STOCK TITAN

K92 Mining Updated Kainantu Gold Mine Integrated Development Plan Conference Call Details

Rhea-AI Impact
(Neutral)
Rhea-AI Sentiment
(Neutral)
Tags
conferences

K92 Mining Inc. (TSX: KNT; OTCQX: KNTNF) has announced the upcoming release of its Updated Kainantu Gold Mine Integrated Development Plan. The plan will be released after North American trading markets close on Wednesday, October 16, 2024.

Following the release, K92 will host a conference call and webcast to present the updated plan at 5:30 pm (EDT) on the same day. Interested parties can access the conference call by dialing 1-844-763-8274 (toll-free within North America) or +1-647-484-8814 (from international locations).

Additionally, a live webcast of the conference call will be available through the following link: https://event.choruscall.com/mediaframe/webcast.html?webcastid=XJgneEhG

K92 Mining Inc. (TSX: KNT; OTCQX: KNTNF) ha annunciato il prossimo rilascio del suo Piano di Sviluppo Integrato Aggiornato della Miniera d'Oro Kainantu. Il piano sarà pubblicato dopo la chiusura dei mercati di trading nordamericani, il mercoledì 16 ottobre 2024.

Dopo il rilascio, K92 ospiterà una conference call e webcast per presentare il piano aggiornato alle 17:30 (EDT) dello stesso giorno. Le parti interessate possono accedere alla conference call componendo il 1-844-763-8274 (numeri verdi per il Nord America) o +1-647-484-8814 (da località internazionali).

Inoltre, un webcast dal vivo della conference call sarà disponibile tramite il seguente link: https://event.choruscall.com/mediaframe/webcast.html?webcastid=XJgneEhG

K92 Mining Inc. (TSX: KNT; OTCQX: KNTNF) ha anunciado el próximo lanzamiento de su Plan de Desarrollo Integrado Actualizado de la Mina de Oro Kainantu. El plan se publicará después del cierre de los mercados de trading de América del Norte el miércoles 16 de octubre de 2024.

Después del lanzamiento, K92 llevará a cabo una llamada de conferencia y webcast para presentar el plan actualizado a las 5:30 pm (EDT) del mismo día. Las partes interesadas pueden acceder a la llamada de conferencia marcando el 1-844-763-8274 (sin costo dentro de América del Norte) o +1-647-484-8814 (desde ubicaciones internacionales).

Además, se disponibilizará un webcast en vivo de la llamada de conferencia a través del siguiente enlace: https://event.choruscall.com/mediaframe/webcast.html?webcastid=XJgneEhG

K92 Mining Inc. (TSX: KNT; OTCQX: KNTNF)가 업데이트된 카난투 금광 통합 개발 계획의 출시를 발표했습니다. 이 계획은 2024년 10월 16일 수요일에 북미 거래 시장이 마감된 후에 발표될 예정입니다.

발표 후, K92는 같은 날 오후 5시 30분(EDT)에 업데이트된 계획을 발표하기 위해 컨퍼런스 콜 및 웹캐스트를 개최할 것입니다. 관심 있는 분들은 1-844-763-8274 (북미 내 무료 전화) 또는 +1-647-484-8814 (국제 전화)로 전화하여 컨퍼런스 콜에 참여할 수 있습니다.

또한 컨퍼런스 콜의 실시간 웹캐스트는 다음 링크를 통해 이용할 수 있습니다: https://event.choruscall.com/mediaframe/webcast.html?webcastid=XJgneEhG

K92 Mining Inc. (TSX: KNT; OTCQX: KNTNF) a annoncé la prochaine publication de son Plan de Développement Intégré Mis à Jour de la Mine d'Or Kainantu. Le plan sera publié après la fermeture des marchés de trading nord-américains, le mercredi 16 octobre 2024.

Après le lancement, K92 organisera une conférence téléphonique et un webcast pour présenter le plan mis à jour à 17h30 (EDT) le même jour. Les parties intéressées peuvent accéder à la conférence téléphonique en composant le 1-844-763-8274 (numéro gratuit en Amérique du Nord) ou le +1-647-484-8814 (depuis les lieux internationaux).

