First Mining Gold Corp. (FFMGF) has announced its 2025 exploration program at the Duparquet Gold Project in Quebec's Abitibi region. The company plans to execute its largest exploration campaign since acquiring the project in 2022, targeting approximately 18,000 meters of drilling.
The program builds on previous success, including 20,000 meters of exploration drilling completed over the last two years and 270,000 meters of historical drilling data. Notable achievements include new discoveries at Miroir, Aiguille (2024), and Buzz (2023) zones, along with successful resource extension targets at Valentre, North Zone, DCD, and East Extension.
The 2025 program will commence in March with Phase 3B winter drilling, starting with one rig targeting 3,000 meters. A second drill rig will join in Q2 2025 for Phase 4, adding 15,000 meters of exploration drilling focusing on the North Zone, Buzz, Miroir, Aiguille, and South Zone targets.
First Mining Gold Corp. (FFMGF) ha annunciato il suo programma di esplorazione per il 2025 presso il Duparquet Gold Project nella regione dell'Abitibi in Quebec. L'azienda prevede di eseguire la sua più grande campagna di esplorazione da quando ha acquisito il progetto nel 2022, mirando a circa 18.000 metri di perforazione.
Il programma si basa su successi precedenti, inclusi 20.000 metri di perforazione esplorativa completati negli ultimi due anni e 270.000 metri di dati storici di perforazione. Tra i risultati notevoli ci sono nuove scoperte nelle zone Miroir, Aiguille (2024) e Buzz (2023), insieme a obiettivi di estensione delle risorse di successo a Valentre, North Zone, DCD e East Extension.
Il programma del 2025 inizierà a marzo con la perforazione invernale della Fase 3B, partendo con un impianto che mira a 3.000 metri. Un secondo impianto di perforazione si unirà nel secondo trimestre del 2025 per la Fase 4, aggiungendo 15.000 metri di perforazione esplorativa concentrandosi sugli obiettivi della North Zone, Buzz, Miroir, Aiguille e South Zone.
First Mining Gold Corp. (FFMGF) ha anunciado su programa de exploración para 2025 en el Duparquet Gold Project en la región de Abitibi en Quebec. La empresa planea ejecutar su campaña de exploración más grande desde que adquirió el proyecto en 2022, apuntando a aproximadamente 18,000 metros de perforación.
El programa se basa en éxitos anteriores, incluidos 20,000 metros de perforación exploratoria completados en los últimos dos años y 270,000 metros de datos históricos de perforación. Logros notables incluyen nuevos descubrimientos en las zonas Miroir, Aiguille (2024) y Buzz (2023), junto con objetivos de extensión de recursos exitosos en Valentre, North Zone, DCD y East Extension.
El programa de 2025 comenzará en marzo con la perforación invernal de la Fase 3B, comenzando con una plataforma que apunta a 3,000 metros. Una segunda plataforma de perforación se unirá en el segundo trimestre de 2025 para la Fase 4, añadiendo 15,000 metros de perforación exploratoria enfocándose en los objetivos de North Zone, Buzz, Miroir, Aiguille y South Zone.
퍼스트 마이닝 골드 Corp. (FFMGF)는 퀘벡의 아비티비 지역에 있는 듀파르케 금 프로젝트에 대한 2025년 탐사 프로그램을 발표했습니다. 이 회사는 2022년에 프로젝트를 인수한 이후 최대 탐사 캠페인을 실행할 계획이며, 약 18,000미터의 시추를 목표로 하고 있습니다.
이 프로그램은 지난 2년 동안 완료된 20,000미터의 탐사 시추와 270,000미터의 역사적 시추 데이터를 포함한 이전의 성공을 기반으로 하고 있습니다. 주목할 만한 성과로는 미로와 아귀유(2024), 버즈(2023) 구역에서의 새로운 발견과 발랑트르, 노스 존, DCD 및 이스트 익스텐션에서의 자원 확장 목표의 성공이 있습니다.
2025년 프로그램은 3월에 겨울 시추의 3B 단계로 시작되며, 3,000미터를 목표로 하는 한 대의 장비로 시작합니다. 두 번째 시추 장비는 2025년 2분기에 4단계에 합류하여 노스 존, 버즈, 미로, 아귀유 및 사우스 존 목표에 초점을 맞춘 15,000미터의 탐사 시추를 추가할 것입니다.
