STOCK TITAN

Lion One Reports New High-grade Gold Results at Tuvatu

Rhea-AI Impact
(Neutral)
Rhea-AI Sentiment
(Neutral)
Tags
Rhea-AI Summary
Lion One Metals reports significant high-grade gold results from grade control drilling at Tuvatu Alkaline Gold Project in Fiji
Positive
  • Significant high-grade gold results from grade control drilling
  • Very high-grade zones identified for mining plan
  • Additional tonnage to be added to stockpile of high-grade material
  • First gold production expected in Q4 2023
Negative
  • None.

North Vancouver, British Columbia--(Newsfile Corp. - September 14, 2023) - Lion One Metals Limited (TSXV: LIO) (OTCQX: LOMLF) (ASX: LLO) ("Lion One" or the "Company") is pleased to report significant new high-grade gold results from ongoing grade control drilling at its 100% owned Tuvatu Alkaline Gold Project in Fiji.

Assay results are presented here for grade control drilling completed in the Zone 2 area of Tuvatu, focusing primarily on the URW1, URA1 and Murau lode systems. Mining of the URA1 lode and the URW1 lode system is ongoing and grade control drilling is being conducted in advance of future mining in these areas (see news releases dated April 3, 2023 and May 18, 2023). The results reported here represent material that is scheduled to be mined in Q4 2023 and throughout 2024.

Lion One Chairman and CEO Walter Berukoff commented: "The results from our grade control drill program continue to exceed expectations. The program is continuously returning very high-grade material with excellent mining widths. As we increase our drill density at Tuvatu we continue to identify very high-grade zones upon which to focus and prioritize our mining plan, and which will help us to add additional tonnage to our growing stockpile of high-grade material as we ramp up to our first gold production in Q4 2023".

Highlights of new Zone 2 grade control drilling (3 g/t Au cutoff):

  • 19.78 g/t Au over 6.0 m (including 31.52 g/t Au over 3.0 m) (TGC-0071, from 114.0 m depth)

  • 14.83 g/t Au over 6.0 m (including 25.16 g/t Au over 2.4 m) (TGC-0055, from 90.9 m depth)

  • 18.08 g/t Au over 3.6 m (including 32.74 g/t Au over 1.5 m) (TGC-0073, from 90.0 m depth)

  • 25.25 g/t Au over 2.4 m (including 149.63 g/t Au over 0.3 m) (TGC-0078, from 95.2 m depth)

  • 45.89 g/t Au over 0.9 m (TGC-0080, from 23.4 m depth)

  • 8.00 g/t Au over 4.8 m (including 21.05 g/t Au over 0.9 m) (TGC-0080, from 47.4 m depth)

  • 8.52 g/t Au over 3.3 m (including 11.16 g/t Au over 1.8 m) (TGC-0053, from 13.8 m depth)

  • 17.73 g/t Au over 1.5 m (including 20.98 g/t Au over 0.9 m) (TGC-0053, from 56.4 m depth)

  • 14.13 g/t Au over 1.8 m (including 18.64 g/t Au over 1.2 m) (TGC-0062, from 67.5 m depth)

Note: Grade control drillhole composites are calculated using a 3 g/t Au cutoff with maximum internal dilution intervals of 1 m at < 3 g/t Au.

Cannot view this image? Visit: https://images.newsfilecorp.com/files/2178/180547_95d72b17646f4852_001.jpg
 
Figure 1. Location of Zone 2 Grade Control Drillholes. Left image: Plan view of Tuvatu showing Zone 2 grade control drillholes in relation to the mineralized lodes. Drillholes are shown in black, mineralized lodes in pale grey, and underground developments in red. The yellow dashed circle represents the Zone 2 area of the deposit.
 
To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/2178/180547_95d72b17646f4852_001full.jpg
 

Table 1. Highlights of composited grade control drill results in the Zone 2 area. Composites are calculated using a 3 g/t Au cutoff with maximum internal dilution intervals of 1 m at <3 g/t Au. For full results see Table 2 in the appendix. For full results using a 0.5 g/t cutoff see Table 3 in the appendix.

