | 120.5 | 253.7 | 133.2 | 0.55 | 0.04 | 1.36 | |
Enriched | 120.5 | 253.7 | 133.2 | 0.55 | 0.04 | 1.36 | Incl. 64.0m of | ||
AZ23257 | 39 | Total | 87.0 | 202.0 | 115.0 | 0.28 | 0.04 | 1.50 | |
Enriched | 87.0 | 202.0 | 115.0 | 0.28 | 0.04 | 1.50 | Incl. 24.0m of | ||
AZ23258A | 28 | Total | 62.0 | 347.0 | 285.0 | 0.50 | 0.05 | 0.95 | |
Enriched | 62.0 | 300.0 | 238.0 | 0.56 | 0.06 | 0.87 | Incl. 142.0m of | ||
Primary | 300.0 | 347.0 | 47.0 | 0.22 | 0.03 | 1.34 | |||
AZ23259MET | 50 | Total | 115.0 | 347.0 | 232.0 | 0.46 | 0.02 | 0.93 | |
Enriched | 115.0 | 334.0 | 219.0 | 0.48 | 0.02 | 0.96 | Incl. 114.0m of | ||
Primary | 334.0 | 347.0 | 13.0 | 0.12 | 0.02 | 0.55 | |||
AZ23260 | 32 | Total | 102.0 | 313.0 | 211.0 | 0.40 | 0.03 | 1.05 | |
Enriched | 102.0 | 313.0 | 211.0 | 0.40 | 0.03 | 1.05 | Incl. 56.0m of | ||
AZ23261 | 33 | Total | 98.0 | 299.0 | 201.0 | 0.40 | 0.03 | 0.74 | |
Enriched | 98.0 | 299.0 | 201.0 | 0.40 | 0.03 | 0.74 | Incl. 20.0m of | ||
AZ23262 | 36 | Total | 98.0 | 191.0 | 93.0 | 0.45 | 0.07 | 0.79 | |
Enriched | 98.0 | 191.0 | 93.0 | 0.45 | 0.07 | 0.79 | Incl. 46.0m of | ||
AZ23263 | 37 | Total | 170.0 | 318.5 | 148.5 | 0.59 | 0.09 | 2.26 | |
Enriched | 170.0 | 282.0 | 112.0 | 0.64 | 0.07 | 1.77 | |||
Primary | 282.0 | 318.5 | 36.5 | 0.47 | 0.14 | 3.77 | |||
AZ23264 | 55 | Total | 78.5 | 276.0 | 197.5 | 0.63 | 0.10 | 2.91 | |
Enriched | 78.5 | 268.0 | 189.5 | 0.64 | 0.10 | 2.93 | Incl. 64.0m of | ||
Primary | 268.0 | 276.0 | 8.0 | 0.32 | 0.10 | 2.47 | |||
AZ23265 | 54 | Total | 150.2 | 281.0 | 130.8 | 0.48 | 0.06 | 1.05 | |
Enriched | 150.2 | 281.0 | 130.8 | 0.48 | 0.06 | 1.05 | Incl. 77.8m of | ||
AZ23267 | 29 | Total | 66.0 | 218.0 | 152.0 | 0.51 | 0.06 | 0.79 | |
Enriched | 66.0 | 218.0 | 152.0 | 0.51 | 0.06 | 0.79 | Incl. 110m of | ||
AZ23268 | 50 | Total | 102.0 | 249.5 | 147.5 | 0.35 | 0.02 | 1.01 | |
Enriched | 102.0 | 249.5 | 147.5 | 0.35 | 0.02 | 1.01 | |||
AZ23269 | 31 | Total | 122.0 | 222.5 | 100.5 | 0.55 | 0.05 | 1.66 | |
Enriched | 122.0 | 222.5 | 100.5 | 0.55 | 0.05 | 1.66 | |||
AZ23271 | 26 | Total | 192.0 | 393.5 | 201.5 | 0.15 | 0.01 | 0.60 | |