First Mining Gold Corp. (FFMGF) a annoncé son programme d'exploration pour 2025 au Duparquet Gold Project dans la région de l'Abitibi au Québec. L'entreprise prévoit d'exécuter sa plus grande campagne d'exploration depuis l'acquisition du projet en 2022, ciblant environ 18 000 mètres de forage.
Le programme s'appuie sur des succès antérieurs, y compris 20 000 mètres de forage d'exploration réalisés au cours des deux dernières années et 270 000 mètres de données de forage historiques. Parmi les réalisations notables, on trouve de nouvelles découvertes dans les zones Miroir, Aiguille (2024) et Buzz (2023), ainsi que des cibles d'extension de ressources réussies à Valentre, North Zone, DCD et East Extension.
Le programme de 2025 commencera en mars avec le forage hivernal de la phase 3B, débutant avec une foreuse visant 3 000 mètres. Une seconde foreuse rejoindra le programme au deuxième trimestre 2025 pour la phase 4, ajoutant 15 000 mètres de forage d'exploration axé sur les cibles de la North Zone, Buzz, Miroir, Aiguille et South Zone.
First Mining Gold Corp. (FFMGF) hat sein Erkundungsprogramm für 2025 im Duparquet Gold Project in der Abitibi-Region von Quebec angekündigt. Das Unternehmen plant, seine größte Erkundungskampagne seit der Übernahme des Projekts im Jahr 2022 durchzuführen, mit dem Ziel, etwa 18.000 Meter zu bohren.
Das Programm baut auf früheren Erfolgen auf, darunter 20.000 Meter Erkundungsbohrungen, die in den letzten zwei Jahren abgeschlossen wurden, sowie 270.000 Meter historische Bohrdaten. Zu den bemerkenswerten Errungenschaften gehören neue Entdeckungen in den Zonen Miroir, Aiguille (2024) und Buzz (2023) sowie erfolgreiche Ressourcenerweiterungsziele in Valentre, North Zone, DCD und East Extension.
Das Programm 2025 beginnt im März mit den Winterbohrungen der Phase 3B, beginnend mit einer Bohranlage, die 3.000 Meter anvisiert. Eine zweite Bohranlage wird im 2. Quartal 2025 für Phase 4 hinzukommen und 15.000 Meter Erkundungsbohrungen hinzufügen, die sich auf die Ziele der North Zone, Buzz, Miroir, Aiguille und South Zone konzentrieren.
- Largest exploration program since acquisition with 18,000m planned drilling
- Multiple new discovery zones identified (Miroir, Aiguille, Buzz)
- Successful resource extensions demonstrated at multiple targets
- Extensive historical data (270,000m) provides strong foundation
- None.
The Company commenced its maiden drill program at the Duparquet Project in May 2023. Over the last two years, First Mining has completed approximately 20,000 m of exploration drilling combined with significant updated geoscience modelling and targeting. The exploration strategy continues to be guided by further advancing resource confidence, as well as developing extension and discovery-level targets spanning the approximately 5,800 hectare mineral tenure which covers a 19 km strike length of the highly prospective Destor-Porcupine Fault Zone ("DPFZ"). Initial drill rig mobilization to the property will commence during the first week of March 2025.
"We are excited to embark on a new exploration program that will almost double the amount of drilling completed to date since First Mining acquired the Duparquet Project in 2022," stated Dan Wilton, CEO of First Mining. "In addition to the 20,000 m of drilling First Mining has completed, the Company inherited 270,000 m of historical drilling at the Project that provides a strong foundation for our understanding of the deposit. We are keen to further advance upon a number of significant exploration opportunities at Duparquet and are extremely excited about potential new catalysts for growth for this important project located in the heart of the Abitibi gold region."
Highlights from the last three phases of drilling programs include the unlocking of new discovery zones at Miroir, Aiguille (2024) and Buzz (2023), successfully demonstrating resource extensional targets along strike and at depth (Valentre, North Zone, DCD and East Extension), as well as delineating higher-grade zones within key mineralization areas (CDHG, Valentre and North Zone) (see Figure 1, Figure 2 and Table 1 for assay results). In addition, new favourable host lithologies and structures were identified, with significant results returned within mafic volcanic units to the north of the main resource at the North Zone and Miroir targets, and similarly from the south at the Buzz and Aiguille targets, which are hosted in brecciated units in contact with sediments.
