i-80 Gold Reports Q2 2024 Operating Results
i-80 Gold Corp (TSX: IAU, NYSE: IAUX) reported Q2 2024 operating results:
- Accessed first mineralized material at South Pacific Zone of Granite Creek mine
- Q2 gold sales of 1,636 ounces at $2,361/oz
- YTD gold sales of 4,122 ounces at $2,193/oz
- Q2 revenue of $7.2 million, YTD revenue of $15.6 million
- Q2 net loss of $25.4 million, YTD net loss of $36.6 million
- Completed public offering to strengthen financial position
- Advancing exploration, drilling and studies at Nevada projects
- Transitioning to US GAAP reporting starting in 2025
The company continues to progress its Nevada gold projects towards commercial production, with a focus on developing Granite Creek, McCoy-Cove and Ruby Hill mines.
i-80 Gold Corp (TSX: IAU, NYSE: IAUX) ha riportato i risultati operativi del secondo trimestre del 2024:
- Accesso al primo materiale mineralizzato nella zona South Pacific della miniera Granite Creek
- Vendite di oro nel Q2 per 1.636 once a $2.361/oncia
- Vendite di oro da inizio anno di 4.122 once a $2.193/oncia
- Entrate nel Q2 di $7,2 milioni, entrate da inizio anno di $15,6 milioni
- Perdita netta nel Q2 di $25,4 milioni, perdita netta da inizio anno di $36,6 milioni
- Completata un'offerta pubblica per rafforzare la posizione finanziaria
- Avanzamento delle esplorazioni, perforazioni e studi nei progetti del Nevada
- Transizione alla rendicontazione secondo i principi contabili GAAP degli Stati Uniti a partire dal 2025
L'azienda continua a far progredire i suoi progetti auriferi nel Nevada verso la produzione commerciale, con un focus sullo sviluppo delle miniere Granite Creek, McCoy-Cove e Ruby Hill.
i-80 Gold Corp (TSX: IAU, NYSE: IAUX) informó sobre los resultados operativos del segundo trimestre de 2024:
- Se accedió al primer material mineralizado en la zona South Pacific de la mina Granite Creek
- Ventas de oro en el Q2 de 1,636 onzas a $2,361/onza
- Ventas de oro acumuladas de 4,122 onzas a $2,193/onza
- Ingresos del Q2 de $7.2 millones, ingresos acumulados de $15.6 millones
- Pérdida neta en el Q2 de $25.4 millones, pérdida neta acumulada de $36.6 millones
- Se completó una oferta pública para fortalecer la posición financiera
- Avanzando en la exploración, perforación y estudios en los proyectos de Nevada
- Transición a la contabilidad GAAP de EE. UU. a partir de 2025
La compañía sigue avanzando en sus proyectos de oro en Nevada hacia la producción comercial, enfocándose en desarrollar las minas de Granite Creek, McCoy-Cove y Ruby Hill.
i-80 Gold Corp (TSX: IAU, NYSE: IAUX)가 2024년 2분기 운영 결과를 보고했습니다:
- 그라나이트 크릭 광산의 South Pacific Zone에서 첫 번째 광물화된 물질에 접근함
- 2분기 금 판매량 1,636온스, 1온스당 $2,361
- 연초부터 현재까지 금 판매량 4,122온스, 1온스당 $2,193
- 2분기 수익 $7.2백만, 연초부터 현재까지 수익 $15.6백만
- 2분기 순손실 $25.4백만, 연초부터 현재까지 순손실 $36.6백만
- 재정 강화를 위한 공개 모집 완료
- 네바다 프로젝트에서 탐사, 시추 및 연구 추진 중
- 2025년부터 미국 GAAP 회계 기준으로 전환 예정
회사는 그라나이트 크릭, 맥코이-코브 및 루비 힐 광산을 개발하는 데 주력하며, 네바다의 금 프로젝트를 상업 생산으로 진행하고 있습니다.
i-80 Gold Corp (TSX: IAU, NYSE: IAUX) a rapporté les résultats opérationnels du deuxième trimestre 2024 :
- Accès au premier matériau minéralisé dans la zone South Pacific de la mine de Granite Creek
- Ventes d'or au T2 de 1 636 onces à 2 361 $/once
- Ventes d'or depuis le début de l'année de 4 122 onces à 2 193 $/once
- Chiffre d'affaires au T2 de 7,2 millions de dollars, chiffre d'affaires depuis le début de l'année de 15,6 millions de dollars
- Perte nette au T2 de 25,4 millions de dollars, perte nette depuis le début de l'année de 36,6 millions de dollars
- Offre publique complétée pour renforcer la position financière
- Avancement de l'exploration, de la foration et des études dans les projets du Nevada
- Passage à la comptabilité US GAAP à partir de 2025
L'entreprise continue de faire progresser ses projets aurifères du Nevada vers une production commerciale, avec un accent sur le développement des mines de Granite Creek, McCoy-Cove et Ruby Hill.
