Silver Hammer Mining Reports High-Grade Assays from Initial Sampling Program at its Eliza Silver Project in Nevada
Silver Hammer Mining Corp. (CSE: HAMR, OTCQB: HAMRF) has announced high-grade silver assays from its initial sampling program at the Eliza Silver Project in Eastern Nevada. A total of 73 rock-chip samples were collected, confirming a silver-rich mineral system enriched with copper, lead, and zinc. The historic Passynak Mine, part of the Hamilton mining district, produced over 30 million ounces of silver. Future plans include using advanced technology to further explore the property and define drill targets for 2022.
- High-grade silver assays confirmed from rock-chip samples.
- Evidence of mineralization extending from the historic Passynak Mine.
- Presence of copper, lead, and zinc indicates a potentially valuable mineral system.
- Plans for advanced exploration technology to assess the site further.
- None.
VANCOUVER, British Columbia, Dec. 06, 2021 (GLOBE NEWSWIRE) -- Silver Hammer Mining Corp. (CSE: HAMR, OTCQB: HAMRF) (“Silver Hammer” or the “Company”) is pleased to report high-grade silver assays for a number of rock samples collected during its first sampling program at the Company’s Eliza Silver Project in Eastern Nevada.
A total of 73 rock-chip samples were collected in the vicinity of the historic Passynak Mine within the Eliza project area which lies on trend of the Hamilton mining district, Nevada’s highest grade silver mining camp. An estimated over 30 million ounces of silver was produced, valued at
In addition to the assayed samples, another 35 geochemical survey samples were collected from outcrops in the northern sector of the property, south of the Eberhardt Fault which separates the Eliza Project from the abandoned Hamilton mines to the north. The assay results confirm the existence of a well-developed silver-rich mineral system that also shows enrichments in copper (Cu), lead (Pb) and zinc (Zn). Other trace elements conventionally viewed as indicators of epithermal precious metal mineralization, such as antimony (Sb) and arsenic (As), are also present in geochemically anomalous amounts.
“We are very pleased with the results obtained by our first sampling program at Eliza. The high-grade mineralized samples provide evidence that the near-surface silver mineralization exploited by the former 30 Moz Treasure Hill Mine extends onto the Eliza property and may continue beneath a shale unit south of the Eberhardt Fault,” stated President and CEO Morgan Lekstrom. “We are also encouraged by the association of silver with base metals (Cu, Pb, Zn), as this type of mineralization may be an outer zone expression of a ‘blind’ porphyry copper system. We intend to use modern technology, including hyperspectral imaging to expand our knowledge of the geologic model and define its size potential. In addition, we intend to define drill targets for 2022.”
In addition to the targeted rock sampling that was done, the Company has undertaken hyperspectral imaging analysis of the Eliza property area. Interpretation of the imagery shows a correlation between secondary silver mineralization, mainly chloraryrite, and areas where hydrocarbon decay are outlined. This innovative exploration technology will be further employed on the property.
Plans are underway for additional geological and geochemical investigations, with the objective of defining high-potential drill targets early in 2022.
Table 1. Eliza - Significant Mineralized Rock Samples
https://www.globenewswire.com/NewsRoom/AttachmentNg/bdcfc422-9e67-4d00-afcc-0a5863af54bd
Table 2. Eliza - Mineral Correlations to Silver
https://www.globenewswire.com/NewsRoom/AttachmentNg/6ee72663-e5aa-4126-b651-f393351b3051
Figure 1. Eliza Property Rock Sample Location Map
https://www.globenewswire.com/NewsRoom/AttachmentNg/a05f7c20-6393-4cb1-b00d-3789c90937ae
About Silver Hammer Mining Corp.
Silver Hammer Mining Corp. is a junior resource company advancing the past-producing Silver Strand Mine in the Coeur d’Alene Mining District in Idaho, USA, both the Eliza Silver Project and the Silverton Silver Mine in one of the world’s most prolific mining jurisdictions in Nevada and the Lacy Gold Project in British Columbia, Canada. The Company has commenced an initial drill program at Silver Strand that will test for silver and gold mineralization immediately below the mine’s lowest level extending only 90 metres below surface. Silver Hammer strives to become a multiple-mine silver producer and will focus near-term exploration and drilling plans at the Company’s Idaho and Nevada silver-gold assets.
*Mineralization hosted on adjacent and/or nearby properties is not necessarily indicative of mineralization hosted on the Company’s property.
On Behalf of the Board of Silver Hammer Mining Corp..
Morgan Lekstrom, President and CEO
Corporate Office: 551 Howe Street, Vancouver, British Columbia V6C 2C2, Canada
For further information contact: Kristina Pillon, President, High Tide Consulting Corp.
T: 604.908.1695
E: investors@silverhammermining.com
For media inquiries, contact: Adam Bello, Primoris Group Inc.
T: 416.489.0092
E: media@primorisgroup.com
The CSE does not accept responsibility for the adequacy or accuracy of this release.
The Canadian Securities Exchange has neither approved nor disapproved the contents of this press release.
___________________________________
1 USGD: https://mrdata.usgs.gov/mrds/show-mrds.php?dep_id=10310457