GoGold Reports Parral Production for Quarter Ending June 2023 and Reports on Planned Zinc Circuit
- 375,112 silver equivalent ounces produced in Q2 2023
- Anticipated net increased cash flows of $1.5 million per quarter from the zinc circuit
- Zinc circuit capital expenditure estimated at $2 million over 6 months
- Project payback expected within 6 months after construction
- No interruption to current operations is expected
Shares Outstanding: 326,301,011
Trading Symbols: TSX: GGD
OTCQX: GLGDF
HALIFAX, NS, July 12, 2023 /PRNewswire/ - GoGold Resources Inc. (TSX: GGD) (OTCQX: GLGDF) ("GoGold", "the Company") is pleased to report production for the quarter ending June 30, 2023 of 375,112 silver equivalent ounces, consisting of 203,894 silver ounces, 1,512 gold ounces, and 135 tonnes of copper.
The Company has completed bench scale and in-field heap leach testing that has demonstrated that an addition of a zinc circuit to the SART plant should produce a saleable zinc product and more importantly regenerate cyanide that will greatly increase cash flow at our Parral operation over the next seven years of mine life.
Summary of Zinc circuit effects:
- Saleable zinc precipitate to be added to the revenue stream
- Regeneration of approximately 750 tons of cyanide per quarter
- Anticipated to generate net increased cash flows of
per quarter$1.5 million - Zinc circuit capital expenditure estimated at
over 6 month construction period$2 million - Project payback expected within 6 months after construction
- Construction of zinc circuit is independent of current SART operations, therefore no interruption to current operations is expected
- Parral up to end of its mine life will be a producer of silver, gold, copper and zinc
"During the quarter at Parral, we continued with our planned reprocessing of old pad material which resulted in further metal extraction plus reclamation of new pad space which has the benefit of delaying further pad capital expenditure. In addition, we have been working on further optimization of the SART process to generate an additional saleable metal (zinc) and more importantly, the regeneration and recycling of more cyanide which has the benefit of reducing the volume of fresh cyanide required for purchase. Our expectation is the circuit will generate an additional
Table 1: Quarterly Production Summary
Quarter Ended | Mar 2022 | Jun 2022 | Sep 2022 | Dec 2022 | Mar 2023 | Jun 2023 |
Silver Production (oz) | 186,655 | 213,495 | 145,944 | 159,838 | 173,717 | 203,894 |
Gold Production (oz) | 2,791 | 3,081 | 2,278 | 2,399 | 2,016 | 1,512 |
Copper Production (tonnes) | 125 | 98 | 124 | 222 | 143 | 135 |
Silver Equivalent Production (oz)1 | 455,991 | 509,796 | 400,467 | 441,217 | 400,145 | 375,112 |
1. "Silver equivalent production" include gold ounces and copper tons produced and converted to a silver |
Mr. Robert Harris, P.Eng. is the qualified person as defined by National Instrument 43-101 and is responsible for the technical information of this release.
GoGold Resources (TSX: GGD) is a Canadian-based silver and gold producer focused on operating, developing, exploring and acquiring high quality projects in
The securities described herein have not been, and will not be, registered under the United States Securities Act of 1933, as amended (the "
This news release may contain "forward-looking information" as defined in applicable Canadian securities legislation. All statements other than statements of historical fact, included in this release, including, without limitation, statements regarding production and cash flows of the Parral tailings mine, the ability of GoGold to self fund its ongoing exploration and administrative costs, future operating margins, future production and processing, and future plans and objectives of GoGold, constitute forward looking information that involve various risks and uncertainties. Forward-looking information is based on a number of factors and assumptions which have been used to develop such information but which may prove to be incorrect, including, but not limited to, assumptions in connection with the continuance of GoGold and its subsidiaries as a going concern, general economic and market conditions, mineral prices, the accuracy of mineral resource estimates, and the performance of the Parral project. There can be no assurance that such information will prove to be accurate and actual results and future events could differ materially from those anticipated in such forward-looking information.
Important factors that could cause actual results to differ materially from GoGold's expectations include exploration and development risks associated with GoGold's projects, the failure to establish estimated mineral resources or mineral reserves, volatility of commodity prices, variations of recovery rates, and global economic conditions. For additional information with respect to risk factors applicable to GoGold, reference should be made to GoGold's continuous disclosure materials filed from time to time with securities regulators, including, but not limited to, GoGold's Annual Information Form. The forward-looking information contained in this release is made as of the date of this release.
View original content to download multimedia:https://www.prnewswire.com/news-releases/gogold-reports-parral-production-for-quarter-ending-june-2023-and-reports-on-planned-zinc-circuit-301875186.html
SOURCE GoGold Resources Inc.
FAQ
What is the production for the quarter ending June 30, 2023?
What is the expected cash flow increase from the zinc circuit?
What is the estimated capital expenditure for the zinc circuit?