i-80 Gold Corp (TSX: IAU, NYSE: IAUX) hat die Betriebsergebnisse für das zweite Quartal 2024 berichtet:
- Erster Zugang zu mineralisiertem Material in der South Pacific Zone der Granite Creek Mine
- Goldverkäufe im Q2 von 1.636 Unzen zu $2.361/Unze
- Goldverkäufe seit Jahresbeginn von 4.122 Unzen zu $2.193/Unze
- Q2-Umsatz von $7,2 Millionen, Umsatz seit Jahresbeginn von $15,6 Millionen
- Q2-Nettoverlust von $25,4 Millionen, Nettoverlust seit Jahresbeginn von $36,6 Millionen
- Öffentliches Angebot abgeschlossen, um die finanzielle Position zu stärken
- Fortschritte bei Erkundungs-, Bohr- und Studienprojekten in Nevada
- Übergang zur Berichterstattung nach US-GAAP ab 2025
Das Unternehmen arbeitet weiterhin an seinen Goldprojekten in Nevada, um die kommerzielle Produktion voranzutreiben, mit Fokus auf die Entwicklung der Granit Creek-, McCoy-Cove- und Ruby-Hill-Minen.
- Accessed first mineralized material at South Pacific Zone of Granite Creek mine
- Completed public offering to strengthen financial position
- Q2 gold sales of 1,636 ounces at $2,361/oz, up from $2,193/oz YTD average
- Advancing exploration and development at multiple Nevada gold projects
- High-grade drill results at McCoy-Cove project, including 48.3 g/t Au over 3.0m
- Q2 net loss of $25.4 million, wider than $22.8 million loss in Q2 2023
- YTD net loss of $36.6 million
- Q2 revenue decreased to $7.2 million from $11.3 million in Q2 2023
- $8.8 million inventory impairment in Q2 2024
- Transitioning to US GAAP reporting in 2025 expected to increase administrative costs
Insights
i-80 Gold's Q2 2024 results reveal mixed performance. Revenue decreased to $7.2 million from $11.3 million in Q2 2023, while the operating loss widened to $25.4 million from $22.8 million. However, the company made progress on key projects:
- Accessed first mineralized material at Granite Creek's South Pacific Zone
- Completed 14,382 feet of drilling at McCoy-Cove
- Advanced metallurgical testing at Ruby Hill
The realized gold price of $2,361 per ounce in Q2 is positive, but production remains low at 1,636 ounces. The company's focus on exploration and development rather than current production suggests a long-term growth strategy. The transition to US GAAP reporting in 2025 and potential increased administrative costs are factors to watch.
i-80 Gold's Q2 results highlight its transition from exploration to production. The access to the South Pacific Zone at Granite Creek is a significant milestone, potentially leading to increased future production. The company's multi-asset strategy in Nevada is progressing, with advancements at McCoy-Cove and Ruby Hill.
However, current production levels are low and the $11.9 million mine operating loss indicates challenges in achieving profitability at current scales. The high-grade drill results at McCoy-Cove (e.g., 48.3 g/t Au over 3.0 m) are promising for future development. The ongoing metallurgical work and potential joint venture at Ruby Hill could diversify the company's portfolio and reduce risk.
Investors should monitor progress on the Lone Tree refurbishment, as this central processing facility is important to i-80's hub-and-spoke model and future production growth.
i-80's unaudited condensed consolidated interim financial statements ("Financial Statements"), as well as i-80's Management's Discussion and Analysis of Operations and Financial Condition ("MD&A") for the three and six months ended June 30, 2024, are available on the Company's website at www.i80gold.com, on SEDAR+ at www.sedarplus.ca, and on EDGAR at www.sec.gov.
Unless otherwise stated, all amounts referred to herein are in
Highlights
Second Quarter
- First mineralized material was accessed at South Pacific Zone at the Granite Creek mine in June, 2024.
- 3,760 feet of horizontal and vertical advancement at the Granite Creek mine.