Hole ID
FromToInterval (m)Au (g/t)
TGC-0053
13.817.13.38.52

including16.217.10.915.89
TGC-0053
56.457.91.517.73

including56.457.30.920.98

and57.357.90.612.86
TGC-0055
8787.30.317.86
TGC-0055
90.996.9614.83

including90.992.71.812.22

which includes90.991.50.610.93

and91.591.80.323.82

and91.892.70.99.22

and also including94.596.92.425.16

which includes94.595.40.935.76

and95.4960.610.87

and9696.30.330.26

and96.396.90.620.98
TGC-0057
89.491.21.89.22

including89.489.70.319.23
TGC-0057
113.7115.21.510.84

including114.3115.20.915.86
TGC-0060
76.176.40.325.43
TGC-0062
67.569.31.814.13

including68.168.70.615.29

and68.769.30.621.99
TGC-0064
182.9183.50.633.08

including182.9183.20.358.29
TGC-0066
163.5163.80.312.85
TGC-0070
71.271.80.625.89
TGC-0071
114120619.78

including114114.30.330.17

and114.3114.90.68.32

and115.5115.80.310.68

and115.8116.40.69.96

and117120331.52

which includes117117.60.633.78

and117.6118.50.920.88

and118.5119.40.942.75

and119.41200.628.35
TGC-0073
79.881.31.57.91

including79.880.40.610.8

and80.480.70.310.95
TGC-0073
87.988.20.310.85
TGC-0073
9093.63.618.08

including9090.30.38.41

and90.390.60.321.79

and90.992.41.532.74

which includes90.991.20.365.52

and91.291.50.338.81

and91.591.80.343.67

and91.892.40.67.86
TGC-0074
80.881.40.641.5

including80.881.10.335.63

and81.181.40.347.38
TGC-0074
118.9120.11.211.65

including118.9119.20.310.48

and119.2119.50.314.96

and119.5119.80.310.75

and119.8120.10.310.41
TGC-0078
14.514.80.318.52
TGC-0078
91.992.50.620.13
TGC-0078
95.297.62.425.25

including95.295.50.3149.63

and96.197.61.59.28

which includes96.1970.911.85
TGC-0080
2122.21.211.67

and21.621.90.335.67
TGC-0080
23.424.30.945.89
TGC-0080
47.452.24.88

including48.348.60.318.03

and48.648.90.317.95

and49.850.70.921.05

which includes49.850.10.342.72

and50.150.40.315.08
TGC-0082
15.516.71.216.96

including16.116.70.629.06

which includes16.116.40.334.23

and16.416.70.323.89
TGC-0083
19.7200.310.79
TGC-0083
43.745.20.611.32

including43.7440.310.41

and44.945.20.312.23
TGC-0083
56.957.20.310.7
TGC-0083
6565.60.625.12

including6565.30.318.58

and65.365.60.331.67

 

Zone 2

The Zone 2 area of Tuvatu is located in the northwest part of the system along the western decline. It is the first part of the deposit scheduled for mining and encompasses a number of distinct lode systems, including the URW1, URA1, and Murau lode systems.

The URW1 lode system was the primary target for the current round of drilling. It consists predominantly of narrow, high-grade to locally bonanza-grade vein arrays and vein swarms that strike approximately N-S and dip sub-vertically to steeply east. Current modelling suggests that there are multiple separate lodes within the URW1 lode system. The first two of these lodes, URW1a and URW1b, are currently being mined. As reported on July 13, 2023 and July 27, 2023, mineralization in these lodes is both higher grade and more laterally extensive than initially anticipated. Grade control drilling in the URW1 area is targeting the up-dip and down-dip extensions of these lodes, 20 m to 40 m above and below the current mine drives. The URW1 lode system has a current strike length of approximately 300 m in the N-S direction, and a vertical extent of approximately 300 m.

Similarly, the URA1 lode is a narrow, steeply dipping, high-grade to locally bonanza-grade vein system. It was discovered during the development of the western decline and is intersected by the decline at approximately 75 m from the portal entrance. It trends approximately northeast-southwest and dips steeply to the southeast. It has a current strike length of approximately 100 m, and a vertical extent of approximately 120 m.

Cannot view this image? Visit: https://images.newsfilecorp.com/files/2178/180547_95d72b17646f4852_002.jpg
 
Figure 2. URA1 Lode and URW1 Lode System. Plan view (top) and view looking north (bottom) of the URA1 lode and the URW1 lode system in relation to the grade control holes reported here. Mining is ongoing in the URA1 lode (shown in purple) and the URW1a and URW1b lodes (shown in light brown). Additional lodes included in the URW1 lode system are shown in blue. Grade control drilling is targeting the up-dip and down-dip extensions of these lodes, focusing primarily on the URW1a and URW1b lodes, as evident in the bottom image.
 