Enriched | 192.0 | 390.0 | 198.0 | 0.16 | 0.01 | 0.58 | |||
Primary | 390.0 | 393.5 | 3.5 | 0.07 | 0.04 | 1.66 | |||
AZ23273 | 25 | Total | 64.0 | 289.0 | 225.0 | 0.50 | 0.08 | 1.37 | |
Enriched | 64.0 | 289.0 | 225.0 | 0.50 | 0.08 | 1.37 | Incl. 120m of | ||
AZ23274 | 53 | Total | 72.0 | 207.4 | 135.4 | 0.81 | 0.06 | 2.24 | |
Enriched | 72.0 | 207.4 | 135.4 | 0.81 | 0.06 | 2.24 | |||
AZ23275 | 33 | Total | 60.0 | 216.5 | 156.5 | 0.91 | 0.08 | 1.44 | |
Enriched | 60.0 | 208.0 | 148.0 | 0.93 | 0.08 | 1.44 | Incl. 78m of | ||
Primary | 208.0 | 216.5 | 8.5 | 0.63 | 0.07 | 1.43 | |||
AZ23276 | 53 | Total | 104.0 | 209.8 | 105.8 | 0.38 | 0.05 | 1.21 | |
Enriched | 104.0 | 209.8 | 105.8 | 0.38 | 0.05 | 1.21 | Incl. 58m of | ||
AZ23277 | 52 | Total | 94.0 | 476.5 | 382.5 | 0.54 | 0.10 | 2.33 | |
Enriched | 94.0 | 400.0 | 306.0 | 0.61 | 0.11 | 2.62 | Incl. 74m of | ||
Primary | 400.0 | 476.5 | 76.5 | 0.25 | 0.06 | 1.20 | |||
AZ23279 | 53 | Total | 55.8 | 192.5 | 136.7 | 0.41 | 0.06 | 2.50 | |
Enriched | 55.8 | 192.5 | 136.7 | 0.41 | 0.06 | 2.50 | |||
AZ23280 | 56 | Total | 34.0 | 485.5 | 451.5 | 0.33 | 0.05 | 1.72 | |
Enriched | 34.0 | 485.5 | 451.5 | 0.33 | 0.05 | 1.72 | Incl. 80m of | ||
AZ23282A | 30 | Total | 166.0 | 354.5 | 188.5 | 0.15 | 0.00 | 0.40 | |
Enriched | 166.0 | 354.5 | 188.5 | 0.15 | 0.00 | 0.40 | |||
AZ23283 | 25 | Total | 165.0 | 342.5 | 177.5 | 0.70 | 0.06 | 1.82 | |
Enriched | 165.0 | 342.5 | 177.5 | 0.70 | 0.06 | 1.82 | Incl. 112m of | ||
AZ23284 | 27 | Total | 55.3 | 264.8 | 209.5 | 0.52 | 0.11 | 1.37 | |
Enriched | 55.3 | 236.0 | 180.7 | 0.54 | 0.11 | 1.36 | Incl. 112m of | ||
Primary | 236.0 | 264.8 | 28.8 | 0.44 | 0.09 | 1.46 | |||
AZ23285 | 59 | Total | 90.0 | 256.6 | 166.6 | 0.10 | 0.01 | 0.64 | |
Enriched | 90.0 | 174.0 | 84.0 | 0.14 | 0.01 | 0.68 | |||
Primary | 174.0 | 256.6 | 82.6 | 0.08 | 0.00 | 0.59 | |||
AZ23286 | 48 | Total | 143.2 | 329.0 | 185.8 | 0.09 | 0.02 | 0.68 | |
Enriched | 143.2 | 258.0 | 114.8 | 0.08 | 0.02 | 0.86 | |||
Primary | 258.0 | 329.0 | 71.0 | 0.11 | 0.02 | 0.38 | |||
AZ23289 | 49 | Total | 152.0 | 278.0 | 126.0 | 0.73 | 0.06 | 2.76 | |
