Elevation Gold Mining Corporation (OTCQX: EVGDF) reported Q2 2022 results with gold production of 6,809 ounces and silver production of 28,115 ounces from 768,997 ore tonnes processed. Revenue totaled $14.4 million, driven by the sale of 6,998 ounces of gold at an average price of $1,864 per ounce. The company faced an operational loss of $7.3 million and a net loss of $33.8 million largely due to a non-cash impairment of $33.9 million. Looking ahead, Elevation anticipates increased gold production in H2 2022, with a forecast of 32,000 to 34,000 ounces for the year.
- Gold production expected to increase in H2 2022 due to higher-grade ore from East Pit.
- Forecasted gold sales for 2022 are between 32,000 and 34,000 ounces, indicating strong future performance.
- Operational loss of $7.3 million and net loss of $33.8 million reported for Q2 2022.
- Significant non-cash impairment of $33.9 million affecting financial results.
VANCOUVER, BC, Aug. 29, 2022 /PRNewswire/ - Elevation Gold Mining Corporation (TSXV: ELVT) (OTCQX: EVGDF) (the "Company" or "Elevation Gold") announces operating and financial results for the quarter ended June 30, 2022. All figures are expressed in US dollars unless otherwise noted.
Summary for the Three Months Ended June 30, 2022
- Elevation produced 6,809 ounces of gold and 28,115 ounces of silver during Q2 2022 from 768,997 ore tonnes processed with average grades of 0.42 g/t gold and 2.86 g/t silver.
- The Company generated total revenue of
$14.4 million on 6,998 ounces of gold and 60,903 ounces of silver sold. The average realized price of gold per ounce sold (1) was$1,864 . - Gold production is expected to materially increase in the second half of 2022 as the Company began mining higher-grade ore sourced from the East Pit at the end of June 2022.
- Q2 2022 operating loss of
$7.3 million and net loss of$33.8 million , or$0.31 per share. The net loss was driven by a non-cash impairment of mineral properties of$33.9 million (discussed below). - Total Cash Costs per ounce of gold sold (1) of
$1,661 and all-in sustaining costs ("AISC") per ounce of gold sold (1) of$2,599 . The Company expects to improve on its per ounce metrics in the second half of 2022, with the addition of higher-grade ore sourced from East Pit, and the reduction of capital expenditure requirements as the majority of the Company's major capital projects were completed in Q2 2022 and early Q3 2022. - Completed a multi-phase infill and resource expansion drilling program at the Moss Mine, which included 17,197 meters of reverse circulation drilling up to the end of May 2022. In July 2022, the Company began its maiden exploration program at Florence Hill.
(1) | Refer to the Company's Management Discussion and Analysis for the three and six months ended June 30, 2022 and 2021 for a reconciliation to non-IFRS performance measures. |
Tim Swendseid, Elevation Gold President, stated "Our Q2 financial results were negatively affected by the non-cash write downs of our heap leach inventory and mineral properties, as a consequence of inflationary pressures and lower long term gold price assumptions. With these write downs behind us, I am extremely optimistic about our future production prospects for the remainder of 2022 and beyond." Mr. Swendseid continued, "With our major capital projects for 2022 now completed and with a shift in mining to higher grade east pit ore, we are forecasting a material increase in gold production, at lower costs, over the last 6 months of the year. Gold sales for 2022 are now expected to total between 32,000 and 34,000 ounces. Thanks to our outstanding Moss Mine team we are now functioning at consistent levels with increased crusher throughput, higher gold and silver grades and are well positioned to reach our 2022 production goals."
Dr. Warwick Board, Vice President Exploration, commented: "The first diamond core drill hole at Florence Hill is progressing well, with approximately 730 metres having been drilled to date. We are extending this 45-degree inclined-to-the-northeast drill hole to test a geophysical anomaly at around 1,300 metres down hole based on encouraging structural, vein, and alteration features that are intensifying with depth. We anticipate releasing results for the Florence Hill drilling in Q1 2023, considering drilling rates, assay turn around, data compilation and interpretation requirements."
Following the completion of the Company's equity financing in late March 2022 (see Recent Corporate Developments section above for details), the Company completed a number of key capital projects during Q2 2022, some of which will extend into Q3 2022, including the completion of the construction of the new heap leach pad 2C in July 2022. The Company also completed five new monitoring wells in Q2 2022 and expects to bring on-line two production water wells during Q3 2022. The monitoring wells were a requirement of our Aquifer Protection Permit, while the production water well project will secure water for operations, as well as allow current operating water wells to be removed as part of the mine expansion at the Moss Mine.