De plus, un webcast en direct de la conférence téléphonique sera disponible via le lien suivant : https://event.choruscall.com/mediaframe/webcast.html?webcastid=XJgneEhG

K92 Mining Inc. (TSX: KNT; OTCQX: KNTNF) hat die bevorstehende Veröffentlichung seines Aktualisierten Integrierten Entwicklungsplans für die Kainantu-Goldmine angekündigt. Der Plan wird nach Schließung der nordamerikanischen Handelsmärkte am Mittwoch, den 16. Oktober 2024 veröffentlicht.

Nach der Veröffentlichung wird K92 eine Konferenzschaltung und einen Webcast abhalten, um den aktualisierten Plan am selben Tag um 17:30 Uhr (EDT) vorzustellen. Interessierte können an der Konferenzschaltung teilnehmen, indem sie 1-844-763-8274 (gebührenfrei in Nordamerika) oder +1-647-484-8814 (aus internationalen Standorten) anrufen.

Zusätzlich wird ein Live-Webcast der Konferenzschaltung über den folgenden Link verfügbar sein: https://event.choruscall.com/mediaframe/webcast.html?webcastid=XJgneEhG

Positive
  • None.
Negative
  • None.

VANCOUVER, British Columbia, Oct. 16, 2024 (GLOBE NEWSWIRE) -- K92 Mining Inc. (“K92” or the “Company”) (TSX: KNT; OTCQX: KNTNF) announces that it will release its Updated Kainantu Gold Mine Integrated Development Plan after the North American trading markets close on Wednesday, October 16, 2024.

Conference Call and Webcast to Present Results

K92 will host a conference call and webcast to present the Updated Kainantu Gold Mine Integrated Development Plan at 5:30 pm (EDT) on Wednesday, October 16, 2024.

  • Listeners may access the conference call by dialing toll-free to 1-844-763-8274 within North America or +1-647-484-8814 from international locations.

The conference call will also be broadcast live (webcast) and may be accessed via the following link: https://event.choruscall.com/mediaframe/webcast.html?webcastid=XJgneEhG

About K92

K92 Mining Inc. is engaged in the production of gold, copper and silver at the Kainantu Gold Mine in the Eastern Highlands province of Papua New Guinea, as well as exploration and development of mineral deposits in the immediate vicinity of the mine. The Company declared commercial production from Kainantu in February 2018, is in a strong financial position, and is working to become a Tier 1 mid-tier producer through ongoing plant expansions. K92 is operated by a team of mining company professionals with extensive international mine-building and operational experience.

On Behalf of the Company,

John Lewins, Chief Executive Officer and Director

For further information, please contact David Medilek, P.Eng., CFA, President and Chief Operating Officer at +1-604-416-4445

CAUTIONARY STATEMENT REGARDING FORWARD-LOOKING INFORMATION: This news release includes certain “forward-looking statements” under applicable Canadian securities legislation. Such forward-looking statements include, without limitation: (i) the results of the Kainantu Mine Definitive Feasibility Study, and the Kainantu 2022 Preliminary Economic Assessment, including the Stage 3 Expansion, a new standalone 1.2 mtpa process plant and supporting infrastructure; (ii) statements regarding the expansion of the mine and development of any of the deposits; (iii) the Kainantu Stage 4 Expansion, operating two standalone process plants, larger surface infrastructure and mining throughputs; and (iv) the potential extended life of the Kainantu Mine.

