Imperial Mining Files for US and Canadian Patents for Its Scandium and Rare Earth Metallurgical Extraction Process
Imperial Mining Group Ltd. (OTCQB: IMPNF) has filed patent applications for innovative methods of extracting scandium and rare earth elements from its Crater Lake project. The patent, submitted on December 6, 2022, with the USPTO and CIPO, focuses on high-pressure caustic leaching processes. The company is advancing its Crater Lake flowsheet development program, partially financed by a $245,355 grant from the Quebec government. The program aims to optimize mineral processing by removing olivine from concentrates, enhancing scandium recovery. Results are expected by March 2023, supporting the design of a Pilot Plant set to start later this year.
- Filed patent applications for innovative extraction methods for scandium and rare earths.
- Received a $245,355 grant from Quebec for the Crater Lake project.
- Optimized mineral processing to enhance scandium recovery by removing olivine.
- None.
MONTREAL, Feb. 02, 2023 (GLOBE NEWSWIRE) -- Imperial Mining Group Ltd. ("Imperial") (TSX VENTURE: IPG) (OTCQB: IMPNF) is pleased to announce the filling of patent applications for its two-stage hydrometallurgical methods and processes for the extraction of scandium (Sc) and rare earth elements (REE) from Crater Lake project mineralization.
The patent titled “HIGH PRESSURE CAUSTIC LEACH METHODS AND PROCESSES FOR RECOVERY OF SCANDIUM AND RARE-EARTH OXIDES” was filed on December 6, 2022, with the United States Patent and Trademark Office (USPTO, Application Number: 18/062,318), and Canada Intellectual Property Office (CIPO, Application Number 3,183,459). The US patent application has been assigned to an Examiner, who will conduct a search for relevant references to the invention and will examine the application according to its filing date. IPG will file a Request for Examination with the CIPO after the successful examination by USPTO and within four years of the filing date.
IPG is also pleased to provide an update on the Crater Lake Scandium Project flowsheet development program which commenced in early 2022 at SGS Canada, Quebec City and Peterborough and is partially financed from a
The flowsheet development program was focused on further optimization of the mineral processing flowsheet by rejecting olivine, a non-Sc-REE-bearing mineral from the mineral concentrate and processing of the olivine-depleted mineral concentrate through the patent-pending high-pressure caustic leach process for recovery of Sc and REE. During the flowsheet development program, IPG invented a patentable process for rejecting olivine from the scandium-bearing mineral concentrate. Olivine response to conventional mineral processing techniques (magnetic separation, flotation, electrostatic, and density) is like those of the scandium-bearing pyroxene and amphibole minerals, making it difficult to separate and diluting the Sc-REE grade of the concentrate. In addition, the solvent extraction (SX) circuit for the recovery of Sc and REE from leach solution has also been defined and successfully tested.
The development program that commenced on January 31st, 2022, is being undertaken by SGS Canada with expected completion by the end of March 2023. Results from the work will aid in the engineering design of Imperial’s Pilot Plant program for Crater Lake, set to commence later in 2023.
QUALIFIED PERSON
The technical content in this press release was reviewed and certified by Dr. Yemi Oyediran, an Ontario-registered P. Eng., Imperial's Vice President, Metallurgical Development.
ABOUT IMPERIAL MINING GROUP LTD.
Imperial is a Canadian mineral exploration and development company focused on the advancement of its technology metals projects in Québec. Imperial is publicly listed on the TSX Venture Exchange as “IPG” and on the OTCQB Exchange as “IMPNF” and is led by an experienced team of mineral exploration and development professionals with a strong track record of mineral deposit discovery in numerous metal commodities.
For further information please contact:
Peter J. Cashin President and Chief Executive Officer Phone: +1 (514) 360-0571 Email: info@imperialmgp.com | ||
Website: www.imperialmgp.com | Twitter: @imperial_mining | Facebook: Imperial Mining Group |
This press release may contain forward-looking statements relating to the Company’s operations or to its business environment. Such statements are based on the Company’s operations, estimates, forecasts, and projections, but are not guarantees of future performance and involve risks and uncertainties that are difficult to predict or control. Several factors could cause actual outcomes and results to differ materially from those expressed. These factors include those set forth in the corporate filings. Although any such forward-looking statements are based upon what management believes to be reasonable assumptions, the Company cannot guarantee that actual results will be consistent with these forward-looking statements. In addition, the Company disclaims any intention or obligation to update or revise any forward-looking statements, for any reason. We also do not commit in any way to guarantee that we will continue reporting on items or issues that arise. Investors are cautioned that this press release contains quoted historical exploration results. These are derived from filed assessment reports and compiled from governmental databases. The Company and a QP have not independently verified and make no representations as to the accuracy of historical exploration results: these results should not be relied upon. Selected highlight results may not be indicative of average grades.
Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.
FAQ
What is the recent patent application filed by Imperial Mining Group?
When was the patent application for scandium extraction submitted?
What financial support did Imperial Mining receive for its project?
What is the timeline for the Crater Lake project flowsheet development?