- Commenced underground delineation drilling of the CSD Gap and Helen zones at the McCoy-Cove project (14,382 feet).
- Q2 2024 gold sales of 1,636 ounces at a realized gold price of
1 per ounce.$2,361 - 9,361 tons of mineralized material sold for total revenues of
.$5.9 million
Year to Date
- Completed 17,976 feet of exploration drilling at McCoy-Cove.
- Completed 6,938 feet of horizontal and vertical advancement at the Granite Creek mine.
- YTD gold sales of 4,122 ounces at a realized gold price of
1 per ounce.$2,193 - 19,528 tons of mineralized material sold (5,183 tons of sulfide mineralized material) for total revenues of
.$9.1 million - A total of 40,447 feet (core and RC) drilled YTD with multiple positive results to expand mineralization further at the Ruby Hill mine, the Granite Creek mine and the McCoy-Cove project.
"The bought deal public offering completed during Q2 strengthens our financial flexibility and positions the Company to continue to execute on its plans", stated Ryan Snow, Chief Financial Officer of i-80. "We continue to advance exploration, definition drilling, economic studies and permitting activities at our projects to advance towards the ultimate goal of building a mid-tier
Production and sales totaled 1,636 gold ounces for the quarter and 4,122 gold ounces year to date (YTD) at a realized gold price of
Exploration, evaluation, and pre-development costs were
Three months ended | Six months ended | |||
(in thousands of | 2024 | 2023 | 2024 | 2023 |
Revenue | 7,184 | 11,310 | 15,597 | 15,859 |
Cost of sales(1) | (18,994) | (12,188) | (26,897) | (18,731) |
Depletion, depreciation and amortization(1) | (74) | (2,724) | (451) | (4,145) |
Mine operating loss | (11,884) | (3,602) | (11,751) | (7,017) |
Expenses | ||||
Exploration, evaluation, and pre-development | 5,065 | 11,095 | 7,848 | 20,074 |
General and administrative | 6,007 | 4,397 | 10,585 | 9,588 |
Property maintenance | 1,864 | 2,781 | 5,269 | 5,230 |
Share-based payments | 612 | 903 | 1,141 | 2,211 |
Operating loss | (25,432) | (22,778) | (36,594) | (44,120) |
(1) | For the three and six months ended June 30, 2024, includes an inventory impairment of |
Granite Creek
Highlights for the three and six months ended June 30, 2024, include:
- 33,469 wet tons of mineralized material were mined and added to the stockpile as of Q2 2024.
- Sale of total mineralized material of 9,361 tons for proceeds of
for the three months ended June 30, 2024.$5.9 million - Sale of total mineralized material of 19,528 tons YTD for proceeds of
for the six months ended June 30, 2024.$9.1 million - First mineralized material was accessed at South Pacific Zone at the Granite Creek mine in June, 2024.
- 3,760 feet of combined horizontal and vertical advancement in Q2 2024.
"Granite Creek achieved a milestone in the second quarter of accessing the first mineralized material out of the South Pacific Zone", stated Matt Gili, President and Chief Operating Officer of i-80. "Subsequent to the end of the period, initial test mining of the first level of the South Pacific Zone was completed in the uppermost part of the deposit. The grade reconciliation was consistent with the Company model with more tons of mineralized material mined than modelled, leading to a positive reconciliation on gold production from the first level."
The current priority at Granite Creek during the first half of the year was to gain access to the South Pacific Zone that is expected to be the primary zone for mining in the future. Installation of infrastructure required to provide for the execution of a long-term mine plan continues. As mine workings continue to go deeper, the management of water inflows into the underground workings is a top priority for initiating commercial production. Water is managed through a combination of de-watering wells and underground sumps and the Company is enhancing its de-watering capabilities by adding wells (completed installation of "Well 6") and is initiating the deepening of existing de-watering wells to increase flow and extend their useful life.
The Company continues to encounter elevated oxide mineralized material with approximately
During the three months ended June 30, 2024, a total of 15,935 feet of surface RC drilling and 2,504 feet of directional core drilling was completed. One of the primary surface targets is testing the northern extension of the South Pacific Zone where previous drilling indicated that the horizon remained open along strike to the north and where there has been only limited previous drilling. While completing a pre-collar for a step-out hole, mineralization was intersected in the Upper Comus containing coarse pyrite mineralization that assayed 6.8 g/t Au over 3.0 m, providing a new target for future exploration. Additionally, multiple zones of faulting and alteration were intersected in an additional step-out hole prior to reaching target depth, providing additional targets for future drilling.
