Eagle Plains Partner Canter Resources Completes Field Program at at Schotts Lake Copper Project
Eagle Plains Resources announced the completion of the 2022 field program at its 100%-owned Schotts Lake Cu-Zn project in Saskatchewan, conducted by partner Canter Resources Corp.. This program included soil and lithogeochemical sampling, with further geophysical modeling planned. Canter has the option to earn a 60% stake by investing $5 million over four years and making cash payments of $500,000. Historical estimates show a resource of approximately 1.98 million tonnes at average grades of 0.61% copper and 1.35% zinc, although these are considered historical and not compliant with current standards.
- Completion of the 2022 field program at Schotts Lake enhances exploration potential.
- Canter Resources can earn a 60% interest through significant exploration investments, which indicates confidence in the project's value.
- Pending analytical results from the fieldwork may delay progress.
- Historical resource estimates are not classified as current mineral resources, raising uncertainty.
CRANBROOK, BC / ACCESSWIRE / July 19, 2022 / Eagle Plains Resources Ltd. (TSX-V:EPL) ("EPL" or "Eagle Plains") has been notified by option partner Canter Resources Corp. (CSE:CRC) that the 2022 field program at EPL's
Canter holds the exclusive right to earn a
2022 Fieldwork
The 2022 field program included soil sampling, lithogeochemical sampling and geological mapping on high priority targets identified by the 2021 EM geophysical survey. Comprehensive geophysical modelling of property geophysical data, including a high resolution 2008 VTEM survey, is underway. The results from this modelling will be used to generate drill targets in areas of known mineralization and in areas outside the Schott's Lake deposit. The 2022 program work was managed by TerraLogic Exploration Services of Cranbrook, BC.
Analytical results from the fieldwork are pending and will be released once they have been received, compiled and interpreted.
See Schotts Lake Property Map here
Schotts Lake Geology and History
The Schotts Lake property hosts metamorphic and intrusive rocks which are dominantly volcanic in origin and associated with an island arc environment. The rocks are folded into an easterly-dipping synform. Mineralization was first discovered in 1953 by Kay Lake Mines. A total of 79 drill holes have been completed for a total of 9516m (31,200') and a historical resource of 1,983,850 tonnes grading
Mineralization at Schotts Lake consists of semi-massive to massive pyrrhotite and pyrite with associated chalcopyrite (copper) and sphalerite (zinc) mineralization. The Schotts Lake deposit is interpreted to be a typical exhalative massive sulphide zone. The mineralized zone has an average thickness of 20.4m, is overturned and lies on the eastern limb of a major north-easterly plunging fold. The deepest mineralized intercept is at a vertical depth of 266 meters with mineralization open to depth.
The following table outlines significant historical drill intercepts:
Table 1- Significant Drill Intercepts-Schotts Lake Project*
Hole ID | Width(m) | From(m) | To(m) | Cu(%) | Zn(%) |
1 | 16.7 | unknown | Unknown | 1.1 | 1.83 |
4 | 0.76 | unknown | Unknown | 4.3 | 3.3 |
13 | 5.8 | 30.4 | 36.2 | 2.5 | 0.17 |
35 | 1.7 | 256.8 | 258.5 | 2.07 | 0.01 |
65 | 15.8 | 82.3 | 98.1 | 0.38 | 1.84 |
66 | 7.6 | 71.6 | 79.2 | 0.96 | 5.48 |
67 | 3.0 | 49.1 | 52.1 | 1.71 | 3.48 |
68 | 17.9 | 133.8 | 151.7 | 0.85 | 1.53 |
69 | 18.3 | 128.2 | 146.5 | 0.53 | 1.09 |
70 | 22.7 | 149.7 | 172.4 | 0.54 | 1.96 |
75 | 27.4 | 183.5 | 210.9 | 0.35 | 2.25 |
* intercepts in the above table refer to actual drilled thickness in meters and may not represent the true thickness of the intercept
2021 exploration activity by Eagle Plains consisted of a ground-based electromagnetic survey over 6.5 line-kms, covering known mineralization and surveying of areas interpreted to have high potential.
Some of the claims have an underlying NSR in favour of Edge Geological Consulting Inc., of which
Charles C. Downie, P.Geo., a "qualified person" for the purposes of National Instrument 43-101 - Standards of Disclosure for Mineral Projects, and a Director of Eagle Plains, has prepared, reviewed, and approved the scientific and technical disclosure in the news release.
About Eagle Plains Resources
Based in Cranbrook, B.C., Eagle Plains is a well-funded, prolific project generator that continues to conduct research, acquire and explore mineral projects throughout western Canada. The Company was formed in 1992 and is the ninth-oldest listed issuer on the TSX-V (and one of only three that has not seen a roll-back or restructuring of its shares). Eagle Plains has continued to deliver shareholder value over the years and through numerous spin-outs has transferred over
The Company is committed to steadily enhancing shareholder value by advancing our diverse portfolio of projects toward discovery through collaborative partnerships and development of a highly experienced technical team. Eagle Plains also holds significant royalty interests in western Canadian projects, covering a broad spectrum of commodities on projects controlled by Cameco Corp., Iso Energy Corp., Denison Mines Corp., Skeena Resources Ltd. and Alexco Resource Corp./Banyan Gold Corp., among others. Management's focus is to advance its most promising exploration projects. Throughout the exploration process, our mission is to help maintain prosperous communities by exploring for and discovering resource opportunities while building lasting relationships through honest and respectful business practices.
Expenditures from 2011-2021 on Eagle Plains-related projects exceed
On behalf of the Board of Directors
"Tim J. Termuende"
President and CEO
For further information on EPL, please contact Mike Labach at 1 866 HUNT ORE (486 8673)
Email: mgl@eagleplains.com or visit our website at https://www.eagleplains.com
Cautionary Note Regarding Forward-Looking Statements
Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release. This news release may contain forward-looking statements including but not limited to comments regarding the timing and content of upcoming work programs, geological interpretations, receipt of property titles, potential mineral recovery processes, etc. Forward-looking statements address future events and conditions and therefore, involve inherent risks and uncertainties. Actual results may differ materially from those currently anticipated in such statements.
SOURCE: Eagle Plains Resources Ltd.
View source version on accesswire.com:
https://www.accesswire.com/708770/Eagle-Plains-Partner-Canter-Resources-Completes-Field-Program-at-at-Schotts-Lake-Copper-Project
FAQ
What is the current status of the Schotts Lake project by Eagle Plains Resources (EGPLF)?
What are the financial commitments made by Canter Resources Corp. for the Schotts Lake project?
What is the historical resource estimate for the Schotts Lake project?
What geological features are associated with the Schotts Lake deposit?