LIFT Intersects 14 m at 1.50% Li2O at the BIG East Pegmatite, Including 12 m at 1.73% Li2O, Yellowknife Lithium Project, NWT
- Significant intervals of spodumene mineralization in drill holes
- Impressive size of pegmatite dyke system
- Potential for future drilling
- None.
Vancouver, British Columbia--(Newsfile Corp. - October 4, 2023) - Li-FT Power Ltd. (CSE: LIFT) (OTCQX: LIFFF) (FSE: WS0) ("LIFT" or the "Company") is pleased to report assays from 5 drill holes completed at the Fi Southwest, Shorty, and BIG East pegmatites within the Yellowknife Lithium Project ("YLP") located outside the city of Yellowknife, Northwest Territories (Figure 1). Drilling has intersected significant intervals of spodumene mineralization, with the following highlights:
Highlights:
- YLP0049: 14 m at
1.50% Li2O, including 12 m at1.73% Li2O, (BIG East)
and: 9 m at
and: 12.3 m at
- YLP0048: 12 m at
1.11% Li2O, including 10 m at1.23% Li2O (Shorty)
and: 10 m at
- YLP0051: 15 m at
1.03% Li2O, including 10 m at1.34% Li2O and (Fi SW)
and: 9 m at
Francis MacDonald, CEO of LIFT, comments, "We continue to be impressed with the amount of spodumene pegmatite being intersected at depth at BIG East. The pegmatite dyke system is much larger than we anticipated based on the surface expression. YLP0049 intersected more than 35 meters of pegmatite with an aggregate grade of
"At Fi Southwest, we have constrained the southwestern portion of spodumene within the pegmatite dyke, but also we have opened up a new zone towards the northeast with YLP0051 that intersected two zones for a total width of 24 meters. We believe mineralization is plunging towards the northeast, which opens up an exciting new area to be drilled in the future which has little to no spodumene pegmatite on surface."
Discussion of Drill Results
Drill hole YLP0042 intercepted 22 metres of
Hole YLP0048 was collared in the center of the Shorty pegmatite dyke where it intersected three intervals of the Shorty pegmatite dyke, two of which were spodumene-bearing. The hole intercepted 12 metres of
The BIG East pegmatite was tested by hole YLP0049, which also had three pegmatite intervals. The hole collared in pegmatite at 0.7 metres for 12.3 metres of
Spodumene is the primary lithium mineral constituent of the dykes and occurs with varying amounts of quartz, feldspar, and muscovite. All the dykes are in amphibolite-grade Burwash Formation metasediments.
Drilling Progress Update
Currently, LIFT has reported results from 50 drill holes (8,812 meters). To date, 139 diamond drill holes have been completed (24,500 meters).
Figure 1 - Location of LIFT's Yellowknife Lithium Project. Drilling is focused on the Road Access Group of pegmatites which are located to the east of the city of Yellowknife along a government-maintained paved highway, as well as the Echo target in the Further Afield Group.
To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/8766/182713_9812209a94e8c852_001full.jpg
Figure 2 - Plan view showing the surface expression of the Fi SW pegmatite with diamond drill hole reported in this press release.
To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/8766/182713_9812209a94e8c852_002full.jpg
Figure 3 - Cross-section of YLP0051 which intersected the Fi SW dyke with a 15 m interval of
To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/8766/182713_9812209a94e8c852_003full.jpg
Figure 4 - Plan view showing the surface expression of the Shorty pegmatite with diamond drill holes reported in this press release.
To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/8766/182713_9812209a94e8c852_004full.jpg
Figure 5 - Cross-section of YLP0048 which intersected 12 metres at
To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/8766/182713_9812209a94e8c852_005full.jpg
Figure 6 - Plan view showing the surface expression of the BIG East pegmatite with diamond drill holes reported in this press release.
To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/8766/182713_9812209a94e8c852_006full.jpg
Figure 7 - Cross-section of YLP0049 which intersected 12.3 metres at
To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/8766/182713_9812209a94e8c852_007full.jpg
Table 1 - Assay highlights for drill holes reported in this press release.