All statements in this news release that address events or developments that we expect to occur in the future are forward-looking statements. Forward-looking statements are statements that are not historical facts and are generally, although not always, identified by words such as “expect”, “plan”, “anticipate”, “project”, “target”, “potential”, “schedule”, “forecast”, “budget”, “estimate”, “intend” or “believe” and similar expressions or their negative connotations, or that events or conditions “will”, “would”, “may”, “could”, “should” or “might” occur. All such forward-looking statements are based on the opinions and estimates of management as of the date such statements are made. Forward-looking statements are necessarily based on estimates and assumptions that are inherently subject to known and unknown risks, uncertainties and other factors, many of which are beyond our ability to control, that may cause our actual results, level of activity, performance or achievements to be materially different from those expressed or implied by such forward-looking information. Such factors include, without limitation, Public Health Crises, including the COVID-19 virus; changes in the price of gold, silver, copper and other metals in the world markets; fluctuations in the price and availability of infrastructure and energy and other commodities; fluctuations in foreign currency exchange rates; volatility in price of our common shares; inherent risks associated with the mining industry, including problems related to weather and climate in remote areas in which certain of the Company’s operations are located; failure to achieve production, cost and other estimates; risks and uncertainties associated with exploration and development; uncertainties relating to estimates of mineral resources including uncertainty that mineral resources may never be converted into mineral reserves; the Company’s ability to carry on current and future operations, including development and exploration activities at the Arakompa, Kora, Judd and other projects; the timing, extent, duration and economic viability of such operations, including any mineral resources or reserves identified thereby; the accuracy and reliability of estimates, projections, forecasts, studies and assessments; the Company’s ability to meet or achieve estimates, projections and forecasts; the availability and cost of inputs; the availability and costs of achieving the Stage 3 Expansion or the Stage 4 Expansion; the ability of the Company to achieve the inputs the price and market for outputs, including gold, silver and copper; failures of information systems or information security threats; political, economic and other risks associated with the Company’s foreign operations; geopolitical events and other uncertainties, such as the conflicts in Ukraine, Israel and Palestine; compliance with various laws and regulatory requirements to which the Company is subject to, including taxation; the ability to obtain timely financing on reasonable terms when required; the current and future social, economic and political conditions, including relationship with the communities in Papua New Guinea and other jurisdictions it operates; other assumptions and factors generally associated with the mining industry; and the risks, uncertainties and other factors referred to in the Company’s Annual Information Form under the heading “Risk Factors”.

Estimates of mineral resources are also forward-looking statements because they constitute projections, based on certain estimates and assumptions, regarding the amount of minerals that may be encountered in the future and/or the anticipated economics of production. The estimation of mineral resources and mineral reserves is inherently uncertain and involves subjective judgments about many relevant factors. Mineral resources that are not mineral reserves do not have demonstrated economic viability. The accuracy of any such estimates is a function of the quantity and quality of available data, and of the assumptions made and judgments used in engineering and geological interpretation, Forward-looking statements are not a guarantee of future performance, and actual results and future events could materially differ from those anticipated in such statements. Although we have attempted to identify important factors that could cause actual results to differ materially from those contained in the forward-looking statements, there may be other factors that cause actual results to differ materially from those that are anticipated, estimated, or intended. There can be no assurance that such statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking statements. The Company disclaims any intention or obligation to update or revise any forward-looking statements, whether as a result of new information, future events or otherwise, except as required by law.


FAQ

When will K92 Mining (KNTNF) release its Updated Kainantu Gold Mine Integrated Development Plan?

K92 Mining will release its Updated Kainantu Gold Mine Integrated Development Plan after the North American trading markets close on Wednesday, October 16, 2024.

What time is the K92 Mining (KNTNF) conference call to present the Updated Kainantu Gold Mine Plan on October 16, 2024?

The conference call and webcast to present the Updated Kainantu Gold Mine Integrated Development Plan is scheduled for 5:30 pm (EDT) on Wednesday, October 16, 2024.

How can investors access the K92 Mining (KNTNF) conference call on October 16, 2024?

Investors can access the conference call by dialing 1-844-763-8274 (toll-free within North America) or +1-647-484-8814 (from international locations).

Is there a webcast available for K92 Mining's (KNTNF) Updated Kainantu Gold Mine Plan presentation?

Yes, a live webcast of the conference call will be available through the link: https://event.choruscall.com/mediaframe/webcast.html?webcastid=XJgneEhG

K92 MINING INC

OTC:KNTNF

KNTNF Rankings

KNTNF Latest News

KNTNF Stock Data

1.57B
211.62M
2.52%
54.75%
Gold
Basic Materials
Link
United States of America
Vancouver