The 2025 exploration drilling program and target selection is supported by a robust geoscience foundation and a comprehensive target catalogue. This framework has been refined through two years of exploration activities, including a property-wide, high-resolution airborne geophysical and LiDAR survey. Additionally, a two-phase 3D Leapfrog geological model update was completed, integrating key geological features across the entire mineral tenure. The Company also conducted two summer field prospecting and mapping campaigns to further advance and refine regional targets.
The exploration program will commence in March 2025 with the Phase 3B winter program, starting with one drill rig and targeting approximately 3,000 m of drilling. The first target of the program will be at the recent discovery zone, Miroir, after which further extensional opportunities at the Central Duparquet-Valentre-Dumico ("CVD") and East Extension ("EEXT") targets will be drill tested, concluding with the drill testing of a regional exploration target.
The Company will aim to bring on a second drill rig in Q2 2025 for the Phase 4 program which will be focused on further advancing select targets, namely the North Zone, Buzz, Miroir, Aiguille, and South Zone, and on select resource growth as well as regional targets for an additional forecasted 15,000 metres of exploration drilling for the year.
The 2025 exploration outlook for the Company is to continue to demonstrate that the Duparquet Project has significant exploration potential and that a geoscience systems approach to exploration strategy execution can unlock further value for the Project, which is underpinned by a meaningful resource foundation.
Table 1: Highlights from Previously Disclosed Exploration Drill Results from the Duparquet Gold Project at Select Targets that will be the Focus for the 2025 Drill Program
Hole ID | From (m) | To (m) | Length (m) | Grade (Au g/t) | Target | |
DUP24-048 | 6.75 | 26.1 | 19.35 | 3.12 | Miroir | |
DUP24-048 | inc. | 15.5 | 25.1 | 9.6 | 5.47 | Miroir |
DUP24-048 | inc. | 22.1 | 25.1 | 3.0 | 11.26 | Miroir |
DUP24-044 | 545.9 | 549.0 | 3.1 | 8.99 | Aiguille | |
DUP24-044 | inc. | 548.0 | 549.0 | 1.0 | 15.50 | Aiguille |
DUP24-036 | 215.20 | 225.40 | 10.20 | 3.27 | Valentre | |
DUP24-036 | inc. | 220.50 | 225.40 | 4.90 | 5.23 | Valentre |
DUP24-035 | 157.30 | 160.50 | 3.20 | 4.14 | Valentre | |
DUP24-035 | inc. | 159.40 | 160.00 | 0.60 | 9.42 | Valentre |
DUP24-026 | 163.00 | 171.70 | 8.70 | 3.98 | Valentre | |
DUP24-024 | 448.4 | 453.7 | 5.3 | 10.67 | North Zone | |
DUP24-024 | 476.0 | 485.0 | 9.0 | 6.63 | North Zone | |
DUP24-024 | 488.5 | 522.0 | 33.5 | 3.04 | North Zone | |
DUP24-024 | 534.0 | 567.0 | 33.0 | 5.97 | North Zone | |
DUP23-008 | 243 | 254 | 11 | 2.83 | CDHG Zone | |
DUP23-005 | 306 | 312.15 | 6.15 | 2.73 | CDHG Zone | |
DUP23-002 | 450.8 | 455.4 | 4.60 | 6.52 | Buzz | |
DUP23-002 | inc. | 452.6 | 454.4 | 1.80 | 12.82 | Buzz |
DUP23-002 | inc. | 453.5 | 454.4 | 0.90 | 18.60 | Buzz |
DUP23-002 | 582.0 | 592.4 | 10.40 | 1.19 | Buzz | |
DUP23-002 | inc. | 587.8 | 588.5 | 0.70 | 3.97 | Buzz |
2025 Exploration Drilling Focus
The 2025 exploration programs at the Duparquet Project will be focused on further defining and characterizing the controls on mineralization, as well as drill testing the extent of the mineralization at the newly discovered Miroir and Aiguille targets and further advancing and testing up to four resource expansion targets at depth and along strike. The First Mining exploration teams have been focusing on updating target models with data from the 2024 drilling and field programs, and by integrating the latest results into the multi-layered geoscience data model, have further delineated key zones for resource expansion and discovery potential.