Enriched | 152.0 | 278.0 | 126.0 | 0.73 | 0.06 | 2.76 | |||
AZ23290 | 51 | Total | 136.0 | 260.1 | 124.1 | 0.53 | 0.05 | 1.63 | |
Enriched | 136.0 | 260.1 | 124.1 | 0.53 | 0.05 | 1.63 | |||
AZ23291 | 47 | Total | 102.0 | 241.5 | 139.5 | 0.67 | 0.06 | 3.26 | |
Enriched | 102.0 | 241.5 | 139.5 | 0.67 | 0.06 | 3.26 | Incl. 60m of | ||
AZ23292 | 40 | Total | 114.0 | 463.0 | 349.0 | 0.77 | 0.10 | 2.11 | |
Enriched | 114.0 | 460.0 | 346.0 | 0.77 | 0.10 | 2.09 | Incl. 232m of | ||
Primary | 460.0 | 463.0 | 3.0 | 0.72 | 0.30 | 3.93 | |||
AZ23293 | 44 | Total | 73.0 | 382.7 | 309.7 | 0.28 | 0.03 | 1.99 | |
Enriched | 73.0 | 218.0 | 145.0 | 0.38 | 0.06 | 3.57 | Incl. 56m of | ||
Primary | 218.0 | 382.7 | 164.7 | 0.20 | 0.01 | 0.60 | |||
AZ23294 | 30 | Total | 90.0 | 218.0 | 128.0 | 0.41 | 0.15 | 6.78 | |
Enriched | 90.0 | 218.0 | 128.0 | 0.41 | 0.15 | 6.78 | Incl. 16m of | ||
AZ23297A | 47 | Total | 74.0 | 360.5 | 286.5 | 0.42 | 0.05 | 1.35 | |
Enriched | 74.0 | 360.5 | 286.5 | 0.42 | 0.05 | 1.35 | Incl. 26m of | ||
AZ23298 | 5a | Total | 294.0 | 600.5 | 306.5 | 0.16 | 0.03 | 1.29 | |
Enriched | 294.0 | 396.0 | 102.0 | 0.20 | 0.03 | 0.66 | |||
Primary | 396.0 | 600.5 | 204.5 | 0.15 | 0.03 | 1.61 | |||
AZ23299B | 23 | Total | 94.0 | 310.0 | 216.0 | 0.21 | 0.25 | 1.41 | |
Enriched | 94.0 | 254.0 | 160.0 | 0.24 | 0.31 | 1.71 | |||
Primary | 254.0 | 310.0 | 56.0 | 0.12 | 0.07 | 0.56 | |||
AZ23300 | 42 | Total | 102.0 | 241.0 | 139.0 | 1.01 | 0.08 | 2.43 | |
Enriched | 102.0 | 241.0 | 139.0 | 1.01 | 0.08 | 2.43 | |||
AZ23301 | 40 | Total | 188.0 | 398.0 | 210.0 | 0.18 | 0.02 | 0.81 | |
Enriched | 188.0 | 398.0 | 210.0 | 0.18 | 0.02 | 0.81 | |||
AZ23303 | 30 | Total | 106.0 | 285.0 | 179.0 | 0.53 | 0.05 | 5.48 | |
Enriched | 106.0 | 234.0 | 128.0 | 0.62 | 0.07 | 7.16 | Incl. 92m of | ||
Primary | 234.0 | 285.0 | 51.0 | 0.31 | 0.01 | 1.27 | |||
AZ23304 | 44 | Total | 134.0 | 387.5 | 253.5 | 0.17 | 0.02 | 0.58 | |
Enriched | 134.0 | 387.5 | 253.5 | 0.17 | 0.02 | 0.58 | |||
AZ23306 | 40 | Total | 172.0 | 476.0 | 304.0 | 0.45 | 0.05 | 1.34 | |
Enriched | 172.0 | 476.0 | 304.0 | 0.45 | 0.05 | 1.34 | |||