The Company's operations continue to focus on overall efficiencies including drilling and blasting improvements that lead to increases in ore processing rates. For Q1 2022, the mine averaged 7,977 stacked ore tonnes per day, an increase of
With its multi-phase infill and resource expansion drilling program at the Moss Mine completed in May 2022, the Company began its maiden exploration program at Florence Hill (see news release dated July 25, 2022).
The following table provides a summary of the components of the Company's net income (loss) for the three and six months ended June 30, 2022 and 2021. For further details, refer to the Company's condensed interim consolidated financial statements and Management Discussion and Analysis ("MD&A") for the same periods.
Three Months Ended June 30, | Six Months Ended June 30, | |||||||
(in thousands of dollars) | 2022 | 2021 | 2022 | 2021 | ||||
Revenue | $ | 14,386 | $ | 16,590 | $ | 27,920 | $ | 32,991 |
Production costs (1) | (17,583) | (10,710) | (28,982) | (20,913) | ||||
Royalties | (726) | (852) | (1,344) | (1,753) | ||||
Mine operating (loss) income before | (3,923) | 5,028 | (2,406) | 10,325 | ||||
Depreciation and depletion (1) | (2,402) | (2,286) | (4,009) | (4,463) | ||||
(Loss) earnings from mine operations | (6,325) | 2,742 | (6,415) | 5,862 | ||||
Corporate administrative expenses | (1,001) | (1,238) | (1,752) | (2,811) | ||||
Finance costs | (1,878) | (1,618) | (3,417) | (3,184) | ||||
Impairment of mineral properties (2) | (33,850) | - | (33,850) | - | ||||
Gain (loss) on revaluation of derivative | 9,253 | 805 | 10,023 | (834) | ||||
Other | (3) | 50 | (100) | 133 | ||||
Income (loss) for the period | $ | (33,804) | $ | 741 | $ | (35,511) | $ | (834) |
1) | During the six months ended June 30, 2022, the Company conducted an independent study which reviewed the Company's estimated recoverable gold and silver ounces in its heap leach ore inventory on June 30, 2022. Based on the findings in the study, the Company has written down heap leach ore inventory by |
As a result of the above, for the six months ended June 30, 2022, the Company recorded a total write-down to heap leach ore and doré inventory of | |
2) | During the three and six months ended June 30, 2022, the Company recognized a non-cash impairment of mineral properties of |
The projected cash flows used in impairment testing are significantly affected by changes in assumptions. The analysis reflects the lower gold prices and inflationary pressures resulting in increases to commodity prices most recently encountered in the second quarter of 2022. Key assumptions included by management in the discounted cash-flow model included a gold price ranging from | |
• a | |
• a | |
• a |
The following table provides a summary of the Company's operational statistics for the three and six months ended June 30, 2022 and 2021. For further details, refer to the Company's MD&A for the same periods.
Three Months Ended June 30, | Six Months Ended June 30, | |||||
2022 | 2021 | 2022 | 2021 | |||
Ore tonnes mined | t | 726,226 | 682,970 | 1,461,443 | 1,388,624 | |
Ore tonnes stacked | t | 768,997 | 640,358 | 1,486,895 | 1,333,045 | |
Contained gold ounces stacked | oz | 10,456 | 9,700 | 18,506 | 20,404 | |
Gold grade | g/t | 0.42 | 0.47 | 0.39 | 0.48 | |
Gold ounces produced | oz | 6,809 | 7,054 | 13,077 | 15,842 | |
Gold ounces sold | oz | 6,998 | 8,045 | 13,510 | 16,166 | |
Average realized gold price (1) | ($/oz) | $ 1,864 | $ 1,793 | $ 1,872 | $ 1,797 | |
Cash costs per ounce of gold sold (1) | ($/oz) | $ 1,661 | $ 1,168 | $ 1,623 | $ 1,158 | |
AISC per ounce of gold sold (1) | ($/oz) | $ 2,599 | $ 2,127 | $ 2,399 | $ 2,181 |
(1) Refer to the Company's Management Discussion and Analysis for the three and six months ended June 30, 2022 and 2021 for a reconciliation to non-IFRS performance measures. |
Unless otherwise indicated, all technical data contained in this press release that relates to geology, exploration and mineral resources has been reviewed and approved by Dr. Warwick Board, P.Geo, Vice President Exploration of Elevation Gold. Dr. Board is a Qualified Person as defined by National Instrument ("NI") 43-101 and is responsible for the Moss Regional and Hercules Exploration Projects.
