Grid Battery Metals Files NI 43-101 Technical Report on its Clayton Valley Lithium Project in Nevada
- None.
- None.
COQUITLAM, BC / ACCESSWIRE / March 6, 2024 / Grid Battery Metals Inc. (the "Company" or "Grid Battery") (TSXV:CELL)(OTCQB:EVKRF)(FRA:NMK2) is pleased to announce that the NI 43-101 Technical Report for Grid's Clayton Valley Lithium Project, dated March 4, 2024, prepared by Mr. Steven McMillin P.G. of Rangefront Geological, has been filed on SEDAR+ (www.sedarplus.ca) and can be viewed on the Company's website at Clayton Valley Technical Report.
At the Clayton Valley Lithium Project, the Company contracted the services of Rangefront to perform an updated and revised NI 43-101 Technical Report. To complete the Technical Report, the Company used the results of prior soil samples, geophysical surveys, and drilling on the property, to help identify structure and target areas favorable to lithium accumulation and determine next steps for its overall exploration plan. The recommended 2024 exploration plan includes additional CSAMT geophysical survey work, additional soil sampling, and a subsequent multi-hole exploratory drilling program on the property.
Mr. Tim Fernback Grid President & CEO comments "We are happy to report the filing of the NI 43-101 Technical Report on our Clayton Valley Lithium Project. The recommendation for future exploration ultimately includes a drilling program as a logical next step here on the property. The timing is good for the Company, and with approximately CAD
Mr. Fernback continues "Clayton Valley holds the only producing lithium brine system in the United States and holds amazing potential for lithium clay-hosted deposits. Our lithium claims in Clayton Valley are bordering the Silver Peak Lithium Project of Albemarle Corporation (NYSE:ALB), home to the only producing lithium mine in North America. Previously, Albemarle Corporation announced that it will continue to invest in its Silver Peak mine in order to double lithium production by the year 2025. Another neighbour of ours to the east, Century Lithium Corp. (TSXV:LCE)(OTCQX:CYDVF), has issued a pre-feasibility study referencing a
Clayton Valley Property
It should be noted that results from any adjacent property(s) are not an indication of what may be found on the Company's property(s).
About Rangefront Geological
Elko Nevada-based Rangefront Geological has combined in-depth expertise with cutting-edge technology to provide mining consulting services, contract labor, field crew services, and vehicular support to the mining industry. With services available across North America, Rangefront works closely with its clients to provide high-quality mineral exploration services.
Qualified Person
Mr. Steven McMillin, P.G. is a Qualified Person as defined by National Instrument 43-101 and has approved the technical information contained within this news release.
About Grid Battery Metals Inc.
Grid Battery Metals Inc. is a Canadian based exploration company whose primary listing is on the TSX Venture Exchange. The Company's maintains a focus on exploration for high value battery metals required for the electric vehicle (EV) market.
www.gridbatterymetals.com
About Texas Springs Property
The Company owns a
The Texas Spring property adjoins the southern border of the Nevada North Lithium Project - owned by Surge Battery Metals Inc. ("Surge") (TSXV:NILI),(OTC:NILIF) and comprised of 725 mineral claims. Surge's first round of drilling identified strongly mineralized lithium bearing clays. The average lithium content within all near surface clay zones intersected in the 2022 drilling program, applying a 1000 ppm cut-off, was 3254 ppm. (Press release March 29, 2023). More recent results have shown higher grade lithium up to 8070 ppm on this property after initial drilling (Press release September 12, 2023). Our exploration results are on-trend with these results.
About Clayton Valley Lithium Project
The Company owns a
Volt Canyon Lithium Property
The Company owns a
About the British Columbia, Nickel Projects
The Mount Sidney Williams Group consists of three claim blocks with a total area of 10,569 hectares in the area surrounding Mount Sidney Williams, both adjoining and near the Decar project of FPX Nickel Corp., located 100 kilometres northwest of Fort St. James, B.C., in the Omineca mining division. Metallic mineralization includes nickel, cobalt, and chromium. At least some of the nickel mineralization occurs as awaruite. The Mitchell Range Group area claim consists of one claim block covering 8,659 hectares with demonstrated metallic mineralization including nickel, cobalt, and chromium. Nickel cobalt mineralization has not been well explored, but the presence of awaruite has been documented. The Company's B.C. Nickel properties are held within Grid's wholly-owned subsidiary, AC/DC Battery Metals Inc.
The Company has previously announced plans to spin out its wholly-owned subsidiary, AC/DC Battery Metals Inc., finance it separately, and separately list it on the TSX Venture Exchange in 2024. This transaction once complete, will provide a valuable share dividend to each Grid Shareholder of record for no additional cost.
On Behalf of the Board of Directors
"Tim Fernback"
Tim Fernback, President & CEO
Contact Information:
Email: info@gridbatterymetals.com
Phone: 604- 428-5690
Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release. This news release may contain forward-looking statements which include, but are not limited to, comments that involve future events and conditions, which are subject to various risks and uncertainties. Except for statements of historical facts, comments that address resource potential, upcoming work programs, geological interpretations, receipt and security of mineral property titles, availability of funds, and others are forward-looking. Forward-looking statements are not guarantees of future performance and actual results may vary materially from those statements. General business conditions are factors that could cause actual results to vary materially from forward-looking statements. It should be noted that results from any adjacent property(s) are not an indication of what may be found on the Company's property(s).
SOURCE: Grid Battery Metals Inc.
View the original press release on accesswire.com
FAQ
What is the significance of the NI 43-101 Technical Report for Grid Battery Metals Inc.?
How much funding does Grid Battery Metals Inc. have for the 2024 exploration season?
Which neighboring projects are mentioned in the press release?
What is the focus of Grid Battery Metals Inc. in Clayton Valley?