To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/2178/180547_95d72b17646f4852_002full.jpg
 

The Murau lode system consists of a series of stacked relatively flat lying lodes that strike approximately east-west and dip moderately to the south. Mining is scheduled to begin on the upper part of the Murau lode system in Q4 2023. The portion of the Murau lode system that is currently targeted for mining consists of a 110 m strike length in the east-west direction, a vertical extent of 55 m, and a down-dip extension of 100 m.

Cannot view this image? Visit: https://images.newsfilecorp.com/files/2178/180547_95d72b17646f4852_003.jpg
 
Figure 3. Murau Lode System. Plan view (left) and view looking east (right) of the Murau lode system in relation to the grade control drillholes reported here. Mining on the upper part of the Murau lode system is scheduled to start in Q4 2023. The stacked nature of the Murau lodes and their moderate dip to the south is visible in the right-hand image.
 
To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/2178/180547_95d72b17646f4852_003full.jpg
 

Grade Control Drilling

Cannot view this image? Visit: https://images.newsfilecorp.com/files/2178/180547_95d72b17646f4852_004.jpg
 
Figure 4. Location of High-Grade Intercepts from Zone 2 Grade Control Drilling, 3.0 g/t Au cutoff.
Plan view (top) and view looking north (bottom) of the URA1 lode, the URW1 lode system, and the Murau lode system in relation to the grade control drillholes reported here, with high-grade intercepts highlighted. Downhole composite intervals with grades between 3 and 10 g/t Au are shown in orange, intervals with grades between 10 and 30 g/t Au are shown in red, and intervals over 30 g/t Au are shown in purple. Select high-grade intervals are identified. Grades shown are gold grades in g/t. Underground developments are shown in pale transparent grey to increase visibility of the mineralized intervals.
 
To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/2178/180547_95d72b17646f4852_004full.jpg
 

Grade control drilling is being conducted from underground as well as from near the mine portal and is targeting near surface mineralization scheduled for mining in the next four to sixteen months. It is targeting 5-10 m centers and is designed to provide a detailed understanding of the geometry and mineralization of lode arrays in advance of underground development. Results from the grade control drill program will be used to help optimize mine development and mineral extraction in these areas. The Zone 2 grade control drill program is ongoing. Examples of mineralization observed in the Zone 2 drillholes reported here are shown in Figure 5.

A total of 83 grade control drillholes have been completed to date in the Zone 2 and Zone 5 areas at Tuvatu, including 24 grade control drillholes included in this news release. Previous grade control drill results are available in the news releases dated April 25, 2023 and June 14, 2023.

Cannot view this image? Visit: https://images.newsfilecorp.com/files/2178/180547_95d72b17646f4852_005.jpg
 
Figure 5. Example Mineralization from Zone 2 Grade Control Drilling. Left: Monzonite-hosted chalcedonic silica veins with abundant coarse grained honey sphalerite rimmed by fine-grained sooty pyrite (TGC-0064, 182.9-183.2 m) Width of core is 4.76 cm. Top center: Banded silica-roscoelite-pyrite vein with visible gold (TGC-0076, 89.7-90.0 m) Width of image is approximately 2 cm. Top right: Fracture face coated with silica, sphalerite, pyrite, and multiple grains of visible gold (TGC-0073, 91.5-91.8 m). Core diameter is 4.76 cm. Bottom right: Monzonite-hosted quartz veinlet with visible gold (TGC-0073, 90.3-90.6 m). Width of image is approximately 3 cm. Bottom center: Monzonite-hosted quartz veinlet with multiple flecks of visible gold (TGC-0083, 56.9-57.2 m). Width of image is approximately 3 cm.
 
To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/2178/180547_95d72b17646f4852_005full.jpg
 

About Tuvatu
The Tuvatu Alkaline Gold Project is located on the island of Viti Levu in Fiji. The January 2018 mineral resource for Tuvatu as disclosed in the technical report "Technical Report and Preliminary Economic Assessment for the Tuvatu Gold Project, Republic of Fiji", dated September 25, 2020, and prepared by Mining Associates Pty Ltd of Brisbane Qld, comprises 1,007,000 tonnes indicated at 8.50 g/t Au (274,600 oz. Au) and 1,325,000 tonnes inferred at 9.0 g/t Au (384,000 oz. Au) at a cut-off grade of 3.0 g/t Au. The technical report is available on the Lion One website at www.liononemetals.com and on the SEDAR website at www.sedarplus.ca.

