Monarch Mining Corporation (TSX: GBAR, OTCQX: GBARF) released a technical report for its Beaufor Mine project, indicating substantial increases in gold resources. The report estimates a Measured Resource of 328,500 tonnes at 5.7 g/t Au (59,900 ounces) and an Indicated Resource of 956,400 tonnes at 5.2 g/t Au (159,300 ounces). The Inferred Resource surged by 307% to 818,900 tonnes at 4.7 g/t Au (122,500 ounces). This updated estimate incorporates extensive drill results and a refined modeling approach, comprising 166 mineralized zones. Approximately 24,700 meters of ongoing drilling remain unaccounted for in this estimate.
- Measured Resource of 328,500 tonnes at 5.7 g/t Au (59,900 ounces) increases
- Indicated Resource of 956,400 tonnes at 5.2 g/t Au (159,300 ounces) reported
- Inferred Resource up 307% to 818,900 tonnes at 4.7 g/t Au (122,500 ounces)
- New resource estimate includes 166 mineralized zones and extensive drill results
- None.
- The Beaufor Mine technical report shows an estimated Measured Mineral Resource of 328,500 tonnes grading at 5.7 g/t Au for a total of 59,900 ounces of gold and an estimated Indicated Mineral Resource of 956,400 tonnes grading at 5.2 g/t Au for a total of 159,300 ounces, a significant increase compared to the previous mineral resource estimate (see press release dated January 28, 2021).
- Inferred resource estimated at 818,900 tonnes grading 4.7 g/t Au for a total of 122,500 ounces, a
307% increase (+92,400 ounces) versus the resource estimate announced in January 2021. - Mineral resource estimate (MRE) developed for an underground scenario using cut-off grades of 2.8 g/t Au (>=45 degree dip) and 3.2 g/t Au (<45 degree dip). The cut-off grades were calculated using a gold price of US
$1,550 per ounce. - The new MRE includes 166 mineralized zones with a minimum true thickness of 2.4 m.
- Compared to the previous MRE, the new MRE incorporates a part of the 2020‒2021 drill results (+ 5,066.6 m of drilling in 22 surface diamond drillholes (DDH), and + 12,729.3 m in 131 underground DDH) and uses a block modelling methodology with the interpretation and 3D modelling of 166 mineralized zones. In the previous MRE, the mineral resource was estimated using the polygonal methodology in 2D with a total of 63 mineralized zones.
- Approximately 24,700 metres of the ongoing 42,500-metre diamond drilling program are not included in the current MRE.
MONTREAL, Aug. 24, 2021 (GLOBE NEWSWIRE) -- MONARCH MINING CORPORATION (“Monarch” or the “Corporation”) (TSX: GBAR) (OTCQX: GBARF) announces that it has filed on SEDAR a National Instrument 43-101 technical report for its Beaufor Mine project. Monarch published a press release on July 28, 2021 (see press release), which summarized the assumptions and key results contained in the technical report. There are no material differences between the assumptions and estimates contained in Monarch’s press release dated July 28, 2021, pertaining to this property, from those contained in the technical report that was filed today, and which is available on Monarch’s website (see technical report).
The technical and scientific content of this press release has been reviewed and approved by Christian Tessier, P.Geo., the Corporation’s qualified person under National Instrument 43-101.
About Monarch
Monarch Mining Corporation (TSX: GBAR) is a fully integrated mining company that owns four advanced projects, including the fully permitted past-producing Beaufor Mine, which has produced more than 1 million ounces of gold over the last 30 years. Other advanced assets include the Croinor Gold, McKenzie Break and Swanson properties, all located near Monarch’s wholly owned and fully permitted Beacon 750 tpd mill. Monarch owns 28,702 hectares (287 km2) of mining assets in the prolific Abitibi mining camp that host 714,982 ounces of combined measured and indicated gold resources and 421,793 ounces of combined inferred resources.