The North Zone is a priority drilling area for the Company, and the aim is to target higher-grade zones at depth and below the existing mineral resource (Figure 3). The North Zone returned multiple significant intercepts in drill hole DUP24-024 (see Table 1) and this hole, as well as subsequent holes drilled in 2024, supports and demonstrates that there is a secondary higher-grade control on the mineralization on the northern contact of the main deposit which will be the targeting priority for depth extension targets.
The CVD target area has evolved significantly over the last two years of drilling and the Company has drill tested a 175 m strike target (Valentre) and demonstrated the continuity in mineralization with 142 unique mineralized intercepts in 16 drill holes. The focus of the 2025 follow-up programs at the CVD area is to extend the mineralization at depth, drill test the higher-grade zones delineated and ensure the target area is drilled to a confidence level sufficient for incorporation into a future resource model update (Figure 4).
Final Disclosure of 2024 Assay Results
The final assay results from the remaining three drill holes of the 2024 program are listed in Table 2, with drill hole location details presented in Table 3.
The Donchester Central Duparquet Zone ("DCD") drilling strategy was focused on potential resource expansion along strike towards the eastern edge of the North and South Zones. Gold mineralization encountered at the DCD Zone consists of brecciated silica-altered basalt units, with up to
The exploration drilling at the DCD and EEXT Zones was successful in intersecting mineralization along strike of the existing mineral resource. Follow-up exploration along these target zones will aim to further validate and delineate the controls on the mineralization and results from the recent drilling of these and other targets on the property will be incorporated into an updated target model to vector towards broader and higher-grade gold zones.
Table 2: Remaining Assay Results from 2024 Phase 3 Drill Program
Hole ID | From (m) | To (m) | Length (m) | Grade (Au g/t) | Target | |
DUP24-042 | 68.4 | 70.0 | 1.6 | 1.58 |
DCD | |
DUP24-042 | 92.0 | 93.0 | 1.0 | 0.50 | ||
DUP24-042 | 122.0 | 127.2 | 5.2 | 4.02 | ||
DUP24-042 | 135.5 | 136.2 | 0.7 | 0.55 | ||
DUP24-045 | 188.85 | 190.0 | 1.15 | 11.07 |
DCD | |
DUP24-045 | 213.35 | 214.15 | 0.8 | 2.13 | ||
DUP24-045 | 252.8 | 254.05 | 1.25 | 1.55 | ||
DUP24-045 | 262.3 | 263.0 | 0.7 | 0.50 | ||
DUP24-045 | 273.0 | 274.0 | 1.0 | 0.88 | ||
DUP24-045 | 276.8 | 277.55 | 0.75 | 0.55 | ||
DUP24-046 | 136.7 | 137.45 | 0.75 | 0.53 |
East Extension | |
DUP24-046 | 165.4 | 169.0 | 3.6 | 0.51 | ||
DUP24-046 | 183.8 | 185.65 | 1.85 | 2.49 | ||
DUP24-046 | 194.25 | 197.75 | 3.5 | 0.98 | ||
DUP24-046 | 200.0 | 201.0 | 1.0 | 0.70 | ||
DUP24-046 | 206.0 | 207.0 | 1.0 | 0.94 | ||
DUP24-046 | 210.0 | 212.0 | 2.0 | 5.61 | ||
DUP24-046 | inc. | 210.0 | 211.0 | 1.0 | 9.95 | |
DUP24-046 | 217.0 | 219.85 | 2.85 | 0.84 | ||
DUP24-046 | 228.5 | 229.25 | 0.75 | 0.49 | ||
DUP24-046 | 233.8 | 234.8 | 1.0 | 0.68 |
*Reported intervals are drilled core lengths (true widths are estimated at 75 |
Table 3: 2024 Phase 3 Drill Hole Locations, DCD and EEXT Targets
Hole ID | Azimuth (°) | Dip (°) | Length (m) | Easting | Northing |
DUP24-042 | 170 | -55 | 198 | 632871 | 5374214 |
DUP24-045 | 180 | -63 | 279 | 632756 | 5374263 |
DUP24-046 | 180 | -47 | 249 | 634347 | 5374018 |
Note: Collar coordinates in UTM NAD 83 z17 |
About the Duparquet Gold Project
The Duparquet Project is geologically situated in the southern part of the Abitibi Greenstone Belt and is geographically located approximately 50 km north of the city of
The Duparquet Project totals approximately 5,800 hectares focused on an area of 19 km of strike length along the prolific Destor-Porcupine Fault Zone, along with numerous mineralized splays and influential secondary lineaments. The Duparquet Project includes the past-producing Beattie, Donchester and Duquesne mines as well as the
1 Further details on the Duparquet PEA can be found in the technical report entitled "NI 43-101 Technical Report: Preliminary Economic Assessment, Duparquet Gold Project, |
Analytical Laboratory and QA/QC Procedures