Hole No. | From (m) | To (m) | Interval (m) | Li2O% | Dyke |
YLP0042 | 60 | 82 | 22 | 0.98 | Fi-SW |
inc | 61 | 65 | 4 | 1.12 | |
inc | 70 | 81 | 11 | 1.36 | |
YLP0044 | 62 | 69 | 7 | 0.04 | Fi-SW |
and | 88 | 131 | 43 | 0.03 | |
YLP0048 | 45 | 57 | 12 | 1.11 | Shorty |
inc | 46 | 56 | 10 | 1.26 | |
and | 65 | 75 | 10 | 1.46 | |
inc | 65 | 73 | 8 | 1.71 | |
YLP0049 | 0.7 | 13 | 12.3 | 1.28 | BIG-E |
and | 24 | 33 | 9 | 0.66 | |
and | 38 | 52 | 14 | 1.50 | |
inc | 39 | 51 | 12 | 1.73 | |
YLP0051 | 74 | 89 | 15 | 1.03 | Fi-SW |
inc | 78 | 88 | 10 | 1.34 | |
and | 113 | 122 | 9 | 1.03 | |
inc | 115 | 121 | 6 | 1.28 |
Table 2 - Drill collars table of reported drill holes in this press release
Hole No. | Easting1 | Northing1 | Elevation (m) | Length (m) | Azimuth | Dip | Dyke |
YLP0042 | 371,397 | 6,940,913 | 250.0 | 111.0 | 300 | 45 | Fi SW |
YLP0044 | 371,014 | 6,940,326 | 250.9 | 141.0 | 299 | 45 | Fi SW |
YLP0048 | 372,837 | 6,938,093 | 252.7 | 97 | 120 | 45 | Hi |
YLP0049 | 346,036 | 6,932,989 | 212.9 | 82 | 120 | 44 | Big-E |
YLP0051 | 371,391 | 6,941,122 | 251.2 | 138 | 116 | 45 | Fi SW |
1UTM NAD83 zone 12
QA/QC and Core Sampling Protocols
All drill core samples were collected under the supervision of LIFT employees and contractors. Drill core was transported from the drill platform to the logging facility where it was logged, photographed, and split by diamond saw prior to being sampled. Samples were then bagged, and blanks and certified reference materials were inserted at regular intervals. Field duplicates consisting of quarter-cut core samples were also included in the sample runs. Groups of samples were placed in large bags, sealed with numbered tags in order to maintain a chain-of-custody, and transported from LIFT's core logging facility to ALS Labs ("ALS") laboratory in Yellowknife, Northwest Territories.
Sample preparation and analytical work for this drill program were carried out by ALS. Samples were prepared for analysis according to ALS method CRU31: individual samples were crushed to
Qualified Person
The disclosure in this news release of scientific and technical information regarding LIFT's mineral properties has been reviewed and approved by Carl Verley, P.Geo., Vice-President, Exploration of LIFT and a Qualified Person as defined by National Instrument 43-101 Standards of Disclosure for Mineral Projects (NI 43-101).
About LIFT
LIFT is a mineral exploration company engaged in the acquisition, exploration, and development of lithium pegmatite projects located in Canada. The Company's flagship project is the Yellowknife Lithium Project located in Northwest Territories, Canada. LIFT also holds three early-stage exploration properties in Quebec, Canada with excellent potential for the discovery of buried lithium pegmatites, as well as the Cali Project in Northwest Territories within the Little Nahanni Pegmatite Group.
For further information, please contact:
Francis MacDonald
Chief Executive Officer
Tel: + 1.604.609.6185
Email: info@li-ft.com
Website: www.li-ft.com
Daniel Gordon
Investor Relations
Tel: +1.604.609.6185
Email: daniel@li-ft.com
Cautionary Statement Regarding Forward-Looking Information
Certain statements included in this press release constitute forward-looking information or statements (collectively, "forward-looking statements"), including those identified by the expressions "anticipate", "believe", "plan", "estimate", "expect", "intend", "may", "should" and similar expressions to the extent they relate to the Company or its management. The forward-looking statements are not historical facts but reflect current expectations regarding future results or events. This press release contains forward looking statements. These forward-looking statements and information reflect management's current beliefs and are based on assumptions made by and information currently available to the company with respect to the matter described in this new release.
Forward-looking statements involve risks and uncertainties, which are based on current expectations as of the date of this release and subject to known and unknown risks and uncertainties that could cause actual results to differ materially from those expressed or implied by such statements. Additional information about these assumptions and risks and uncertainties is contained under "Risk Factors and Uncertainties" in the Company's latest annual information form filed on March 30, 2023, which is available under the Company's SEDAR+ profile at www.sedarplus.ca, and in other filings that the Company has made and may make with applicable securities authorities in the future. Forward-looking statements contained herein are made only as to the date of this press release and we undertake no obligation to update or revise any forward-looking statements whether as a result of new information, future events or otherwise, except as required by law. We caution investors not to place considerable reliance on the forward-looking statements contained in this press release.
Neither the Canadian Securities Exchange (the "CSE") nor its Regulation Services Provider (as that term is defined in the policies of the CSE) accepts responsibility for the adequacy or accuracy of this release.
To view the source version of this press release, please visit https://www.newsfilecorp.com/release/182713