The Company has determined that it will be more efficient, and more cost effective, to complete definition drilling of the South Pacific Zone from an underground platforms. The Company is in the process of analyzing options for the underground drill platform and will recommence definition drilling of the South Pacific Zone later this year. Drilling highlights for the quarter include:
- GCPU24-02: 22.0 g/t Au over 29.0 m
- GCPU24-04: 11.0 g/t Au over 22.4 m
- GCPU24-04: 60.5 g/t Au over 4.1 m
McCoy-Cove
The Cove deposit and the McCoy-Cove Property is expected to be the core asset in the Company's "hub and spoke" business plan and likely the highest-grade gold deposit in i-80's portfolio. The primary focus is to complete the ongoing underground drill program in advance of the completion of a Feasibility Study. This program has been highly successful in demonstrating continuity of high-grade mineralization, confirming Cove as one of
- iCHU24-01: 48.3 g/t Au over 3.0 m (Lower Helen Zone)
- and 15.8 g/t Au over 15.8 m (Lower Helen Zone)
- iCHU24-04: 14.3 g/t Au over 13.5 m (Lower Helen Zone)
- iCHU24-08: 15.1 g/t Au over 7.4 m (Lower Helen Zone)
- and 22.6 g/t Au over 7.1 m (Lower Helen Zone)
- iCHU24-12: 7.8 g/t Au over 28.7 m (Lower Helen Zone)
- iCHU24-14: 13.7 g/t Au over 7.2 m (Lower Helen Zone)
- and 10.4 g/t Au over 38.8 m (Lower Helen Zone)
- and 11.0 g/t Au over 20.6 m (Lower Helen Zone)
Highlights for the three and six months ended June 30, 2024, include:
- Achieved high grade infill drilling results at the Helen and Gap zones for the three and six months ended June 30, 2024.
- 14,382 feet of drilling completed for the three months ended June 30, 2024.
- 17,976 feet of drilling completed for the six months ended June 30, 2024.
- Baseline field studies including vegetation, migration birds, geochemical, and hydrological continue to move forward.
- Preliminary work has also commenced on the baseline air quality impact analysis report, global climate change technical memo, and baseline geochemical characterization report.
- The initial hydrology model has been completed, and the Company is currently optimizing the design of the de-watering infrastructure based on this model.
Ruby Hill
Highlights for the three and six months ended June 30, 2024, include:
- Advanced metallurgical testing on gold, base metal, and polymetallic deposits including the Hilltop and FAD zones for the three months ended June 30, 2024.
- Advancing permitting for water pollution control permit and social-economical baseline report.
- Residual leaching activities at Ruby Hill produced and sold 510 ounces of gold during the quarter and 954 ounces of gold YTD at a realized gold price of
and$2,331 per ounce sold1, respectively.$2,183 - As the heap leach pad is nearing the end of its production cycle the Company continues to analyze the breakeven cost to determine when the heap leach pad will cease production.
- Discussions are ongoing with the potential JV partner.
During the three months ended June 30, 2024, metallurgical work continued at FAD, Blackjack, and the Hilltop zones.The Company continued to evaluate metallurgical data from the drilling completed in the first half of the year as part of the due diligence related to the potential joint venture of the Property. Negotiations related to the multiple documents and agreements required for the planned joint venture partner are ongoing and have advanced significantly in recent weeks. The Company was able to utilize the data from these drilling activities and metallurgical studies to advance knowledge of the potential resource base and metallurgical characteristics of the deposit. The Ruby Hill Property provides significant diversification as it is host to oxide gold, sulphide gold, polymetallic CRD and skarn base metal mineralization. Metallurgical work continues on the flotation optimization of base metals at the Hilltop deposit and to explore the potential to enhance recoveries of the Mineral Point oxide Au-Ag deposit.
More recently, the Company has commissioned a Scoping Study to provide an initial assessment of the economics of the Mineral Point deposit. Mineral Point is the largest gold deposit in i-80's portfolio and could provide for a substantial future production growth opportunity.
Lone Tree
Lone Tree is expected to become the hub of i-80's
During the quarter, the Company continued its review of the value engineering studies and total refurbishment costs for the autoclave.
