STOCK TITAN

FenixOro Management To Host Live Webinar Thursday October 8th, 12:00pm EDT

Rhea-AI Impact
(Low)
Rhea-AI Sentiment
(Neutral)
Tags
conferences
Rhea-AI Summary

FenixOro Gold Corp announces a live webinar on October 8, 2020, at 12:00 noon EDT, featuring CEO John Carlesso and VP Exploration Stuart Moller. The webinar will update investors on the ongoing drilling program at the Abriaqui project, which commenced on September 26, aiming for 4500 of the 6000 meters funded. The program targets Buritica-style veins in northwestern Abriaqui, with a geotechnical study for local road upgrades included.

The project is located in a prolific gold region of Colombia, with notable high-grade historical results.

Positive
  • None.
Negative
  • None.

TORONTO, Oct. 07, 2020 (GLOBE NEWSWIRE) -- FenixOro Gold Corp (CSE:FENX, OTCQB:FDVXF, Frankfurt: 8FD) is pleased to advise that CEO John Carlesso and VP Exploration Stuart Moller will host a live webinar on Thursday October 8th at 12:00 noon EDT. The discussion will be focused on providing a progress update on the launch of the Company’s drill program at the Abriaqui project. A Q+A will follow the formal discussion. To attend the webinar please register at bit.ly/30KvxfN

FenixOro CEO John Carlesso stated: “The launch of drilling at Abriaqui represents the most significant milestone in the Company’s history. We are committed to keeping our investors and stakeholders updated on our progress as we enter this exciting period of activity.

The Phase 1 program, initiated on September 26, will include 4500 of the budgeted and fully funded 6000 meters of the initial program (see Press Release dated September 30, 2020). Objectives of the program are a first phase test of the sequence of “Buritica style” mesothermal veins and geophysical anomalies in the northwestern part of the project area. As part of its ongoing local community initiative a geotechnical program utilizing the same drill holes will determine rock quality for a road upgrade in cooperation with the Municipality of Abriaqui.

About FenixOro Gold Corp.

FenixOro Gold Corp is a Canadian company focused on acquiring gold projects with world class exploration potential in the most prolific gold producing regions of Colombia. FenixOro’s flagship property, the Abriaqui project, is located 15 km west of Continental Gold’s Buritica project in Antioquia State at the northern end of the Mid-Cauca gold belt, a geological trend which has seen multiple large gold discoveries in the past 10 years including Buritica and Anglo Gold’s Nuevo Chaquiro and La Colosa. As documented in “NI 43-101 Technical Report on the Abriaqui project Antioquia State, Colombia” (December 5, 2019), the geological characteristics of Abriaqui and Buritica are very similar. The report also documents the high gold grade at Abriaqui with samples taken from 20 of the veins assaying greater than 20 g/t gold. Abriaqui has not yet been drilled but surface and underground geological mapping and sampling as well as a preliminary magnetometry survey have been completed.

FenixOro’s VP of Exploration, Stuart Moller, led the discovery team at Buritica for Continental Gold in 2007-2011. The Buritica Mine currently contains measured plus indicated resources of 5.32 million ounces of gold (16.02 Mt grading 10.32 g/t) plus a 6.02 million ounce inferred resource (21.87 Mt grading 8.56 g/t) for a total of 11.34 million ounces of gold resources. Buritica is scheduled to commence production in 2020 with annual average production of 250,000 ounces at an all-in sustaining cost of approximately US$600 per ounce. Resources, cost and production data are taken from Continental Gold’s “NI 43-101 Buritica Mineral Resource 2019-01, Antioquia, Colombia, 18 March, 2019”). Continental Gold was recently the subject of a takeover by Zijin Mining in an all-cash transaction valued at C$1.4 billion.