Qualified Person
In accordance with National Instrument 43-101 - Standards of Disclosure for Mineral Projects ("NI 43- 101"), Sergio Cattalani, P.Geo, Senior Vice President Exploration, is the Qualified Person for the Company and has reviewed and is responsible for the technical and scientific content of this news release.

QAQC Procedures
Lion One adheres to rigorous QAQC procedures above and beyond basic regulatory guidelines in conducting its sampling, drilling, testing, and analyses. The Company utilizes its own fleet of diamond drill rigs, using PQ, HQ and NQ sized drill core rods. Drill core is logged and split by Lion One personnel on site. Samples are delivered to and analyzed at the Company's geochemical and metallurgical laboratory in Fiji. Duplicates of all samples with grades above 0.5 g/t Au are both re-assayed at Lion One's lab and delivered to ALS Global Laboratories in Australia (ALS) for check assay determinations. All samples for all high-grade intercepts are sent to ALS for check assays. All samples are pulverized to 85% passing through 75 microns. Gold analysis is carried out using fire assay with an AA finish. Samples that have returned grades greater than 10.00 g/t Au are then re-analyzed by gravimetric method. For samples that return greater than 0.50 g/t Au, repeat fire assay runs are carried out and repeated until a result is obtained that is within 10% of the original fire assay run. Lion One's laboratory can also assay for a range of 71 other elements through Inductively Coupled Plasma Optical Emission Spectrometry (ICP-OES), but currently focuses on a suite of 9 important pathfinder elements. All duplicate anomalous samples are sent to ALS labs in Townsville QLD and are analyzed by the same methods (Au-AA26, and Au-GRA22 where applicable). ALS also analyses 33 pathfinder elements by HF-HNO3-HClO4 acid digestion, HCl leach and ICP-AES (method ME-ICP61).

About Lion One Metals Limited
Lion One's flagship asset is 100% owned, fully permitted high grade Tuvatu Alkaline Gold Project, located on the island of Viti Levu in Fiji. Lion One envisions a low-cost high-grade underground gold mining operation at Tuvatu coupled with exciting exploration upside inside its tenements covering the entire Navilawa Caldera, an underexplored yet highly prospective 7km diameter alkaline gold system. Lion One's CEO Walter Berukoff leads an experienced team of explorers and mine builders and has owned or operated over 20 mines in 7 countries. As the founder and former CEO of Miramar Mines, Northern Orion, and La Mancha Resources, Walter is credited with building over $3 billion of value for shareholders.

On behalf of the Board of Directors of
Lion One Metals Limited
"Walter Berukoff", Chairman and CEO

Contact Investor Relations
Toll Free (North America) Tel: 1-855-805-1250
Email: info@liononemetals.com
Website: www.liononemetals.com

Neither the TSX Venture Exchange nor its Regulation Service Provider accepts responsibility for the adequacy or accuracy of this release

This press release may contain statements that may be deemed to be "forward-looking statements" within the meaning of applicable Canadian securities legislation. All statements, other than statements of historical fact, included herein are forward-looking information. Generally, forward-looking information may be identified by the use of forward-looking terminology such as "plans", "expects" or "does not expect", "proposed", "is expected", "budget", "scheduled", "estimates", "forecasts", "intends", "anticipates" or "does not anticipate", or "believes", or variations of such words and phrases, or by the use of words or phrases which state that certain actions, events or results may, could, would, or might occur or be achieved. This forward-looking information reflects Lion One Metals Limited's current beliefs and is based on information currently available to Lion One Metals Limited and on assumptions Lion One Metals Limited believes are reasonable. These assumptions include, but are not limited to, the actual results of exploration projects being equivalent to or better than estimated results in technical reports, assessment reports, and other geological reports or prior exploration results. Forward-looking information is subject to known and unknown risks, uncertainties and other factors that may cause the actual results, level of activity, performance or achievements of Lion One Metals Limited or its subsidiaries to be materially different from those expressed or implied by such forward-looking information. Such risks and other factors may include, but are not limited to: the stage development of Lion One Metals Limited, general business, economic, competitive, political and social uncertainties; the actual results of current research and development or operational activities; competition; uncertainty as to patent applications and intellectual property rights; product liability and lack of insurance; delay or failure to receive board or regulatory approvals; changes in legislation, including environmental legislation, affecting mining, timing and availability of external financing on acceptable terms; not realizing on the potential benefits of technology; conclusions of economic evaluations; and lack of qualified, skilled labour or loss of key individuals. Although Lion One Metals Limited has attempted to identify important factors that could cause actual results to differ materially from those contained in forward-looking information, there may be other factors that cause results not to be as anticipated, estimated or intended. Accordingly, readers should not place undue reliance on forward-looking information. Lion One Metals Limited does not undertake to update any forward-looking information, except in accordance with applicable securities laws.

