STOCK TITAN

Hut 8 Announces US$50 Million Credit Facility

Rhea-AI Impact
(Neutral)
Rhea-AI Sentiment
(Neutral)
Tags

TORONTO, June 26, 2023 /PRNewswire/ - Hut 8 Mining Corp. (Nasdaq: HUT) (TSX: HUT) ("Hut 8" or the "Company"), one of North America's largest, innovation-focused digital asset mining pioneers, and high performance computing infrastructure provider, announced today that, together with its subsidiary, Hut 8 Holdings Inc. (the "Borrower"), it has entered into a US$50 million credit facility (the "Credit Facility") with Coinbase Credit, Inc., as lender. The loan proceeds will be used for general corporate purposes.

"This credit facility gives us additional financial flexibility," said CEO Jaime Leverton. "At the same time, it ensures that we can maintain our dynamic Bitcoin treasury management strategy going into the halving."

The Credit Facility provides a US$15 million term loan which is expected to be funded at or shortly following closing. The Credit Facility also provides an option of drawing an additional US$20 million delayed-draw term loan tranche in a second borrowing between one and two months following closing, as well as an option of further drawing an additional US$15 million delayed-draw term loan tranche in a third borrowing within 15 business days following completion of the previously announced merger between Hut 8 and U.S. Data Mining Group, Inc. (d/b/a "US Bitcoin Corp."), in each case subject to maintaining a specified loan-to-value ratio.

All amounts borrowed under the Credit Facility will bear interest at a rate equal to (a) the greater of (i) the federal funds rate on the date of the applicable borrowing, and (ii) 3.25%, plus (b) 5.0%. The Credit Facility matures 364 days after the date of the first borrowing. The obligations under the Credit Facility are secured by the Borrower's interest in certain Bitcoin held in the custody of Coinbase Custody Trust Company, LLC and are guaranteed by the Company.

About Hut 8

Hut 8 is one of North America's largest innovation-focused digital asset miners, led by a team of business-building technologists, bullish on bitcoin, blockchain, Web 3.0, and bridging the nascent and traditional high performance computing worlds. With two operational digital asset mining sites located in Southern Alberta, Hut 8 has one of the highest capacity rates in the industry and one of the highest inventories of unencumbered, self-mined Bitcoin of any digital asset miner or publicly-traded company globally. With over 36,000 square feet of geo-diverse data centre space and cloud capacity connected to electrical grids powered by significant renewables and emission-free resources, Hut 8 is revolutionizing conventional assets to create the first hybrid data centre model that serves both the traditional high performance compute (Web 2.0) and nascent digital asset computing sectors, blockchain gaming, and Web 3.0. Hut 8 was the first Canadian digital asset miner to list on the Nasdaq Global Select Market. Through innovation, imagination, and passion, Hut 8 is helping to define the digital asset revolution to create value and positive impacts for its shareholders and generations to come.

Cautionary Note Regarding Forward-Looking Information

This press release includes "forward-looking information" and "forward-looking statements" within the meaning of Canadian securities laws and United States securities laws, respectively (collectively, "forward-looking information"). All information, other than statements of historical facts, included in this press release that address activities, events or developments that the Company expects or anticipates will or may occur in the future, including such things as future business strategy, competitive strengths, goals, expansion and growth of the Company's businesses, operations, plans and other such matters is forward-looking information. Forward-looking information is often identified by the words "may", "would", "could", "should", "will", "intend", "plan", "anticipate", "allow", "believe", "estimate", "expect", "predict", "can", "might", "potential", "predict", "is designed to", "likely" or similar expressions. In addition, any statements in this press release that refer to expectations, projections or other characterizations of future events or circumstances contain forward-looking information and include, among others, statements regarding: the expected use of proceeds from the Credit Facility, the Company's ability to draw upon one or more tranches of the loan, the timing of each draw and the consummation of the Merger.

Statements containing forward-looking information are not historical facts, but instead represent management's expectations, estimates and projections regarding future events based on certain material factors and assumptions at the time the statement was made. While considered reasonable by Hut 8 as of the date of this press release, such statements are subject to known and unknown risks, uncertainties, assumptions and other factors that may cause the actual results, level of activity, performance or achievements to be materially different from those expressed or implied by such forward-looking information, including but not limited to, security and cybersecurity threats and hacks, malicious actors or botnet obtaining control of processing power on the Bitcoin network, further development and acceptance of the Bitcoin network, changes to Bitcoin mining difficulty, loss or destruction of private keys, increases in fees for recording transactions in the Blockchain, erroneous transactions, reliance on a limited number of key employees, reliance on third party mining pool service providers, regulatory changes, classification and tax changes, momentum pricing risk, fraud and failure related to digital asset exchanges, difficulty in obtaining banking services and financing, difficulty in obtaining insurance, permits and licenses, internet and power disruptions, geopolitical events, uncertainty in the development of cryptographic and algorithmic protocols, uncertainty about the acceptance or widespread use of digital assets, failure to anticipate technology innovations, the COVID-19 pandemic, climate change, currency risk, lending risk and recovery of potential losses, litigation risk, business integration risk, changes in market demand, changes in network and infrastructure, system interruption, changes in leasing arrangements, failure to achieve intended benefits of power purchase agreements, potential for interrupted delivery, or suspension of the delivery, of energy to the Company's mining sites, and other risks related to the digital asset and data centre business. For a complete list of the factors that could affect the Company, please see the "Risk Factors" section of the Company's Annual Information Form dated March 9, 2023, and Hut 8's other continuous disclosure documents which are available on the Company's profile on the System for Electronic Document Analysis and Retrieval at www.sedar.com and on the EDGAR section of the U.S. Securities and Exchange Commission's website at www.sec.gov.

These factors are not intended to represent a complete list of the factors that could affect Hut 8; however, these factors should be considered carefully. There can be no assurance that such estimates and assumptions will prove to be correct. Should one or more of these risks or uncertainties materialize, or should assumptions underlying the forward-looking information prove incorrect, actual results may vary materially from those described in this press release as intended, planned, anticipated, believed, sought, proposed, estimated, forecasted, expected, projected or targeted and such forward-looking information included in this press release should not be unduly relied upon. The impact of any one assumption, risk, uncertainty, or other factor on a particular forward-looking statement cannot be determined with certainty because they are interdependent and Hut 8's future decisions and actions will depend on management's assessment of all information at the relevant time. The forward-looking information contained in this press release is made as of the date of this press release, and Hut 8 expressly disclaims any obligation to update or alter statements containing any forward-looking information, or the factors or assumptions underlying them, whether as a result of new information, future events or otherwise, except as required by law.

Cision View original content to download multimedia:https://www.prnewswire.com/news-releases/hut-8-announces-us50-million-credit-facility-301861407.html

SOURCE Hut 8 Mining Corp

Hut 8 Corp.

NASDAQ:HUT

HUT Rankings

HUT Latest News

HUT Stock Data

2.16B
38.83M
58.67%
60.62%
9.32%
Capital Markets
Finance Services
Link
United States of America
MIAMI