FenixOro Gold Corp

350 Bay St. Suite 700

Toronto, ON

Telephone: 1-833-ORO-GOLD

Email: info@FenixOro.com

Website: www.FenixOro.com

Technical Information

The comparison between Abriaqui and the nearby Buritica project is meant only to indicate the similarities between the two in terms of geological setting. FenixOro does not imply that exploration results and/or economic characteristics of a potential future mine at Abriaqui will be similar to those seen at Buritica. The sampling done at Abriaqui is in the form of rock chip and channel samples on surface and in shallow underground workings on vein exposures. The samples were prepared and analyzed at ALS laboratories in Medellin and Lima respectively. Samples were taken, prepared, shipped and analyzed following, industry standard QA/QC protocols and were submitted with certified reference standards.

Stuart A Moller, P. Geol. (British Colombia) Vice President of Exploration of FenixOro and a Qualified Person for the purposes of National Instrument 43-101, has reviewed and approved the technical information contained within this press release. Mr, Moller is a geologist with over 40 years of experience in world-wide mineral exploration including 10 years in Colombia.

Cautionary Statement on Forward-Looking Information

This news release contains certain "forward-looking information" within the meaning of applicable Canadian securities legislation and may also contain statements that may constitute "forward-looking statements" within the meaning of the safe harbor provisions of the United States Private Securities Litigation Reform Act of 1995. Such forward-looking information and forward-looking statements are not representative of historical facts or information or current condition, but instead represent only the Company's beliefs regarding future events, plans or objectives, many of which, by their nature, are inherently uncertain and outside of FenixOro's control. Generally, such forward-looking information or forward-looking statements can be identified by the use of forward-looking terminology such as "will", "plans", "expects" or "does not expect", "is expected", "budget", "scheduled", "estimates", "forecasts", "intends", "anticipates" or "does not anticipate", or "believes", or variations of such words and phrases or may contain statements that certain actions, events or results "may", "could", "would", "might" or "will be taken", "will continue", "will occur" or "will be achieved". The forward-looking information and forward-looking statements contained herein include, but are not limited to information concerning the Abriaqui. Although FenixOro believes that the assumptions and factors used in preparing, and the expectations contained in, the forward-looking information and statements are reasonable, undue reliance should not be placed on such information and statements, and no assurance or guarantee can be given that such forward-looking information and statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such information and statements. In particular, there is no guarantee that Abriaqui will be drilled or produce viable quantities of minerals, that the Company will pursue Abriaqui or that any mineral deposits will be found. The forward-looking information and forward-looking statements contained in this news release are made as of the date of this press release, and FenixOro does not undertake to update any forward-looking information and/or forward-looking statements that are contained or referenced herein, except in accordance with applicable securities laws.

Neither the Canadian Securities Exchange nor its Market Regulator (as defined in the policies of the Canadian Securities Exchange) accept responsibility for the adequacy or accuracy of this release.

FAQ

What is the date and time of the FenixOro webinar?

The FenixOro webinar is scheduled for October 8, 2020, at 12:00 noon EDT.

What will be discussed during the FenixOro webinar?

The webinar will provide a progress update on the drilling program at the Abriaqui project.

When did FenixOro start the drilling program at Abriaqui?

FenixOro launched the drilling program at Abriaqui on September 26, 2020.

How many meters are planned for the initial drilling program at Abriaqui?

The initial drilling program at Abriaqui is budgeted for 6000 meters, with 4500 meters underway.

What geological targets are being explored at Abriaqui?

The drilling program targets Buritica-style mesothermal veins and geophysical anomalies.

What significant milestone did FenixOro achieve with the Abriaqui project?

The launch of drilling at Abriaqui is considered the most significant milestone in FenixOro's history.

Where is the Abriaqui project located?

The Abriaqui project is located 15 km west of the Buritica project in Antioquia, Colombia.

What is the stock symbol for FenixOro?

The stock symbol for FenixOro is FDVXF.

FENIXORO GOLD CORP

OTC:FDVXF

FDVXF Rankings

FDVXF Latest News

FDVXF Stock Data

8.66M
107.87M
0.11%
Gold
Basic Materials
Link
United States of America
Toronto