All sampling completed by First Mining within its exploration programs is subject to a Company standard of internal quality control and quality assurance (QA/QC) programs which include the insertion of certified reference materials, blank materials and a level of duplicate analysis. Core samples from the 2024 drilling program at
Qualified Person
James Maxwell, P.Geo., VP, Exploration and Project Operations for First Mining, is a "Qualified Person" for the purposes of NI 43-101 Standards of Disclosure for Mineral Projects and has reviewed and approved the scientific and technical disclosure contained in this news release.
About First Mining Gold Corp.
First Mining is a gold developer advancing two of the largest gold projects in
First Mining was established in 2015 by Mr. Keith Neumeyer, founding President and CEO of First Majestic Silver Corp.
ON BEHALF OF FIRST MINING GOLD CORP.
Daniel W. Wilton
Chief Executive Officer and Director
Cautionary Note Regarding Forward-Looking Statements
This news release includes certain "forward-looking information" and "forward-looking statements" (collectively "forward-looking statements") within the meaning of applicable Canadian and
Forward-looking statements in this news release relate to future events or future performance and reflect current estimates, predictions, expectations or beliefs regarding future events. All forward-looking statements are based on First Mining's or its consultants' current beliefs as well as various assumptions made by them and information currently available to them. There can be no assurance that such statements will prove to be accurate, and actual results and future events could differ materially from those anticipated in such statements. Forward-looking statements reflect the beliefs, opinions and projections on the date the statements are made and are based upon a number of assumptions and estimates that, while considered reasonable by the respective parties, are inherently subject to significant business, economic, competitive, political and social uncertainties and contingencies. Such factors include, without limitation the Company's business, operations and financial condition potentially being materially adversely affected by the outbreak of epidemics, pandemics or other health crises, and by reactions by government and private actors to such outbreaks; risks to employee health and safety as a result of the outbreak of epidemics, pandemics or other health crises, that may result in a slowdown or temporary suspension of operations at some or all of the Company's mineral properties as well as its head office; fluctuations in the spot and forward price of gold, silver, base metals or certain other commodities; fluctuations in the currency markets (such as the Canadian dollar versus the
First Mining cautions that the foregoing list of factors that may affect future results is not exhaustive. When relying on our forward-looking statements to make decisions with respect to First Mining, investors and others should carefully consider the foregoing factors and other uncertainties and potential events. First Mining does not undertake to update any forward-looking statement, whether written or oral, that may be made from time to time by the Company or on our behalf, except as required by law.
Cautionary Note to United States Investors
The Company is a "foreign private issuer" as defined in Rule 3b-4 under the United States Securities Exchange Act of 1934, as amended, and is eligible to rely upon the
Technical disclosure contained in this news release has not been prepared in accordance with the requirements of
NI 43-101 is a rule developed by the Canadian Securities Administrators that establishes standards for all public disclosure an issuer makes of scientific and technical information concerning the issuer's material mineral projects.
View original content to download multimedia:https://www.prnewswire.com/news-releases/first-mining-provides-update-on-2025-exploration-program-at-the-duparquet-gold-project-and-mobilizes-first-drilling-rig-302392684.html
SOURCE First Mining Gold Corp.
FAQ
What is the size of First Mining's 2025 drilling program at Duparquet (FFMGF)?
What are the main discovery zones identified in First Mining's (FFMGF) recent Duparquet drilling?
When will First Mining (FFMGF) begin its 2025 Duparquet exploration program?