Unless otherwise indicated, the technical disclosure contained within this press release that relates to the Company's operating mine has been reviewed and approved by Tim J. Swendseid, President of the Company and a Qualified Person for the purpose of NI 43-101.
Full condensed interim consolidated financial statements for the three months and six months ended June 30, 2022 and 2021 and related MD&A for the same period can be found at www.sedar.com and the Company's website at www.elevationgold.com.
The following tables represent the calculation of certain Non-IFRS Financial Measures as referenced in this news release. For further discussion and analysis of all non-IFRS performance measures, refer to the Company's financial statements and MD&A for the three and six months ended June 30, 2022.
Reconciliation of Cash Costs and AISC
Three Months Ended June 30, | Six Months Ended June 30, | ||||||
(in thousands of dollars, except per ounce figures) | 2022 | 2021 | 2022 | 2021 | |||
Gold ounces sold | 6,998 | 8,045 | 13,510 | 16,166 | |||
Cost of sales | $ 20,711 | $ 13,848 | $ 34,335 | $ 27,130 | |||
Less: Heap leach and doré adjustment * | (5,343) | - | (5,769) | - | |||
Less: Depreciation and depletion | (2,402) | (2,286) | (4,009) | (4,463) | |||
Add: Refining and transportation | 80 | 57 | 129 | 151 | |||
Less: Silver and other bi-product revenue | (1,421) | (2,219) | (2,756) | (4,092) | |||
Total Cash Costs | 11,625 | 9,400 | 21,930 | 18,726 | |||
Sustaining capital expenditures | 5,422 | 6,410 | 8,460 | 13,591 | |||
Accretion | 143 | 66 | 262 | 134 | |||
Corporate administration | 1,001 | 1,238 | 1,752 | 2,811 | |||
Total AISC | $ 18,191 | $ 17,114 | $ 32,404 | $ 35,262 | |||
Cash Costs per ounce of gold sold | $ 1,661 | $ 1,168 | $ 1,623 | $ 1,158 | |||
AISC per ounce of gold sold | $ 2,599 | $ 2,127 | $ 2,399 | $ 2,181 |
* Adjustment for heap leach and doré write-down and net realizable value impairment discussed in Consolidated Financial Results Summary above. |
Reconciliation of Average Realized Price of Gold per Ounce Sold
Three Months Ended June 30, | Six Months Ended June 30, | |||||
(in thousands of dollars, except per ounce figures) | 2022 | 2021 | 2022 | 2021 | ||
Gold revenue | $ 13,045 | $ 14,428 | $ 25,293 | $ 29,050 | ||
Gold ounces sold | 6,998 | 8,045 | 13,510 | 16,166 | ||
Average realized price per ounce sold | $ 1,864 | $ 1,793 | $ 1,872 | $ 1,797 | ||
"Tim J. Swendseid"
Tim J. Swendseid, President of Elevation Gold Mining Corporation
Elevation Gold is a publicly listed gold and silver producer, engaged in the acquisition, exploration, development and operation of mineral properties located in the United States. Elevation Gold's common shares are listed on the TSX Venture Exchange ("TSXV") in Canada under the ticker symbol ELVT and on the OTCQX in the United States under the ticker symbol EVGDF. The Company's principal operation is the
Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.
Certain of the statements made and information contained herein is "forward-looking information" within the meaning of applicable Canadian securities laws. All statements other than statements of historical facts included in this document constitute forward-looking information, including but not limited to statements regarding the Company's plans, prospects and business strategies; the Company's guidance on the timing and amount of future production and its expectations regarding the results of operations; expected costs; permitting requirements and timelines; timing and possible outcome of Mineral Resource and Mineral Reserve estimations, life of mine estimates, and mine plans; anticipated exploration and development activities at the Company's projects; net present value; design parameters; economic potential; processing mineralized material; the potential of robust economic potential at the Moss Mine Project. Words such as "believe", "expect", "anticipate", "contemplate", "target", "plan", "goal", "aim", "intend", "continue", "budget", "estimate", "may", "will", "can", "could", "should", "schedule" and similar expressions identify forward-looking statements.