AZ23307 | 55 | Total | 134.0 | 184.8 | 50.8 | 0.18 | 0.03 | 0.52 | |
Enriched | 134.0 | 184.8 | 50.8 | 0.18 | 0.03 | 0.52 | |||
AZ23309 | 28 | Total | 88.0 | 299.0 | 211.0 | 0.45 | 0.03 | 1.13 | |
Enriched | 88.0 | 266.0 | 178.0 | 0.49 | 0.03 | 1.22 | Incl. 26m of | ||
Primary | 266.0 | 299.0 | 33.0 | 0.22 | 0.04 | 0.69 | |||
AZ23310 | 26 | Total | 74.0 | 369.6 | 295.6 | 0.20 | 0.03 | 0.83 | |
Enriched | 74.0 | 369.6 | 295.6 | 0.20 | 0.03 | 0.83 | |||
AZ23311 | 44 | Total | 94.0 | 513.0 | 419.0 | 0.40 | 0.03 | 1.12 | |
Enriched | 94.0 | 276.0 | 182.0 | 0.39 | 0.01 | 0.38 | Incl. 52m of | ||
Primary | 276.0 | 513.0 | 237.0 | 0.40 | 0.04 | 1.69 | Incl. 66m of | ||
AZ23312 | 55 | Total | 114.0 | 212.5 | 98.5 | 0.36 | 0.02 | 0.50 | |
Enriched | 114.0 | 194.0 | 80.0 | 0.41 | 0.02 | 0.55 | Incl. 26m of | ||
Primary | 194.0 | 212.5 | 18.5 | 0.15 | 0.02 | 0.28 | |||
AZ23314 | 37 | Total | 102.0 | 316.5 | 214.5 | 0.64 | 0.06 | 1.10 | |
Enriched | 102.0 | 300.0 | 198.0 | 0.66 | 0.06 | 1.12 | Incl. 84m of | ||
Primary | 300.0 | 316.5 | 16.5 | 0.36 | 0.05 | 0.81 | |||
AZ23315 | 37 | Total | 72.0 | 206.4 | 134.4 | 0.32 | 0.10 | 1.84 | |
Enriched | 72.0 | 206.4 | 134.4 | 0.32 | 0.10 | 1.84 | Incl. 72.4m of |
Technical information
The technical content of this press release has been reviewed and approved by Darren King, Director of Exploration of McEwen Copper, who serves as the qualified person (QP) under the definitions of National Instrument 43-101.
All samples were collected in accordance with generally accepted industry standards. Drill core samples, usually taken at 2 m intervals, were split and submitted to the Alex Stewart International laboratory located in the Province of Mendoza, Argentina, for the following assays: gold determination using fire fusion assay and an atomic absorption spectroscopy finish (Au4-30); a 39 multi-element suite using ICP-OES analysis (ICP-AR 39); copper content determination using a sequential copper analysis (Cu-Sequential LMC-140). An additional 19-element analysis (ICP-ORE) was performed for samples with high sulphide content and that exceeded the limits of the ICP-OES analysis.