 

Appendix 1: Full Drill Results and Collar Information

Table 2. Composited results from grade control drillholes in the Zone 2 area, 3.0 g/t Au cutoff

Hole ID
FromToInterval (m)Au (g/t)
TGC-0053
13.817.13.38.52
TGC-0053including13.814.70.96.47
TGC-0053and15.316.20.96.43
TGC-0053and16.217.10.915.89
TGC-0053
56.457.91.517.73
TGC-0053including56.457.30.920.98
TGC-0053and57.357.90.612.86
TGC-0053
61.862.40.63.61
TGC-0053
67.571.74.23.87
TGC-0053including6969.60.65.35
TGC-0053and69.670.20.65.89
TGC-0053and70.270.80.65.51
TGC-0053and71.471.70.35.07
TGC-0053
72.375.63.35.11
TGC-0053including72.372.60.35.39
TGC-0053and74.474.70.38.54
TGC-0053and74.7750.37.24
TGC-0053and7575.60.68.69
TGC-0054
82.883.40.64.92
TGC-0054
90.390.60.37.71
TGC-0055
13.213.80.68.21
TGC-0055
8787.30.317.86
TGC-0055
90.996.9614.83
TGC-0055including90.992.71.812.22
TGC-0055which includes90.991.50.610.93
TGC-0055and91.591.80.323.82
TGC-0055and91.892.70.99.22
TGC-0055and also including93.393.90.68.52
TGC-0055and also including94.596.92.425.16
TGC-0055which includes94.595.40.935.76
TGC-0055and95.4960.610.87
TGC-0055and9696.30.330.26
TGC-0055and96.396.90.620.98
TGC-0055
108108.60.66.17
TGC-0057
11.412.61.23.4
TGC-0057
85.886.10.37.28
TGC-0057
89.491.21.89.22
TGC-0057including89.489.70.319.23
TGC-0057and89.7900.35.34
TGC-0057and9090.60.67.4
TGC-0057and90.691.20.67.98
TGC-0057
113.7115.21.510.84
TGC-0057including114.3115.20.915.86
TGC-0057
116.7118.82.16.23
TGC-0057including116.7117.60.98.19
TGC-0057and117.9118.80.95.42
TGC-0060
76.176.40.325.43
TGC-0062
67.569.31.814.13
TGC-0062including67.568.10.65.11
TGC-0062and68.168.70.615.29
TGC-0062and68.769.30.621.99
TGC-0062
70.571.10.63.47
TGC-0064
182.9183.50.633.08
TGC-0064including182.9183.20.358.29
TGC-0064and183.2183.50.37.88
TGC-0064
185.3185.60.38.07
TGC-0066
163.5164.10.68.62
TGC-0066including163.5163.80.312.85
TGC-0070
71.271.80.625.89
TGC-0070
78.4790.64.4
TGC-0070
82.983.50.63.94
TGC-0071
95.4960.68.24
TGC-0071
114120619.78
TGC-0071including114114.30.330.17
TGC-0071and114.3114.90.68.32
TGC-0071and115.5115.80.310.68
TGC-0071and115.8116.40.69.96
TGC-0071and117120331.52
TGC-0071which includes117117.60.633.78
TGC-0071and117.6118.50.920.88
TGC-0071and118.5119.40.942.75
TGC-0071and119.41200.628.35
TGC-0071
157.2157.80.65.57
TGC-0072
74.4750.64.46
TGC-0073
79.881.31.57.91
TGC-0073including79.880.40.610.8
TGC-0073and80.480.70.310.95
TGC-0073
87.988.20.310.85
TGC-0073
9093.63.618.08
TGC-0073including9090.30.38.41
TGC-0073and90.390.60.321.79
TGC-0073and90.992.41.532.74
TGC-0073which includes90.991.20.365.52
TGC-0073and91.291.50.338.81
TGC-0073and91.591.80.343.67
TGC-0073and91.892.40.67.86
TGC-0073and also including9393.60.66.49
TGC-0073
106.8107.10.33.02
TGC-0074
1313.30.34.43
TGC-0074
80.881.40.641.5
TGC-0074including80.881.10.335.63
TGC-0074and81.181.40.347.38
TGC-0074
118.9120.11.211.65
TGC-0074including118.9119.20.310.48
TGC-0074and119.2119.50.314.96
TGC-0074and119.5119.80.310.75
TGC-0074and119.8120.10.310.41
TGC-0076
89.7900.37.23
TGC-0076
100.2101.10.96.35
TGC-0076including100.2100.50.36.35
TGC-0076and100.5100.80.37.25
TGC-0076and100.8101.10.35.47
TGC-0076
121.8122.10.35.04
TGC-0078
14.514.80.318.52
TGC-0078
16.617.20.64.42
TGC-0078
87.788.30.63.93
TGC-0078
91.992.50.620.13
TGC-0078
95.297.62.425.25
TGC-0078including95.295.50.3149.63
TGC-0078and96.197.61.59.28
TGC-0078which includes96.1970.911.85
TGC-0078and9797.60.65.43
TGC-0079
102.9103.50.65.02
TGC-0080
2122.21.211.67
TGC-0080including2121.30.37.26
TGC-0080and21.621.90.335.67
TGC-0080
23.424.30.945.89
TGC-0080
47.452.24.88
TGC-0080including47.447.70.35.46
TGC-0080and47.7480.38.1
TGC-0080and48.348.60.318.03
TGC-0080and48.648.90.317.95
TGC-0080and49.850.70.921.05
TGC-0080which includes49.850.10.342.72
TGC-0080and50.150.40.315.08
TGC-0080and50.450.70.35.35
TGC-0080
53.454.30.99.88
TGC-0082
15.516.71.216.96
TGC-0082including16.116.70.629.06
TGC-0082which includes16.116.40.334.23
TGC-0082and16.416.70.323.89
TGC-0082
46.747.60.93.01
TGC-0082
8383.30.33.61
TGC-0083
19.7200.310.79
TGC-0083
42.545.22.74.95
TGC-0083including42.543.10.65.91
TGC-0083and43.7440.310.41
TGC-0083and44.945.20.312.23
TGC-0083
48.549.40.93.9
TGC-0083
52.452.70.33.42
TGC-0083
55.455.70.34.53
TGC-0083
56.957.50.67.24
TGC-0083including56.957.20.310.7
TGC-0083
6565.60.625.12
TGC-0083including6565.30.318.58
TGC-0083and65.365.60.331.67
TGC-0083
110.6110.90.39.08