Forward-looking information is necessarily based upon various estimates and assumptions including, without limitation, the expectations and beliefs of management, including that the Company can access financing, appropriate equipment and sufficient labour; assumed and future price of gold, silver and other metals; anticipated costs; ability to achieve goals; and assumptions related to the factors set forth below. While these factors and assumptions are considered reasonable by the Company as at the date of this document in light of management's experience and perception of current conditions and expected developments, these statements are inherently subject to significant business, economic and competitive uncertainties and contingencies. Known and unknown factors could cause actual results to differ materially from those projected in the forward-looking statements and undue reliance should not be placed on such statements and information. Such factors include, but are not limited to: risks inherent in mining, including, but not limited to risks to the environment, industrial accidents, catastrophic equipment failures, unusual or unexpected geological formations or unstable ground conditions, and natural phenomena such as earthquakes, flooding or unusually severe weather; uninsurable risks; global financial conditions and inflation; changes in the Company's share price, and volatility in the equity markets in general; volatility and fluctuations in metal and commodity prices; the threat associated with outbreaks of viruses and infectious diseases, including the COVID-19 virus; delays or the inability to obtain, retain or comply with permits; risks related to negative publicity with respect to the Company or the mining industry in general; health and safety risks; exploration, development or mining results not being consistent with the Company's expectations; unavailable or inaccessible infrastructure and risks related to ageing infrastructure; actual ore mined and/or metal recoveries varying from Mineral Resource and Mineral Reserve estimates, estimates of grade, tonnage, dilution, mine plans and metallurgical and other characteristics; risks associated with the estimation of Mineral Resources and Mineral Reserves and the geology, grade and continuity of mineral deposits, including, but not limited to, models relating thereto; ore processing efficiency; information technology and cybersecurity risks; potential for the allegation of fraud and corruption involving the Company, its customers, suppliers or employees, or the allegation of improper or discriminatory employment practices; regulatory investigations, enforcement, sanctions and/or related or other litigation; estimates of future production and operations; estimates of operating cost estimates; the potential for and effects of labour disputes or other unanticipated difficulties with or shortages of labour or interruptions in production; risks related to the environmental regulation and environmental impact of the Company's operations and products and management thereof; exchange rate fluctuations; climate change; risks relating to attracting and retaining of highly skilled employees; compliance with environmental, health and safety laws; counterparty and credit risks and customer concentration; litigation; changes in laws, regulations or policies including, but not limited to, those related to mining regimes, permitting and approvals, environmental and tailings management, and labour; internal controls; challenges or defects in title; funding requirements and availability of financing; dilution; risks relating to dividends; risks associated with acquisitions and related integration efforts, including the ability to achieve anticipated benefits, unanticipated difficulties or expenditures relating to integration and diversion of management time on integration; uncertainties relating to interpretation of drill results and the geology, continuity and grade of mineral deposits; uncertainty of estimates of capital and operating costs, production estimates and estimated economic return; uncertainty of meeting anticipated program milestones; and other risks and uncertainties including but not limited to those described the Company's public disclosure documents which are available on SEDAR at www.sedar.com under the Company's profile. All of the forward-looking statements made in this document are qualified by these cautionary statements. Although the Company has attempted to identify important factors that could cause actual results to differ materially from those contained in forward-looking information, there may be other factors that cause results not to be as anticipated, estimated, forecast or intended and readers are cautioned that the foregoing list is not exhaustive of all factors and assumptions which may have been used. Should one or more of these risks and uncertainties materialize, or should underlying assumptions prove incorrect, actual results may vary materially from those described in forward-looking information. Accordingly, there can be no assurance that forward-looking information will prove to be accurate and forward-looking information is not a guarantee of future performance. Readers are advised not to place undue reliance on forward-looking information. The forward-looking information contained herein speaks only as of the date of this document. The Company disclaims any intention or obligation to update or revise forward–looking information or to explain any material difference between such and subsequent actual events, except as required by applicable law.
View original content to download multimedia:https://www.prnewswire.com/news-releases/elevation-gold-reports-q2-2022-operating-and-financial-results-301614068.html
SOURCE Elevation Gold Mining Corp.
FAQ
What were Elevation Gold Mining's earnings for Q2 2022?
How much gold did Elevation Gold Mining produce in Q2 2022?
What is Elevation Gold Mining's outlook for gold production in 2022?
What was the average realized gold price for Elevation Gold Mining in Q2 2022?