The company conducts a Quality Assurance/Quality Control program in accordance with NI 43-101 and industry best practices using a combination of standards and blanks on approximately one out of every 25 samples. Results are monitored as final certificates are received, and any re-assay requests are sent back immediately. Pulp and preparation sample analyses are also performed as part of the QAQC process. Approximately
Table 2 – Hole Locations and Lengths for Los Azules Drilling Results
HOLE-ID | Azimuth | Dip | Length | Loc X | Loc Y | Loc Z |
AZ23238 | 205 | -71 | 201.00 | 2383108.93 | 6559892.69 | 3618.48 |
AZ23239 | 90 | -73 | 225.50 | 2383291.79 | 6559109.63 | 3638.32 |
AZ23240 | 250 | -70 | 224.50 | 2383349.87 | 6559430.59 | 3635.63 |
AZ23241 | 250 | -70 | 740.00 | 2382746.14 | 6560826.06 | 3653.29 |
AZ23242 | 257 | -72 | 200.00 | 2383341.59 | 6559657.16 | 3634.88 |
AZ23243 | 47 | -80 | 150.00 | 2383312.1 | 6559713.31 | 3627.57 |
AZ23244A | 250 | -75 | 230.30 | 2383422.55 | 6559609.27 | 3664.48 |
AZ23245 | 270 | -73 | 220.70 | 2383360.72 | 6559558.82 | 3637.93 |
AZ23246 | 236 | -69 | 235.10 | 2383377.45 | 6559341.84 | 3639.54 |
AZ23248 | 242 | -72 | 227.00 | 2383367.74 | 6559510.9 | 3638.59 |
AZ23249 | 248 | -74 | 219.60 | 2382962.63 | 6559241.34 | 3638.21 |
AZ23250 | 238 | -74 | 210.00 | 2383217.21 | 6559241.98 | 3631.86 |
AZ23251 | 250 | -80 | 430.75 | 2383008.71 | 6560126.27 | 3626.21 |
AZ23252 | 216 | -70 | 172.10 | 2382956.7 | 6560008.3 | 3617.5 |
AZ23253 | 70 | -77 | 307.00 | 2383018.5 | 6559063.1 | 3655.9 |
AZ23254 | 251 | -68 | 200.00 | 2383490.5 | 6559498.8 | 3682.1 |
AZ23255 | 70 | -76 | 253.70 | 2383341.6 | 6559657.1 | 3646.8 |
AZ23257 | 60 | -70 | 202.00 | 2383376.7 | 6559342.8 | 3650.5 |
AZ23258A | 250 | -74 | 83.00 | 2383557 | 6558832 | 3663.9 |
AZ23259MET | 250 | -74 | 347.00 | 2382844.65 | 6559742.72 | 3604.22 |
AZ23260 | 250 | -83 | 313.00 | 2383256.27 | 6558935.42 | 3666.58 |
AZ23261 | 250 | -72 | 299.00 | 2383310.44 | 6559019.34 | 3645.87 |
AZ23262 | 54 | -85 | 191.00 | 2383383.41 | 6559180.01 | 3642.08 |
AZ23263 | 250 | -68 | 318.50 | 2383451.34 | 6559272.72 | 3647.94 |
AZ23264 | 70 | -75 | 276.00 | 2382965.36 | 6560055.22 | 3611.83 |
AZ23265 | 70 | -74 | 281.00 | 2383082.7 | 6560043.5 | 3628.43 |
AZ23267 | 246 | -67 | 218.00 | 2383570.34 | 6558891.55 | 3657.03 |
AZ23268 | 70 | -72 | 249.50 | 2383155.92 | 6559856.86 | 3620.7 |
AZ23269 | 50 | -70 | 222.50 | 2383305.74 | 6558902.25 | 3658.88 |
AZ23271 | 250 | -73 | 393.50 | 2383765.83 | 6558804.49 | 3697.56 |
AZ23273 | 250 | -73 | 289.00 | 2383435.28 | 6558680.31 | 3666.67 |
AZ23274 | 70 | -69 | 207.40 | 2382936.99 | 6559938.48 | 3600.47 |
AZ23275 | 270 | -68 | 216.50 | 2383441.31 | 6559053.13 | 3649.14 |
AZ23276 | 250 | -73 | 209.80 | 2383236.54 | 6560054.57 | 3638.55 |
AZ23277 | 250 | -76 | 476.50 | 2383155.65 | 6559962.6 | 3624.46 |
AZ23279 | 250 | -69 | 192.50 | 2383096.12 | 6559997.05 | 3621.08 |
AZ23280 | 70 | -80 | 485.50 | 2382886.31 | 6560080.64 | 3604.87 |
AZ23282A | 70 | -77 | 354.50 | 2383640.7 | 6558970 | 3670.87 |
AZ23283 | 70 | -73 | 342.50 | 2383333.26 | 6558591.57 | 3672.27 |
AZ23284 | 218 | -72 | 264.80 | 2383478.28 | 6558753.12 | 3656.6 |
AZ23285 | 189 | -73 | 256.60 | 2382660.09 | 6560140.26 | 3592.24 |