 

Table 3. Composited results from grade control drillholes in the Zone 2 area, 0.5 g/t Au cutoff

Hole ID
FromToInterval (m)Au (g/t)
TGC-0053
13.817.13.38.52
TGC-0053including13.814.70.96.47
TGC-0053and15.316.20.96.43
TGC-0053and16.217.10.915.89
TGC-0053
2122.21.20.62
TGC-0053
55.257.92.79.96
TGC-0053including56.457.30.920.98
TGC-0053and57.357.90.612.86
TGC-0053
60.363.331.1
TGC-0053
66.976.89.93.71
TGC-0053including6969.60.65.35
TGC-0053and69.670.20.65.89
TGC-0053and70.270.80.65.51
TGC-0053and71.471.70.35.07
TGC-0053and72.372.60.35.39
TGC-0053and74.474.70.38.54
TGC-0053and74.7750.37.24
TGC-0053and7575.60.68.69
TGC-0053
93.9962.11.07
TGC-0053
99100.21.21.36
TGC-0054
82.883.40.64.92
TGC-0054
9090.60.64.95
TGC-0054including90.390.60.37.71
TGC-0054
93.994.50.61.98
TGC-0054
96.397.81.51.17
TGC-0055
13.213.80.68.21
TGC-0055
8787.30.317.86
TGC-0055
90.996.9614.83
TGC-0055including90.992.71.812.22
TGC-0055which includes90.991.50.610.93
TGC-0055and91.591.80.323.82
TGC-0055and91.892.70.99.22
TGC-0055and also including93.393.90.68.52
TGC-0055and also including94.596.92.425.16
TGC-0055which includes94.595.40.935.76
TGC-0055and95.4960.610.87
TGC-0055and9696.30.330.26
TGC-0055and96.396.90.620.98
TGC-0055
99100.21.20.85
TGC-0055
108108.60.66.17
TGC-0055
117.9118.20.32.13
TGC-0057
11.412.61.23.4
TGC-0057
80.482.82.40.76
TGC-0057
85.886.40.64.25
TGC-0057
87.9935.13.66
TGC-0057including89.491.21.89.22
TGC-0057which includes89.489.70.319.23
TGC-0057and89.7900.35.34
TGC-0057and9090.60.67.4
TGC-0057and90.691.20.67.98
TGC-0057
106.5107.40.90.64
TGC-0057
113.7118.85.16.05
TGC-0057including114.3115.20.915.86
TGC-0057and116.7117.60.98.19
TGC-0057and117.9118.80.95.42
TGC-0060
52.4530.60.74
TGC-0060
75.576.71.26.97
TGC-0060including76.176.40.325.43
TGC-0060
82.482.70.30.65
TGC-0062
67.573.86.34.98
TGC-0062including67.569.31.814.13
TGC-0062which includes67.568.10.65.11
TGC-0062and68.168.70.615.29
TGC-0062and68.769.30.621.99
TGC-0064
6969.60.61.59
TGC-0064
145.7146.60.90.54
TGC-0064
149.9150.80.90.51
TGC-0064
167.9168.80.92.77
TGC-0064
174.2174.80.60.96
TGC-0064
182.9183.50.633.08
TGC-0064including182.9183.20.358.29
TGC-0064and183.2183.50.37.88
TGC-0064
185.3185.60.38.07
TGC-0066
163.5164.10.68.62
TGC-0066including163.5163.80.312.85
TGC-0068
88.989.50.60.92
TGC-0068
98.699.20.60.73
TGC-0068
120.5121.40.91.11
TGC-0068
172.4175.12.70.83
TGC-0068
186.7189.42.70.76
TGC-0068
191.2192.71.50.57
TGC-0069
88.4890.61.73
TGC-0070
71.271.80.625.89
TGC-0070
7375.42.41.03
TGC-0070
78.481.12.72.23
TGC-0070
82.384.42.11.54
TGC-0071
95.4960.68.24
TGC-0071
114120.96.917.54
TGC-0071including114114.30.330.17
TGC-0071and114.3114.90.68.32
TGC-0071and115.5115.80.310.68
TGC-0071and115.8116.40.69.96
TGC-0071and117120331.52
TGC-0071which includes117117.60.633.78
TGC-0071and117.6118.50.920.88
TGC-0071and118.5119.40.942.75
TGC-0071and119.41200.628.35
TGC-0071
155.4159.64.22.12
TGC-0071including157.2157.80.65.57