Lone Tree produced and sold from its residual leaching activities 1,126 ounces of gold during the quarter and 3,168 ounces of gold YTD at a realized gold price of
RECENT DEVELOPMENTS
Shelf Prospectus
The Company obtained a receipt for a final short form base shelf prospectus on June 24, 2024 (the "Canadian Shelf Prospectus"). The Canadian Shelf Prospectus was filed with the securities regulators in each province and territory of
These filings provide added financial flexibility and allow the Company to make offerings of common shares, warrants, debt securities, subscription receipts and units (collectively, the "Securities"), or any combination thereof, from time to time over a 25-month period in both
Transition to US Generally Accepted Accounting Principles
Historically, the Company has prepared its financial statements under IFRS Accounting Standards for reporting as permitted by security regulators in
The Company will hold a conference call and webcast on August 13, 2024, commencing at 10:00 am ET to discuss its second quarter results and answer questions from participants.
Webcast and Conference Call Participant Details:
Webcast URL: https://app.webinar.net/A5n1xDOkwv2
Conference Call Information:
North American Toll-free: 1-800-836-8184
Local Toronto: 1-289-819-1350
Qualified Persons
Tyler Hill, CPG-12146, Chief Geologist, and Tim George, PE, Mining Operations Manager, at i-80 have reviewed this press release and are the Qualified Persons for the information contained herein and are a "Qualified Person" within the meaning of National Instrument 43-101.
About i-80 Gold Corp.
i-80 Gold Corp. is a
Forward-looking information
Certain statements in this release constitute "forward-looking statements" or "forward-looking information" within the meaning of applicable securities laws, including but not limited to, actual production results and costs, results of operation outcomes and timing of updated technical studies at the Company's mineral projects, timing to advance mineral projects to production and advance permitting and feasibility work on its mineral projects and future production, development and exploration results, the expectation that Lone Tree will become the hub of i-80's
Forward-looking statements and information involve significant risks and uncertainties, should not be read as guarantees of future performance or results and will not necessarily be accurate indicators of whether or not such results will be achieved. A number of factors could cause actual results to differ materially from the results discussed in the forward-looking statements or information, including, but not limited to: material adverse changes, unexpected changes in laws, rules or regulations, or their enforcement by applicable authorities; the failure of parties to contracts with the company to perform as agreed; social or labor unrest; changes in commodity prices; and the failure of exploration programs or studies to deliver anticipated results or results that would justify and support continued exploration, studies, development or operations. For a more detailed discussion of such risks and other factors that could cause actual results to differ materially from those expressed or implied by such forward-looking statements, refer to i-80's filings with Canadian securities regulators, including the most recent Annual Information Form, available on SEDAR+ at www.sedarplus.ca.
NON-IFRS FINANCIAL PERFORMANCE MEASURES
The Company has included certain terms or performance measures commonly used in the mining industry that are not defined under IFRS Accounting Standards in this document. These include: adjusted net earnings and average realized price per ounce. Non-IFRS financial performance measures do not have any standardized meaning prescribed under IFRS Accounting Standards, and therefore, they may not be comparable to similar measures employed by other companies. The data presented is intended to provide additional information and should not be considered in isolation or as a substitute for measures prepared in accordance with IFRS Accounting Standards and should be read in conjunction with the Company's Financial Statements.
Definitions
Adjusted earnings / (loss) and adjusted earnings / (loss) per share excludes from net earnings / (loss) significant write-down adjustments and the gain / (loss) from financing instruments.
Average realized gold price represents the sales price of gold per ounce before deducting mining royalties, treatment and refining charges and gains or losses derived from the offtake agreement with Orion.
Average realized gold price per ounce of gold sold
Average realized gold price per ounce of gold sold is a non-IFRS measure and does not constitute a measure recognized by IFRS Accounting Standards and does not have a standardized meaning defined by IFRS Accounting Standards. It may not be comparable to information in other gold producers' reports and filings.