AZ23286 | 250 | -71 | 329.00 | 2383559.06 | 6559895.32 | 3663.26 |
AZ23289 | 232 | -69 | 278.00 | 2383144.1 | 6559821.65 | 3618.66 |
AZ23290 | 250 | -69 | 260.10 | 2383018.48 | 6559838.85 | 3609.93 |
AZ23291 | 256 | -61 | 241.50 | 2383211.83 | 6559701.44 | 3619.15 |
AZ23292 | 250 | -79 | 463.00 | 2383366.47 | 6559401.53 | 3637.6 |
AZ23293 | 250 | -79 | 382.70 | 2382848.48 | 6559430.82 | 3629.84 |
AZ23294 | 70 | -73 | 218.00 | 2382951.62 | 6558714.14 | 3677.95 |
AZ23297A | 90 | -67 | 360.50 | 2383321.5 | 6559783.34 | 3626.56 |
AZ23298 | 250 | -70 | 600.50 | 2383827.28 | 6557218.92 | 3837.42 |
AZ23299B | 56 | -73 | 310.00 | 2383214.16 | 6558423.55 | 3683.88 |
AZ23300 | 250 | -73 | 241.00 | 2383411.5 | 6559520.86 | 3651.4 |
AZ23301 | 250 | -80 | 398.00 | 2383641.55 | 6559506.34 | 3719.38 |
AZ23303 | 70 | -73 | 285.00 | 2382745.01 | 6558655.69 | 3744.74 |
AZ23304 | 250 | -76 | 387.50 | 2383619.16 | 6559706.95 | 3704.2 |
AZ23306 | 250 | -80 | 476.00 | 2383532.54 | 6559463.46 | 3689.28 |
AZ23307 | 127 | -65 | 184.80 | 2383162.23 | 6560107.98 | 3662.57 |
AZ23309 | 250 | -75 | 299.00 | 2383384.57 | 6558763.83 | 3663.04 |
AZ23310 | 63 | -74 | 369.60 | 2383203.62 | 6558579.65 | 3671.41 |
AZ23311 | 70 | -73 | 513.00 | 2382847.94 | 6559431.92 | 3629.79 |
AZ23312 | 70 | -76 | 212.50 | 2383168.16 | 6560109.28 | 3662.59 |
AZ23314 | 70 | -73 | 316.50 | 2383163.31 | 6559169.16 | 3652.25 |
AZ23315 | 70 | -71 | 206.40 | 2383220.02 | 6559188.86 | 3642.63 |
Coordinates listed in Table 2 based on Gauss Kruger - POSGAR 94 Zone 2 | ||||||
ABOUT MCEWEN COPPER
McEwen Copper is a well-funded, private company which owns
Los Azules is being designed to be distinctly different from a conventional copper mine, consuming significantly less water, emitting much lower carbon and progressing towards carbon neutral by 2038, and being powered by
ABOUT MCEWEN MINING
McEwen Mining is a gold and silver producer with operations in Nevada, Canada, Mexico and Argentina. McEwen Mining also holds a
CAUTION CONCERNING FORWARD-LOOKING STATEMENTS
This news release contains certain forward-looking statements and information, including "forward-looking statements" within the meaning of the Private Securities Litigation Reform Act of 1995. The forward-looking statements and information expressed, as at the date of this news release, McEwen Mining Inc.'s (the "Company") estimates, forecasts, projections, expectations or beliefs as to future events and results. Forward-looking statements and information are necessarily based upon a number of estimates and assumptions that, while considered reasonable by management, are inherently subject to significant business, economic and competitive uncertainties, risks and contingencies, and there can be no assurance that such statements and information will prove to be accurate. Therefore, actual results and future events could differ materially from those anticipated in such statements and information. Risks and uncertainties that could cause results or future events to differ materially from current expectations expressed or implied by the forward-looking statements and information include, but are not limited to, effects of the COVID-19 pandemic, fluctuations in the market price of precious metals, mining industry risks, political, economic, social and security risks