TGC-0071
160.8161.40.62.72
TGC-0071
201.3202.51.21.56
TGC-0072
59.760.30.60.84
TGC-0072
74.4750.64.46
TGC-0072
81.982.50.60.79
TGC-0072
94.595.10.60.9
TGC-0073
1212.60.60.91
TGC-0073
79.881.31.57.91
TGC-0073including79.880.40.610.8
TGC-0073and80.480.70.310.95
TGC-0073
87.394.26.910.39
TGC-0073including87.988.20.310.85
TGC-0073and9090.30.38.41
TGC-0073and90.390.60.321.79
TGC-0073and90.992.41.532.74
TGC-0073which includes90.991.20.365.52
TGC-0073and91.291.50.338.81
TGC-0073and91.591.80.343.67
TGC-0073and91.892.40.67.86
TGC-0073and also including9393.60.66.49
TGC-0073
106.2107.10.92.32
TGC-0074
12.713.30.62.71
TGC-0074
80.581.40.928.01
TGC-0074including80.881.40.641.51
TGC-0074which includes80.881.10.335.63
TGC-0074and81.181.40.347.38
TGC-0074
92.592.80.30.9
TGC-0074
118.9120.11.211.65
TGC-0074including118.9119.20.310.48
TGC-0074and119.2119.50.314.96
TGC-0074and119.5119.80.310.75
TGC-0074and119.8120.10.310.41
TGC-0075
13.214.41.20.61
TGC-0075
16.216.80.60.6
TGC-0075
2727.30.30.53
TGC-0075
43.544.40.90.93
TGC-0076
77.1780.90.98
TGC-0076
8181.30.31.57
TGC-0076
89.7900.37.23
TGC-0076
93.393.60.30.72
TGC-0076
99.3101.72.43.59
TGC-0076including100.2100.50.36.35
TGC-0076and100.5100.80.37.25
TGC-0076and100.8101.10.35.47
TGC-0076
121.8122.10.35.04
TGC-0077
1516.51.50.92
TGC-0077
19.820.10.30.83
TGC-0077
5454.60.61.38
TGC-0077
64.265.41.22.53
TGC-0077
72.974.41.51.11
TGC-0078
14.214.80.610.17
TGC-0078including14.514.80.318.52
TGC-0078
1617.21.23.61
TGC-0078
5252.60.61.55
TGC-0078
87.789.51.82.53
TGC-0078
91.992.50.620.13
TGC-0078
95.298.2320.44
TGC-0078including95.295.50.3149.63
TGC-0078and96.197.61.59.28
TGC-0078which includes96.1970.911.85
TGC-0078and9797.60.65.43
TGC-0079
98.198.70.60.53
TGC-0079
102.9103.50.65.02
TGC-0080
2122.21.211.67
TGC-0080including2121.30.37.26
TGC-0080and21.621.90.335.67
TGC-0080
23.424.30.945.89
TGC-0080
45.355.29.95.16
TGC-0080including47.447.70.35.46
TGC-0080and47.7480.38.1
TGC-0080and48.348.60.318.03
TGC-0080and48.648.90.317.95
TGC-0080and49.850.70.921.05
TGC-0080which includes49.850.10.342.72
TGC-0080and50.150.40.315.08
TGC-0080and50.450.70.35.35
TGC-0080and also including53.454.30.99.88
TGC-0080
70.271.41.20.9
TGC-0080
77.480.12.70.88
TGC-0082
15.516.71.216.96
TGC-0082including16.116.70.629.06
TGC-0082which includes16.116.40.334.23
TGC-0082and16.416.70.323.89
TGC-0082
43.745.51.80.99
TGC-0082
46.748.51.82.2
TGC-0082
49.750.60.90.58
TGC-0082
57.558.71.20.9
TGC-0082
67.768.60.91
TGC-0082
8383.30.33.61
TGC-0083
19.420.30.94.12
TGC-0083including19.7200.310.79
TGC-0083
4146.45.43.13
TGC-0083including42.543.10.65.91
TGC-0083and43.7440.310.41
TGC-0083and44.945.20.312.23
TGC-0083
48.249.41.23.35
TGC-0083
52.452.70.33.42
TGC-0083
55.457.52.13.04
TGC-0083
56.957.20.310.7
TGC-0083
63.565.62.18.24
TGC-0083including6565.60.625.13
TGC-0083which includes6565.30.318.58
TGC-0083and65.365.60.331.67
TGC-0083
67.469.52.10.74
TGC-0083
110.6110.90.39.08

