KBR Awarded Front End Engineering Design Contract for Equinor Bay du Nord FPSO Project
KBR announced that KBR Industrial Canada Co. has received a Letter of Intent from Equinor Canada for the front-end engineering design (FEED) of topside facilities for the Bay Du Nord floating production, storage, and offloading facility (FPSO) located offshore Newfoundland, Canada. This agreement includes an option for ongoing design and procurement management. KBR's work will contribute to one of the world's lowest carbon-emitting FPSOs, utilizing advanced technology to minimize emissions. This contract builds on KBR's previous work in pre-FEED engineering conducted in 2022, with production expected to commence in the late 2020s.
- Received Letter of Intent for FEED of Bay Du Nord FPSO from Equinor Canada.
- Contract includes option for detailed design and procurement management.
- Focus on developing one of the lowest carbon-emitting FPSOs in the world.
- Builds upon KBR's previous engineering work, creating continuity and expertise.
- Production timeline extends to the late 2020s, which may delay revenue generation.
The agreement also includes an option for continuation of detailed design and procurement management services through to final completion of the FPSO. The FEED scope comes on the back of the pre-FEED engineering carried out by KBR in 2022 and will further mature the engineering and execution planning, working towards a final investment decision with first production expected to be in the late 2020s.
During the FEED engineering, KBR will continue to help Equinor develop one of the lowest carbon emitting FPSO's in the world, using an onboard combined cycle power system and the latest technology to minimize the number of crew onboard and maximize digital solutions. All these elements will produce energy safely and securely while minimizing carbon emissions.
KBR will execute the work scope jointly with Canadian sub-contractor
The Bay du Nord FPSO is a deep-water facility utilizing industry leading technology and digital solutions to ensure safe and reliable production. This award builds upon KBR's unrivalled knowledge and expertise in this arena.
"We are excited to be a part of this significant project with Equinor," said
We deliver science, technology and engineering solutions to governments and companies around the world. KBR employs approximately 30,000 people performing diverse, complex and mission-critical roles in 34 countries.
KBR is proud to work with its customers across the globe to provide technology, value-added services, and long-term operations and maintenance services to ensure consistent delivery with predictable results. At KBR, We Deliver.
Visit www.kbr.com
The Bay du Nord project (BdN) consists of several oil discoveries in the
The optimization of the Bay du Nord development project is ongoing to make it more robust for the future market and evaluation to include confirmed new discoveries in adjacent license EL1156 (Cappahayden and Cambriol). Equinor is working Together with their partner in the discoveries BP, towards a final investment decision with first oil expected to be produced in the late 2020's.
Learn more at www.hatch.com
The statements in this press release that are not historical statements, including statements regarding the company's work on the Bay Du Nord FPSO facility and the expected production timeline, are forward-looking statements within the meaning of the federal securities laws. These statements are subject to numerous risks, uncertainties and assumptions, many of which are beyond the company's control, that could cause actual results to differ materially from the results expressed or implied by the statements. These risks, uncertainties and assumptions include, but are not limited to, those set forth in the company's most recently filed Annual Report on Form 10-K, any subsequent Form 10-Qs and 8-Ks and other
View original content to download multimedia:https://www.prnewswire.com/news-releases/kbr-awarded-front-end-engineering-design-contract-for-equinor-bay-du-nord-fpso-project-301786489.html
SOURCE
FAQ
What is the Letter of Intent KBR received from Equinor Canada about?
When is first production expected for the Bay Du Nord project?
What technology will KBR use for the Bay Du Nord FPSO project?
What is the significance of KBR's contract with Equinor Canada?