Forward-Looking Statements
The forward-looking statements in this press release involve known and unknown risks, uncertainties and other factors that may cause Monarch’s actual results, performance and achievements to be materially different from the results, performance or achievements expressed or implied therein. Neither TSX nor its Regulation Services Provider (as that term is defined in the policies of the TSX) accepts responsibility for the adequacy or accuracy of this press release.
FOR MORE INFORMATION: | |
Jean-Marc Lacoste President and Chief Executive Officer | 1-888-994-4465 jm.lacoste@monarchmining.com |
Mathieu Séguin Vice President, Corporate Development | 1-888-994-4465 m.seguin@monarchmining.com |
Elisabeth Tremblay Senior Geologist – Communications Specialist | 1-888-994-4465 e.tremblay@monarchmining.com |
Table 1: Monarch combined gold resources
Tonnes (metric) | Grade (g/t Au) | Ounces | |
Beaufor Mine1 | |||
Measured Resources | 328,500 | 5.7 | 59,900 |
Indicated Resources | 956,400 | 5.2 | 159,300 |
Total Measured and Indicated | 1,284,900 | 5.3 | 219,200 |
Total Inferred | 818,900 | 4.7 | 122,500 |
Croinor Gold2 | |||
Measured Resources | 80,100 | 8.44 | 21,700 |
Indicated Resources | 724,500 | 9.20 | 214,300 |
Total Measured and Indicated | 804,600 | 9.12 | 236,000 |
Total Inferred | 160,800 | 7.42 | 38,400 |
McKenzie Break3 | |||
In-pit | |||
Total Indicated | 1,441,377 | 1.80 | 83,305 |
Total Inferred | 2,243,562 | 1.44 | 104,038 |
Underground | |||
Total Indicated | 387,720 | 5.03 | 62,677 |
Total Inferred | 1,083,503 | 4.21 | 146,555 |
Swanson4 | |||
In-pit | |||
Total Indicated | 1,864,000 | 1.76 | 105,400 |
Total Inferred | 29,000 | 2.46 | 2,300 |
Underground | |||
Total Indicated | 91,000 | 2.86 | 8,400 |
Total Inferred | 87,000 | 2.87 | 8,000 |
TOTAL COMBINED5 Measured and Indicated Resources Inferred Resources | 714,982 421,793 | ||
1 Source: Mineral Resource Estimate of the Beaufor Mine Project, July 23, 2021, Val-d’Or, Québec, Canada, Charlotte Athurion, P. Geo., Clovis Auger, P. Geo. and Dario Evangelista P. Eng., BBA Inc. 2 Source: Monarch Gold prefeasibility study (January 19, 2018) and resource estimate (January 8, 2016). This resource estimate was prepared for Monarch Gold and has not been reviewed by a qualified person for Monarch Mining as required under National Instrument 43-101 and is thus considered as an historical estimate. 3 Source: NI 43-101 Technical Evaluation Report on the McKenzie Break Property, February 1, 2021, Val-d’Or, Québec, Canada, Alain-Jean Beauregard, P.Geo., Daniel Gaudreault, P.Eng., Geologica Groupe-Conseil Inc., and Merouane Rachidi, P.Geo., Claude Duplessis, P.Eng., GoldMinds GeoServices Inc. 4 Source: NI 43-101 Technical Report and Mineral Resource Estimate for the Swanson Project, January 22, 2021, Val-d’Or, Québec, Canada, Christine Beausoleil, P. Geo. and Alain Carrier, P. Geo., InnovExplo Inc. 5 Numbers may not add up due to rounding. |
FAQ
What are the latest mineral resource estimates for Monarch Mining's Beaufor Mine (GBARF)?
How much has the inferred resource increased at Beaufor Mine in 2021?
What methodology was used for the mineral resource estimate at Beaufor Mine?
How many mineralized zones are included in the new resource estimate for Beaufor Mine?