Three months ended | Six months ended | ||||
(in thousands of | 2024 | 2023 | 2024 | 2023 | |
Revenue per financial statements | $ | 7,184 | 11,310 | 15,597 | 15,859 |
Mineralized material sales revenue | $ | (3,288) | (2,821) | (6,486) | (2,821) |
Revenue without mineralized material sales (i) | $ | 3,896 | 8,489 | 9,111 | 13,038 |
Silver revenue from mining operations | $ | (34) | (41) | (71) | (61) |
Gold revenue from mining operations | $ | 3,862 | 8,448 | 9,040 | 12,977 |
Ounces of gold sold | ounce | 1,636 | 4,329 | 4,122 | 6,678 |
Average realized gold price | $/ounce | 2,361 | 1,951 | 2,193 | 1,943 |
Lone Tree | |||||
Revenue per financial statements | $ | 2,682 | 5,370 | 6,985 | 6,675 |
Silver revenue from mining operations | $ | (9) | (15) | (28) | (19) |
Gold revenue from mining operations | $ | 2,673 | 5,355 | 6,957 | 6,656 |
Ounces of gold sold | ounce | 1,126 | 2,700 | 3,168 | 3,363 |
Average realized gold price | $/ounce | 2,374 | 1,983 | 2,196 | 1,979 |
Ruby Hill | |||||
Revenue per financial statements | $ | 1,214 | 3,119 | 2,126 | 5,502 |
Silver revenue from mining operations | $ | (25) | (26) | (43) | (42) |
Gold revenue from mining operations | $ | 1,189 | 3,093 | 2,083 | 5,460 |
Ounces of gold sold | ounce | 510 | 1,629 | 954 | 2,871 |
Average realized gold price | $/ounce | 2,331 | 1,899 | 2,183 | 1,902 |
Granite Creek | |||||
Revenue per financial statements | $ | 3,288 | 2,821 | 6,486 | 3,682 |
Mineralized material sales revenue | $ | (3,288) | (2,821) | (6,486) | (2,821) |
Revenue without mineralized material sales (i) | $ | — | — | — | 861 |
Silver revenue from mining operations | $ | — | — | — | — |
Gold revenue from mining operations | $ | — | — | — | 861 |
Ounces of gold sold | ounce | — | — | — | 444 |
Average realized gold price | $/ounce | — | — | — | 1,939 |
(i) Does not include revenue from mineralized material sales. |
Adjusted loss
Adjusted loss and adjusted loss per share are non-IFRS measures that the Company considers to better reflect normalized earnings because it eliminates non-recurring items. Certain items that become applicable in a period may be adjusted for, with the Company retroactively presenting comparable periods with an adjustment for such items and conversely, items no longer applicable may be removed from the calculation. Neither adjusted loss nor adjusted loss per share have any standardized meaning prescribed by IFRS Accounting Standards and are therefore unlikely to be comparable to similar measures presented by other companies.
The following table shows a reconciliation of adjusted loss to the net earnings / (loss) for each period. Adjusted loss and adjusted loss per share exclude a number of temporary or one-time items detailed in the following table:
Three months ended | Six months ended | |||
(in thousands of | 2024 | 2023 | 2024 | 2023 |
Net loss for the period | $ (36,831) | $ (15,962) | $ (52,546) | $ (29,078) |
Adjust for: | ||||
Gain on convertible loans | 3,030 | 2,097 | 9,145 | 10,463 |
Gain on warrants | 1,645 | 4,607 | 4,275 | 10,175 |
(Loss) gain on gold prepay derivative | (1,417) | 838 | (4,915) | (2,252) |
(Loss) gain on silver purchase derivative | (4,445) | 1,309 | (5,302) | 452 |
Gain on convertible debenture | — | 900 | — | 900 |
Loss on gold prepay agreement modification | (667) | — | (667) | — |
Loss on silver purchase agreement modification | (440) | — | (440) | — |
Loss on deferred consideration | — | (351) | — | (778) |
Inventory impairments | (8,764) | (4,506) | (8,764) | (8,531) |
Total adjustments | $ (11,058) | $ 4,894 | $ (6,668) | $ 10,429 |
Adjusted loss for the period | $ (25,773) | $ (20,856) | $ (45,878) | $ (39,507) |
Weighted average shares for the period | 361,145,495 | 265,433,411 | 333,234,688 | 255,573,142 |
Adjusted loss per share for the period | $ (0.07) | $ (0.08) | $ (0.14) | $ (0.15) |
1 Specified financial measure which is not a standardized measure under IFRS and may not be comparable to similar specified financial measures used by other entities. Please see "Non-IFRS Financial Performance Measures" for the composition of such specified financial measure, an explanation of how such specified financial measure provides useful information to a reader and the purposes for which management of i-80 uses the specified financial measure, and where required, a reconciliation of the specified financial measure to the most directly comparable IFRS measure.
View original content to download multimedia:https://www.prnewswire.com/news-releases/i-80-gold-reports-q2-2024-operating-results-302220369.html
SOURCE i-80 Gold Corp
FAQ
What were i-80 Gold's (IAUX) Q2 2024 gold sales and revenue?
What major milestone did i-80 Gold (IAUX) achieve at its Granite Creek mine in Q2 2024?
What were the financial results for i-80 Gold (IAUX) in Q2 2024?