 

Table 4. Collar coordinates for grade control holes reported in this release. Coordinates are in Fiji map grid.

Hole IDEastingNorthingElevationAzimuthDipDepth
TGC-00531876269392075615492.18.1116.6
TGC-005418764373920744139296.3-3.2104.0
TGC-00551876269392075615296.2-32.3134.7
TGC-005718762693920755152116.2-34.1134.7
TGC-006018761823920858167130.5-30.392.3
TGC-006218761823920858167114.3-32.6101.6
TGC-006318761823920858167114.1-17.270.9
TGC-006418761833920858168103.5-8.5230.9
TGC-006618761843920858168103.50.1210.0
TGC-006818761823920858167109.6-22.1231.4
TGC-006918761823920857168125.20.091.4
TGC-007018761823920858167116.6-41.2101.9
TGC-00711876180392085716639.4-51.3221.3
TGC-007218761833920859167104.3-31.1100.5
TGC-007318762683920756152114.4-33.4131.4
TGC-00741876268392075715296.5-39.0131.5
TGC-007518762693920756153102.28.1106.7
TGC-007618763733920627127340.4-24.6137.0
TGC-00771876269392075715493.315.3118.7
TGC-00781876268392075715490.5-33.2116.8
TGC-007918763733920627128333.6-14.5131.2
TGC-00801876269392075815276.2-27.4116.5
TGC-00821876269392075815280.3-33.2121.1
TGC-00831876268392075815267.1-33.0137.6

 

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/180547

LION ONE METALS LTD

OTC:LOMLF

LOMLF Rankings

LOMLF Latest News

LOMLF Stock Data

55.69M
135.26M
8.09%
13.01%
Gold
Basic Materials
Link
United States of America
North Vancouver