associated with foreign operations, the ability of the corporation to receive or receive in a timely manner permits or other approvals required in connection with operations, risks associated with the construction of mining operations and commencement of production and the projected costs thereof, risks related to litigation, the state of the capital markets, environmental risks and hazards, uncertainty as to calculation of mineral resources and reserves, and other risks. Readers should not place undue reliance on forward-looking statements or information included herein, which speak only as of the date hereof. The Company undertakes no obligation to reissue or update forward-looking statements or information as a result of new information or events after the date hereof except as may be required by law. See McEwen Mining's Annual Report on Form 10-K for the fiscal year ended December 31, 2023, and other filings with the Securities and Exchange Commission, under the caption "Risk Factors", for additional information on risks, uncertainties and other factors relating to the forward-looking statements and information regarding the Company. All forward-looking statements and information made in this news release are qualified by this cautionary statement.
The NYSE and TSX have not reviewed and do not accept responsibility for the adequacy or accuracy of the contents of this news release, which has been prepared by the management of McEwen Mining Inc.
Want News Fast?
Subscribe to our email list by clicking here:
https://www.mcewenmining.com/contact-us/#section=followUs
and receive news as it happens!!
WEB SITE | SOCIAL MEDIA | |||||
www.mcewenmining.com | McEwen Mining | Facebook: | facebook.com/mcewenmining | |||
LinkedIn: | linkedin.com/company/mcewen-mining-inc- | |||||
CONTACT INFORMATION | Twitter: | twitter.com/mcewenmining | ||||
150 King Street West | Instagram: | instagram.com/mcewenmining | ||||
Suite 2800, PO Box 24 | ||||||
Toronto, ON, Canada | McEwen Copper | Facebook: | facebook.com/ mcewencopper | |||
M5H 1J9 | LinkedIn: | linkedin.com/company/mcewencopper | ||||
Twitter: | twitter.com/mcewencopper | |||||
Relationship with Investors: | Instagram: | instagram.com/mcewencopper | ||||
(866)-441-0690 - Toll free line | ||||||
(647)-258-0395 | Rob McEwen | Facebook: | facebook.com/mcewenrob | |||
Mihaela Iancu ext. 320 | LinkedIn: | linkedin.com/in/robert-mcewen-646ab24 | ||||
info@mcewenmining.com | Twitter: | twitter.com/robmcewenmux | ||||
Photos accompanying this announcement are available at
https://www.globenewswire.com/NewsRoom/AttachmentNg/33c694f2-b6ae-456d-a566-32248720fdce
https://www.globenewswire.com/NewsRoom/AttachmentNg/16722842-96dd-4a47-beac-2263e2b7337a
https://www.globenewswire.com/NewsRoom/AttachmentNg/8146c956-b3b7-446f-a436-9f7bf9c98461
https://www.globenewswire.com/NewsRoom/AttachmentNg/23733c85-b899-4512-a8b4-5fc735c5f6bb
https://www.globenewswire.com/NewsRoom/AttachmentNg/fcde6690-9948-4c5a-b459-d2cac0c41ebd
FAQ
What were the results of McEwen Copper's feasibility drilling program?
What is the significance of the 2023-2024 drilling campaign for McEwen Copper?
How did McEwen Copper's drilling results affect their resource estimates?
What new discoveries were made during McEwen Copper's exploration?