STOCK TITAN

Kyocera to Build Its Largest Plant in Japan, Increasing Production of Semiconductor Components

Rhea-AI Impact
(Neutral)
Rhea-AI Sentiment
(Neutral)
Tags
Rhea-AI Summary

Kyocera Corporation announced plans to build its largest manufacturing facility in Japan, located at the Sendai Plant Campus in Kagoshima. The new facility aims to meet the rising demand for semiconductor packages used in automotive and communication technologies. Construction is set to begin in May 2022, with a projected opening in October 2023. This expansion is expected to increase production capacity for organic semiconductor packages by 4.5 times and create significant employment opportunities in the region.

Positive
  • Expansion of production capacity by 4.5 times for organic semiconductor packages.
  • Construction of Japan's largest manufacturing facility, boosting local economic development.
  • Creation of new employment opportunities in Kagoshima with the facility's opening.
Negative
  • None.

Expanded Sendai Plant Campus in Kagoshima will meet increasing demand for semiconductor packages powering ADAS, sensor cameras, 5G and more

KYOTO, Japan--(BUSINESS WIRE)-- Kyocera Corporation (hereinafter “Kyocera;” President: Hideo Tanimoto) today announced a plan to build the largest manufacturing facility it has ever operated in Japan, expanding production capacity for components including organic semiconductor packages and crystal device packages. A signing ceremony held April 20, 2022 was attended by Kagoshima Governor Koichi Shiota, Satsumasendai City Mayor Ryoji Tanaka, and Kyocera officials. Construction is scheduled to begin next month at the company’s Sendai Plant Campus in Kagoshima.

Architect’s rendering of the new facility (Plant No.23) (Graphic: Business Wire)

Architect’s rendering of the new facility (Plant No.23) (Graphic: Business Wire)

Three converging factors are creating strong demand for Kyocera’s organic semiconductor packages and crystal device packages. Smart vehicles are expanding the need for automotive cameras and high-performance processors used in Advanced Driver-Assistance Systems (ADAS) and autonomous driving. New communications infrastructures, including fifth-generation (5G) base stations and datacenters, are being deployed worldwide. In addition, the rising trend toward digitalization is expanding demand for electronic products ranging from personal computers and smartphones to consumer goods, industrial automation, and others.

Kyocera will open the new facility in October 2023 to serve these growing trends, aiming for a 4.5-fold increase in production capacity for organic packages at the Sendai Plant Campus, as well as a substantial increase in capacity for crystal device packages.

Kyocera will contribute to the community by stimulating economic development in Kagoshima, creating new employment opportunities through expanded production of semiconductor components in response to global demand.

Outline of New Facility

Name

Plant No.23 at Kyocera’s Kagoshima Sendai Campus

Address

2310-10 Taki-cho, Satsumasendai-shi, Kagoshima Prefecture, Japan

Total investment

Approximately 62.5 billion yen (approx. 488 million U.S. dollars)

Building footprint

12,380 m2 (133,257 f2), steel construction, 6 stories

Total area

65,530 m2 (705,359 f2)

Construction plan

Construction to begin May 2022

Facility to open October 2023

Production items

Organic packages, crystal device packages

Expected production level

Approximately 33 billion yen (approx. 258 million U.S. dollars) per year (April 2024-March 2025)

About KYOCERA

Kyocera Corporation (TOKYO:6971, https://global.kyocera.com/), the parent and global headquarters of the Kyocera Group, was founded in 1959 as a producer of fine ceramics (also known as “advanced ceramics”). By combining these engineered materials with metals and integrating them with other technologies, Kyocera has become a leading supplier of industrial and automotive components, semiconductor packages, electronic devices, smart energy systems, printers, copiers, and mobile phones. During the year ended March 31, 2021, the company’s consolidated sales revenue totaled 1.5 trillion yen (approx. US$13.8 billion). Kyocera is ranked #603 on Forbes magazine’s 2021 “Global 2000” list of the world’s largest publicly traded companies, and has been named by The Wall Street Journal among “The World’s 100 Most Sustainably Managed Companies.”

KYOCERA Corporation (Japan), Corporate Communications

Kenichi Hara, Tel: +81-(0)75-604-3514 Fax: +81-(0)75-604-3516

webmaster.pressgl@kyocera.jp

Source: KYOCERA Corporation

FAQ

What is Kyocera planning for its Sendai Plant Campus in Kagoshima?

Kyocera plans to build its largest manufacturing facility in Japan at the Sendai Plant Campus to meet increasing demand for semiconductor packages.

When is the new Kyocera facility scheduled to open?

The new Kyocera facility is scheduled to open in October 2023.

How much is Kyocera investing in the new manufacturing facility?

Kyocera is investing approximately 62.5 billion yen (around 488 million U.S. dollars) in the new manufacturing facility.

What products will the new Kyocera facility produce?

The new facility will produce organic packages and crystal device packages.

What are the expected production levels for the new Kyocera facility?

The expected production level is approximately 33 billion yen (about 258 million U.S. dollars) per year starting from April 2024.

KYOCERA CORP S/ADR

OTC:KYOCY

KYOCY Rankings

KYOCY Latest News

KYOCY Stock Data

16.85B
1.26B
0.01%
0.01%
Conglomerates
Industrials
Link
United States of America
Kyoto